05000361/FIN-2012002-03
From kanterella
Jump to navigation
Jump to search
Finding | |
---|---|
Title | Failure to Control Work Activities and Prevent RCS Perturbations |
Description | The inspectors reviewed a self-revealing non-cited violation of Technical Specification 5.5.1.1 for the failure of operations personnel to follow Procedure SO23-3-1.8, Draining the Reactor Coolant System to a Reduced Inventory Condition, Revision 32, Attachment 13, Reduced Inventory Condition RCS Perturbation Control. Specifically, on February 8, 2012, operations personnel failed to document potential reactor coolant system perturbations and the measures, controls, and enhanced monitoring used to prevent perturbations. Consequently, work activities performed by heath physics personnel were not appropriately documented and controlled which resulted in a reactor coolant system perturbation while in reduced inventory conditions. The issue was entered into licensees corrective action program as Nuclear Notification NN 201848706. The performance deficiency is more than minor, and therefore a finding, because it was associated with the Initiating Events Cornerstone attribute of configuration control and affected the associated cornerstone objective to limit the likelihood of those events that upset plant stability and challenge critical safety functions during shutdown as well as power operations. Additionally, the failure to appropriately control work activities that could impact reactor coolant system inventory while in reduced inventory conditions, if left uncorrected, would have the potential to lead to a more significant safety concern. Using the Manual Chapter 0609, Appendix G, Shutdown Operations Significance Determination Process, Phase 1 guidance, a Phase 2 analysis is required because the finding increased the likelihood of a loss of reactor coolant system inventory during reduced inventory conditions as a result of inadequate controls implemented to avoid operations that could lead to perturbations in reactor coolant system level control. The finding was evaluated using the Phase 2 guidance in IMC 0609, |
Site: | San Onofre |
---|---|
Report | IR 05000361/2012002 Section 1R20 |
Date counted | Mar 31, 2012 (2012Q1) |
Type: | NCV: Green |
cornerstone | Initiating Events |
Identified by: | Self-revealing |
Inspection Procedure: | IP 71111.2 |
Inspectors (proximate) | R Lantz L Carson J Melfi J Reynoso J Laughlin G Warnick I Anchando N Greene D You |
CCA | H.5, Work Management |
INPO aspect | WP.1 |
' | |
Finding - San Onofre - IR 05000361/2012002 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Finding List (San Onofre) @ 2012Q1
Self-Identified List (San Onofre)
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||