| Quarter | Site | Title |
---|
05000440/FIN-2018010-01 | 2018Q3 | Perry | Failure to Correctly Establish Maintenance/Replacement Frequencyfor the WeedTemperature Transmitters In Zone FB-7 |
05000331/FIN-2018011-01 | 2018Q2 | Duane Arnold | Failure to Translate Environmental Qualification Requirements into Maintenance Procedures/Instructions |
05000275/FIN-2018010-01 | 2018Q2 | Diablo Canyon | Failure to install conduit to environmentally qualified solenoid valves in a manner to prevent moisture intrusion and accumulation within the solenoid enclosure |
05000324/FIN-2018011-03 | 2018Q2 | Brunswick | Potential Unjustified Activation Energy for Rosemont Transmitters |
05000324/FIN-2018011-02 | 2018Q2 | Brunswick | Failure to Evaluate Effects of MOV Space Heaters on Qualified Life |
05000324/FIN-2018011-01 | 2018Q2 | Brunswick | Failure to Justify Qualified Life Extension of ASCO Solenoid Operated Valves |
05000395/FIN-2018010-02 | 2018Q1 | Summer | Failure to Verify the Seismic Qualification of Valcor Solenoid Operated Valve XVX06050A |
05000395/FIN-2018010-01 | 2018Q1 | Summer | Failure to Justify Activation Energy for Valcor SOV XVX06050A |
05000395/FIN-2018010-03 | 2018Q1 | Summer | Inadequate Radiation Harsh Environmental Qualification of Reactor Building Spray Pump A |
05000395/FIN-2018010-05 | 2018Q1 | Summer | Potential High Radiation Dose Areas with Unqualified Components |