DCL-19-046, Withdrawal of Request for Exemption from Operator Written Examination and Operating Test

From kanterella
Jump to navigation Jump to search

Withdrawal of Request for Exemption from Operator Written Examination and Operating Test
ML19148A729
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 05/28/2019
From: Gerfen P
Pacific Gas & Electric Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
DCL-19-046
Download: ML19148A729 (2)


Text

Pacific Gas and Electric Company*

Paula Gerten Oiablo Canyon Power Plant Site Vice President Mail code 104/5/502 P.O. Box 56 Avila Beach, CA 93424 805.545.4596 Internal: 691.4596 Fax: 805.545.4234 May 28, 2019 PG&E Letter DCL-19-046 Ho Nieh, Director 10 CFR 55.11 Office of Nuclear Reactor Regulation 10 CFR 55.31(a)(3)

U.S. Nuclear Regulatory Commission 10 CFR 55.33(a)(2)

Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Withdrawal of Request for Exemption from Operator Written Examination and Operating Test

References:

1. PG&E Letter DCL-19-017, "Request for Exemption from Operator Written Examination and Operating Test," dated March 7, 2019 (ADAMS Accession No. ML19084A285)

Dear Mr. Nieh:

In Reference 1, Pacific Gas and Electric Company (PG&E) requested an exemption from the requirements of 10 CFR 55.33(a)(2) and 55.31 (a)(3) on behalf of a former Diablo Canyon Power Plant senior reactor operator license candidate. The individual had left PG&E after successfully passing the NRC written examination and operating test, and subsequently returned. Upon further consideration and as discussed with the NRC staff, PG&E hereby withdraws the exemption request.

PG&E makes no new or revised regulatory commitments (as defined by NEI 99-04) in this letter.

If the NRC requires additional information regarding this matter, please contact Mr. Adam Peck, Director, Operations Services, at 805-545-6675.

Sincer~

r~(-~_.__

Paula Gerten A member of the STARS Alliance Callaway

  • Diablo Canyon
  • Palo Verde
  • Wolf Creek

Mr. Ho Nieh PG&E Letter DCL-19-046 May 28, 2019 Page 2 jmsp/4927/51029962 cc: Scott A. Morris, NRC Region IV Administrator Christopher W. Newport, NRC Senior Resident Inspector Balwant K. Singal, NRC Senior Project Manager Diablo Distribution A member of the STARS Alliance Callaway

  • Diablo Canyon
  • Palo Verde
  • Wolf Creek