05000361/FIN-2010005-01 | 2010Q4 | P.2 | Failure to Appropriately Classify Conditions Adverse to Quality for Significance |
05000361/FIN-2010005-04 | 2010Q4 | H.11 H.12 | Failure to Properly Store C-Panels in the Radwaste Building |
05000361/FIN-2010005-03 | 2010Q4 | H.14 | Inadequate Control of Foreign Material over the Spent Fuel Pool during Surveillance Testing |
05000361/FIN-2010005-02 | 2010Q4 | H.14 | Failure to Follow Procedure for Modifying Work Clearance Applications |
05000361/FIN-2010403-01 | 2010Q4 | | Security |
05000361/FIN-2011404-01 | 2011Q1 | | Security |
05000361/FIN-2010009-01 | 2011Q1 | | Adequacy of Model Inputs Used in Restoration of Nuclear Concrete Containment Structures |
05000361/FIN-2011201-01 | 2011Q1 | | Security |
05000361/FIN-2011002-01 | 2011Q1 | H.4 H.5 | Failure to Follow Station Procedures for Seasonal Readiness |
05000361/FIN-2011002-02 | 2011Q1 | H.14 | Failure to Follow Procedures to Establish Compensatory Measures |
05000361/FIN-2011002-03 | 2011Q1 | | Failure to Comply with Technical Specifications |
05000361/FIN-2011003-05 | 2011Q2 | H.14 | Failure to Follow Procedure Requirements for a Failed Surveillance |
05000361/FIN-2011012-01 | 2011Q2 | | SRO performed licensed activities (core alterations) as Refueling SRO Supervisor while license was INACTIVE |
05000361/FIN-2011003-01 | 2011Q2 | H.14 | Inadequate Compensatory Measures for a Design Nonconformance |
05000361/FIN-2011003-02 | 2011Q2 | H.7 | Inadequate Work Instructions to Ensure Environmentally Qualified Configuration |
05000361/FIN-2011003-03 | 2011Q2 | H.10 | Failure to Appropriately Assess and Manage Risk for Work in Unit 3 Intake |
05000361/FIN-2011003-06 | 2011Q2 | | Lack of Adequate Procedures to Respond to the Inability to Drive Control Rods |
05000361/FIN-2011003-04 | 2011Q2 | | Failure to Provide Adequate Long-Time Over-Current Protection for the Feeder Cables for Charging Pumps 2P190 and 2P191 |
05000361/FIN-2011010-02 | 2011Q3 | | Failure to Evaluate that Sufficient Voltage would be Available at the Emergency Diesel Generator Air Start Solenoid |
05000361/FIN-2011010-03 | 2011Q3 | | Failure to Incorporate Design Requirements into Procedures and Instructions |
05000361/FIN-2011010-04 | 2011Q3 | | Failure to Evaluate the Effects of Fuse Resistance and High Energy Line Break Conditions on Control Circuit Voltage. |
05000361/FIN-2011010-05 | 2011Q3 | H.6 | Failure to Maintain Equipment Important to Safety |
05000361/FIN-2011010-06 | 2011Q3 | | Failure to Adequately Control Document Changes |
05000361/FIN-2011010-01 | 2011Q3 | | Inadequate Assessment of Seismic Qualification of Emergency Diesel Generator Buried Fuel Oil Tanks |
05000361/FIN-2011403-01 | 2011Q3 | | Security |
05000361/FIN-2011004-04 | 2011Q3 | H.8 | Failure to Perform Plant Modification in Accordance with Applicable Specifications |
05000361/FIN-2011004-03 | 2011Q3 | H.14 | Failure to Incorporate Calculation Results into Plant Procedures |
05000361/FIN-2011004-02 | 2011Q3 | | Failure to Provide Adequate Flood Protection for the Auxiliary Feedwater Steam Supply Piping |
05000361/FIN-2011004-01 | 2011Q3 | H.7 | Failure to Maintain Emergency Core Cooling System Valves in Required Positions |