August 17, 2017
SUBJECT:
WASHINGTON STATE UNIVERSITY - U.S. NUCLEAR REGULATORY COMMISSION ROUTINE INSPECTION REPORT NO. 50-027/2017-201
Dear Dr. Keane:
From July 17 - 20, 2017, the U.S. Nuclear Regulatory Commission (NRC) conducted an inspection at your Washington State University TRIGA research reactor located in the Nuclear Science Center. The enclosed report documents the inspection results, which were discussed on July 20, 2017, with Dr. Donald Wall, Director of the Nuclear Science Center, and members of your staff.
The inspection examined activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your license. The inspector reviewed selected procedures and records, observed activities, and interviewed personnel. Based on the results of this inspection, no findings of noncompliance were identified. No response to this letter is required.
In accordance with Title 10 of the Code of Federal Regulations, Section 2.390, Public inspections, exemptions, requests for withholding, a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the NRCs document system (Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Should you have any questions concerning this inspection, please contact Mr. Gary Morlang at 301-415-4092 or electronic mail at Gary.Morlang@nrc.gov.
Sincerely,
/RA/
Anthony J. Mendiola, Chief Research and Test Reactors Oversight Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation
Docket No. 50-27 License No. R-76
Enclosure:
As stated
cc: w/enclosure: See next page
ML17215B522; concurrence via e-mail
NRC-002 OFFICE NRR/DPR/PROB*
NRR/DPR/PROB*
NRR/DPR/PROB NAME GMorlang NParker AMendiola DATE 8/14/17 8/14/17 8/17/17
Washington State University Docket No.50-027
cc:
Director Division of Radiation Protection Department of Health 7171 Cleanwater Lane, Bldg #5 P.O. Box 47827 Olympia, WA 98504-7827
Mr. David Clark, Director Washington State University Radiation Safety Office P.O. Box 641302 Pullman, WA 99164 1302
Dr. Ken Nash Chair Washington State University Reactor Safeguards Committee Nuclear Radiation Center P.O. Box 641300 Pullman, WA 99164 1300
Mr. Corey Hines, Reactor Supervisor Washington State University Nuclear Radiation Center P.O. Box 641300 Pullman, WA 99164 1300
Test, Research and Training Reactor Newsletter P.O. Box 118300 University of Florida Gainesville, FL 32611-8300
U. S. NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR REACTOR REGULATION
Docket No.50-027
License No.
R-076
Report No.
50-027/2017-201
Licensee:
Washington State University
Facility:
Nuclear Science Center
Location:
Pullman, WA
Dates:
July 17 - 20, 2017
Inspector:
Gary Morlang
Approved by:
Anthony J. Mendiola, Chief Research and Test Reactors Oversight Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation
EXECUTIVE SUMMARY
Washington State University Nuclear Science Center NRC Report No. 50-027/2017-201
The primary focus of this routine, announced inspection was the on-site review of selected aspects of the Washington State University (the licensees) Class II research and test reactor safety program including: (1) operations logs and records, (2) surveillance and limiting conditions for operation, (3) experiments, (4) committees, audits and reviews (5) emergency preparedness, (6) maintenance logs and records, and (7) fuel handling since the last U.S.
Nuclear Regulatory Commission (NRC) inspection of these areas. The licensee's program was acceptably directed toward the protection of public health and safety and in compliance with NRC requirements.
Operations Logs and Records
Operational activities were consistent with applicable technical specifications (TSs) and procedural requirements.
Surveillance and Limiting Conditions for Operations
The program for tracking and completing surveillance checks and limiting conditions for operation satisfied TS requirements.
Experiments
Conduct and control of experiments and irradiations met the requirements specified in the TSs, the applicable experiment irradiation authorizations, and associated procedures.
Committees, Audits and Reviews
The review and audit program was being conducted by the Reactor Safeguards Committee.
The composition and meeting frequency satisfied requirements specified in the TSs.
The Emergency Plan (E-Plan) and Implementing Procedures were being reviewed and updated as required.
Emergency response facilities and equipment were being maintained as required and responders were knowledgeable of proper actions to be taken in case of an emergency.
Off-site support was acceptable and communications capabilities were adequate.
Annual drills were being conducted and critiques were being held as required by the E-Plan.
- 2 -
Maintenance Logs and Records
Maintenance logs, records, performance, and reviews satisfied TSs and procedure requirements.
Fuel Handling
Fuel handling activities and documentation were in compliance with the requirements specified in the TSs and procedures.
Enclosure REPORT DETAILS
Summary of Facility Status
The Washington State University (WSU, the licensees) one megawatt (MW) TRIGA research and test reactor continued normal, routine operations. A review of the applicable records indicated that the reactor was operated as needed in support of education, operator training, and irradiation of various materials. During the inspection, the reactor was operated at levels up to one MW and in accordance with applicable procedures to support ongoing irradiation activities.
1.
Operations Logs and Records
a.
Inspection Scope (Inspection Procedure (IP) 69001)
The inspector reviewed selected aspects of the following to verify compliance with technical specification (TS) Section 6.2 and the applicable procedures:
- WSU U.S. Nuclear Regulatory Commission (NRC) TSs dated September 30, 2011
Observation of selected operations activities on July 19, 2017
Scram Summary Log (S.1) entries for 2016 and to date in 2017
Pulsing Summary Log (S.2) entries for 2016 and to date in 2017
Washington State University Nuclear Science Center (WSUNSC)
Maintenance Log (O.8) from January 2016 to present
Reactor Operating Log (O.1) sheets from January 2016 through July 14, 2017, entitled WSU Nuclear Science Center Reactor Log, NRC Form Number (No.) 22, latest form revision (March 2015)
Selected entries on Reactor Start-Up Check-off (O.3) forms entitled WSUNSC Form No. 34, WSU Reactor Start-Up Check-off, latest form revision (October 2016) for 2016 and to date in 2017
WSU Annual Report entitled Annual Report on the Operation of the Washington State University Nuclear Radiation Center TRIGA Reactor, for the periods from July 1, 2015, through June 30, 2016, dated August 19, 2016
WSU Annual Report entitled Annual Report on the Operation of the Washington State University Nuclear Radiation Center TRIGA Reactor, for the periods from July 1, 2014, through June 30, 2015, dated August 7, 2015
WSUNSC Administrative Procedure, Section No. 1, entitled Responsibilities and Authority of Reactor Operating Staff, (not dated)
WSUNSC Standard Operating Procedure (SOP) No. 1, Standard Procedure for Use of the Reactor, (May 9. 2017)
WSUNSC SOP No. 2, Standard Procedure for Startup, Operation, and Shutdown of the Reactor, (May 9, 2017)
b.
Observations and Findings
- 2 -
Reactor operations were carried out following written procedures and in accordance with TS requirements. Shift staffing satisfied the minimum requirements for duty and on-call personnel. Quarterly audits were conducted by Reactor Safeguards Committee (RSC) personnel. Accurate correlation between reactor logs, scram logs, pulse logs, and maintenance logs was noted.
Equipment problems and events were well documented and resolved, with the senior reactor operator (SRO) approval if required for restart of the reactor.
c.
Conclusion
The operational activities were found to be consistent with applicable TS and procedural requirements.
2.
Surveillance and Limiting Conditions for Operations
a.
Inspection Scope (IP 69001)
To verify compliance with TS Sections 3, 4, and 5, the inspector reviewed selected aspects of:
- Reactor Operating Log (O.1) sheets from January 2016 through July 2017, entitled WSU Nuclear Science Center Reactor Log, NRC Form No. 22, latest form revision May 2017
Control Element Inspection Log (O.5) for 2016 and 2017
Monthly Core Reactivity Parameters Log (O.7) for 2016 thru July 2017
Maintenance Log, Volume 1 (O.8), pages 148-158
Preventative Maintenance Checklists (O.2) for 2016 and to date in 2017
RSC meeting minutes for 2016 and 2017
Power Calibration Log forms (also in O.2) for 2016 and to date in 2017
Monthly Console and Auxiliary Equipment Checklist Log (O.9) containing documentation of equipment maintenance as indicated on the WSUNSC Form No. 40, entitled Console Auxiliary Equipment Maintenance Checklist, latest form revision July 2016
WSU Annual Report entitled Annual Report on the Operation of the Washington State University Nuclear Radiation Center TRIGA Reactor, for the periods from July 1, 2015, through June 30, 2016, dated August 19, 2016
WSU Annual Report entitled Annual Report on the Operation of the Washington State University Nuclear Radiation Center TRIGA Reactor, for the periods from July 1, 2014, through June 30, 2015 dated August 7, 2015
WSUNSC SOP No. 5, Standard Procedure for Performing Preventive Maintenance, dated May 9, 2017
WSUNSC SOP No. 11, Standard Procedure for Control Element Maintenance, Removal, and Replacement, dated May 9, 2017
WSUNSC SOP No. 20, Standard Procedure for Performing Power Calibrations, dated May 9, 2017
WSUNSC SOP No. 23, Standard Procedure for Annual Fuel Inspection, dated May 9, 2017
- 3 -
- WSUNSC SOP No. 24, Standard Procedure for Fuel Burnup Calculation, dated May 9, 2017
WSUNSC SOP No. 25, Standard Procedure for Core Changes and Fuel Movement, dated March 12, 2015
b.
Observations and Findings
The Inspector determined that the daily, weekly, monthly, semiannual, annual, and other periodic checks, tests, and verifications for TS required limiting conditions for operation (LCO) were being completed as required. Extensive checklists were used to track completion of the various required surveillances and LCO verifications. The checklists included the date and name that each activity was completed. All recorded results observed by the inspector were within prescribed TSs and procedure parameters and in close agreement with the previous surveillance results.
c.
Conclusion
The surveillance logs, records, performance, and reviews satisfied TSs and procedure requirements. The program for tracking and completing surveillance requirements was detailed and thorough.
3.
Experiments
a.
Inspection Scope (IP 69001)
To verify compliance with the licensees program for conducting experiments and irradiations as outlined in TS Sections 3.6, 4.6, and 6.4.7 and in various procedures, the inspector reviewed selected aspects of:
- WSUNSC Irradiation Data Log sheets for the period from January 2016 to the present
WSUNSC Reactor Operating Log (O.1) sheets from January 2016 to the present
Experiment approvals documented on WSUNSC Form No. 1, entitled Project Initiation Request Form, latest form revision dated March 2011, with the associated experiment overviews, safety reviews and analyses, isotope production data, accident analyses, and approvals
SOP No. 1, Standard Procedure For Use Of The Reactor, latest revision dated March 12, 2015
SOP No. 2, Standard Procedure For Startup, Operations and Shutdown of The Reactor, latest revision dated May 9, 2017
SOP No. 3, Standard Procedure For Performing Experiments Using The Reactor, latest revision dated May 9, 2017
b.
Observations and Findings
- 4 -
Various new experiments had been proposed since the last inspection. The inspector verified that new experiments were reviewed and approved by a SRO and by either the Assistant Facility Director or the Facility Director. Certain experiments were also approved by the RSC when required. The inspector also verified that the experiments were completed under the supervision of the SRO and in accordance with TS requirements.
The inspector reviewed the existing experiment and irradiation authorization documents, Irradiation Data Log sheets, Reactor Logbook, and interviewed staff members. It was noted that the information typically entered on the Irradiation Data Log sheets was now being entered into a data base developed by facility personnel. The appropriate data was recorded and the radioactive material produced was handled and controlled as required.
c.
Conclusion
The conduct and control of experiments and irradiations met the requirements specified in the TSs, the experiment irradiation authorizations, and applicable procedures.
4.
Committees, Audits and Reviews
a.
Inspection Scope (IP 69001)
In order to verify that the licensee had established and conducted reviews and audits as required in TS Section 6.4, the inspector reviewed selected aspects of:
- WSU RSC meeting minutes for 2016 and to date in 2017
Safety review and audit records documented on WSUNSC forms entitled, Reactor Safeguards Committee Facility Records Quarterly Audit, for the period from January 2016 through the present
WSU Annual Report entitled Annual Report on the Operation of the Washington State University Nuclear Radiation Center TRIGA Reactor, for the periods from July 1, 2015, through June 30, 2016, dated August 19, 2016
WSU Annual Report entitled Annual Report on the Operation of the Washington State University Nuclear Radiation Center TRIGA Reactor, for the periods from July 1, 2014, through June 30, 2015, dated August 7, 2015
b.
Observations and Findings
The RSC membership satisfied TS requirements and the Committee's procedural rules. The RSC, or a subcommittee thereof, was required to hold semi-annual meetings each year. It was noted that three committee meetings were held in 2016, and two committee meetings to date in 2017.
Review of the committee meeting minutes indicated that the RSC provided appropriate guidance and direction for reactor operations. Additionally, the annual review of the radiation protection program and the biennial reviews of the
- 5 -
standard operating procedures, the emergency plan (E-Plan), and the security plan had been conducted and documented.
Since the last inspection, audits of reactor facility records and reviews of operating abnormalities, changes to procedures, equipment changes, and proposed tests or experiments had been completed and documented. The inspector noted that audits were conducted during the meetings held by the RSC.
c.
Conclusion
The review and audit program was being completed acceptably by the RSC.
5.
a.
Inspection Scope (IP 69001)
To ensure that the licensee was acceptably implementing the various aspects of their emergency preparedness program, the inspector reviewed selected aspects of:
- WSUNSC SOP No. 15, Standard Procedure for Action in the Event of an Alarm, dated May 9, 2017
Emergency Preparedness Plan for the WSUNSC dated May 21, 2015
Emergency drills and exercises for the past two years
Administrative Requirements Schedule Log (A.4) sheets
Training records for licensee staff and support personnel
Emergency response facilities, supplies, equipment, and instrumentation
Offsite support as documented in the Letter of Agreement with the hospital
WSUNSC Short Form Emergency Procedure, latest revision dated November 21, 2008
WSUNSC SOP No. 14, Standard Procedure in the Event of an Emergency Situation, dated May 9, 2017
b.
Observations and Findings
The E-Plan in use at the facility, entitled Emergency Preparedness Plan for the Nuclear Science Center, Washington State University, was being reviewed and updated as required by TSs.
Emergency facilities, instrumentation, and equipment were being maintained and controlled, and supplies were being inventoried as required in the Emergency Preparedness Plan.
The Inspector determined through records review and through interviews with licensee personnel that emergency responders were knowledgeable of the proper actions to take in case of an emergency. The agreement with the Pullman Regional Hospital, which had been updated May 24, 2016.
- 6 -
Communications capabilities with the various campus, city, and county support groups were acceptable and off-site support for the facility was verified to be acceptable and in accordance with the Emergency Preparedness Plan. The alarm system had been tested weekly and monthly as stipulated in the Emergency Preparedness Plan.
The inspector determined that the emergency drills were being conducted as required by the Emergency Preparedness Plan. Critiques were written following the drills and they addressed problems noted during the conduct of the drill with assigned corrective actions.
c.
Conclusion
The emergency preparedness program was conducted in accordance with the requirements stipulated in the E-Plan.
6.
Maintenance Logs and Records
a.
Inspection Scope (IP 69001)
To verify compliance with TS Sections 3, 4, and 5, the inspector reviewed selected aspects of:
- Reactor Operations Summary Sheets for 2016 and to date in 2017
Control Element Inspection Log (O.5) for 2016 and to date in 2017
Monthly Core Reactivity Parameters Log (O.7) for 2016 and to date in 2017
Maintenance Log, Volume 1 (O.8), pages 148-158
Preventative Maintenance Checklists (O.2) for 2016 and to date in 2017
RSC meeting minutes 2016 and to date in 2017
Power Calibration Log forms (also in O.2) for 2016 and to date in 2017
Monthly Console and Auxiliary Equipment Checklist Log (O.9) containing documentation of equipment maintenance as indicated on the WSUNSC Form No. 40, entitled Console Auxiliary Equipment Maintenance Checklist, latest form revision June 2016
WSUNSC Reactor Operating Log (O.1) sheets from January 2016 to date in 2017
WSU Annual Report entitled Annual Report on the Operation of the Washington State University Nuclear Radiation Center TRIGA Reactor, for the periods from July 1, 2015, through June 30, 2016, dated August 19, 2016
WSU Annual Report entitled Annual Report on the Operation of the Washington State University Nuclear Radiation Center TRIGA Reactor, for the periods from July 1, 2014, through June 30, 2015, dated August 7, 2015
WSUNSC Administrative Procedure, Section No. 5, entitled Surveillance Documentation Review, (not dated)
WSUNSC Administrative Procedure, Section No. 6, entitled Performance of Maintenance Activities, (not dated)
WSUNSC SOP No. 5, Standard Procedure for Performing Preventive Maintenance, dated May 9, 2017
- 7 -
- WSUNSC SOP No. 11, Standard Procedure for Control Element Maintenance, dated May 9, 2017
WSUNSC SOP No. 20, Standard Procedure for Performing Power Calibrations, dated May 9, 2017
b.
Observations and Findings
The Inspector noted that routine and preventive maintenance was controlled by, and documented in, the maintenance or reactor operations logs and the monthly Console Auxiliary Equipment Maintenance Checklists consistent with the TSs and licensee procedures. Unscheduled maintenance or equipment repair was reviewed to determine if the work required a Title 10 of the Code of Federal Regulations 50.59 evaluation. Verifications and operational systems checks were performed following completion of the maintenance to ensure system operability before the equipment was returned to service.
c.
Conclusion
The maintenance logs, records, performance, and reviews satisfied TSs and procedure requirements.
7.
Fuel Handling
a.
Inspection Scope (IP 69001)
The inspector reviewed selected aspects of the following to ensure that the licensee was complying with TS Sections 4.1.6, 5.2, 6.8, and 6.9:
- Control Element Inspection Log (O.5) for 2016 and 2017
Monthly Core Reactivity Parameters Log (O.7) for 2016 and 2017
Core Change Log (O.6) through July 2017
Fuel handling equipment and instrumentation
Selected WSUNSC Reactor Log sheets from 2016 through the present
WSU special nuclear material Physical Inventory Log sheets dated March 21, 2012, from 2016 through the present
WSUNSC Administrative Procedure, Section No. 9, entitled Special Nuclear Material Accountability Plan, (not dated)
WSUNSC SOP No. 23, Standard Procedure Annual Fuel Inspection, dated May 9, 2017
WSUNSC SOP No. 11, Standard Procedure for Control Element Maintenance, dated May 9, 2017
- 8 -
b.
Observations and Findings
Procedures for refueling, fuel movement, and TSs required surveillances ensured controlled operations for Core 35-A. A detailed plan for performing fuel movement was required to be developed prior to each fuel movement operation.
The inspector noted that the data recorded for fuel movements that had been conducted in the past were acceptable and were required to be cross referenced in the operations logs. Log entries, indicating fuel movements, were completed under the direct supervision of a SRO as required.
Through records review and interviews with licensee personnel, the inspector determined that various fuel movement operations had been conducted since the last inspection in this area. The most significant fuel movement involved removing fuel bundles from the core to allow for fuel inspection in January 2016. The inspector verified that a detailed plan had been completed for the fuel movement activities as required. The plan had been reviewed and approved by the Facility Assistant Director and the Facility Director as required.
c.
Conclusion
The fuel handling activities and documentation were as required by facility TSs and procedures.
8.
Exit Interview
The inspection scope and results were summarized on July 20, 2017, with members of licensee management. The inspector described the areas inspected and discussed in detail the inspection findings. The licensee acknowledged the inspection results presented and did not identify as proprietary any of the material provided to or reviewed by the inspector during the inspection.
PARTIAL LIST OF PERSONS CONTACTED
Licensee Personnel
C. Hines
Assistant Director, Nuclear Science Center T. LaVoie
Senior Reactor Operator D. Wall
Director, Nuclear Science Center H. Bennet
Senior Reactor Operator C. Jackson
Administrative Assistant
INSPECTION PROCEDURES USED
Class II Research and Test Reactors
ITEMS OPENED, CLOSED, AND DISCUSSED
Opened
None
Closed
None
PARTIAL LIST OF ACRONYMS USED
Inspection Procedure LCO Limiting Condition for Operation MW
Megawatt No.
Number NRC
U.S. Nuclear Regulatory Commission RSC
Reactor Safeguards Committee SOP
Standard Operating Procedure SRO
Senior Reactor Operator TS
Technical Specification WSU Washington State University WSUNSC Washington State University Nuclear Science Center