05000361/FIN-2011004-02 | 2011Q3 | | Failure to Provide Adequate Flood Protection for the Auxiliary Feedwater Steam Supply Piping |
05000361/FIN-2011403-01 | 2011Q3 | | Security |
05000361/FIN-2011010-06 | 2011Q3 | | Failure to Adequately Control Document Changes |
05000361/FIN-2011010-05 | 2011Q3 | H.6 | Failure to Maintain Equipment Important to Safety |
05000361/FIN-2011010-04 | 2011Q3 | | Failure to Evaluate the Effects of Fuse Resistance and High Energy Line Break Conditions on Control Circuit Voltage. |
05000361/FIN-2011010-03 | 2011Q3 | | Failure to Incorporate Design Requirements into Procedures and Instructions |
05000361/FIN-2011010-02 | 2011Q3 | | Failure to Evaluate that Sufficient Voltage would be Available at the Emergency Diesel Generator Air Start Solenoid |
05000361/FIN-2011010-01 | 2011Q3 | | Inadequate Assessment of Seismic Qualification of Emergency Diesel Generator Buried Fuel Oil Tanks |
05000361/FIN-2011004-04 | 2011Q3 | H.8 | Failure to Perform Plant Modification in Accordance with Applicable Specifications |
05000361/FIN-2011004-03 | 2011Q3 | H.14 | Failure to Incorporate Calculation Results into Plant Procedures |
05000361/FIN-2011004-01 | 2011Q3 | H.7 | Failure to Maintain Emergency Core Cooling System Valves in Required Positions |
05000361/FIN-2011005-03 | 2011Q4 | H.7 | Failure to Correct Degraded Plant Equipment Results in an Ammonia Spill |
05000361/FIN-2011005-02 | 2011Q4 | H.13 | Failure to Implement Required Compensatory Measures Resulted in Inoperable Condensate Storage Tank |
05000361/FIN-2011005-01 | 2011Q4 | H.7 | Failure to Control Work in a High Radiation Area |
05000361/FIN-2012002-01 | 2012Q1 | P.1 | Failure to Maintain Seismic Controls in Safety-Related Areas |
05000361/FIN-2012002-02 | 2012Q1 | | Failure to Implement Timely Corrective Actions on Safety-Related Pumps |
05000361/FIN-2012002-03 | 2012Q1 | H.5 | Failure to Control Work Activities and Prevent RCS Perturbations |
05000361/FIN-2012405-01 | 2012Q1 | H.2 | Security |