05000247/FIN-2016001-02
From kanterella
Jump to navigation
Jump to search
Finding | |
---|---|
Title | Failure to Adequately Implement Risk Management Actions for the Containment Key Safety Function |
Description | The inspectors identified an NCV of Title 10 of the Code of Federal Regulations (10 CFR) 50.65(a)(4) because Entergy did not effectively manage the risk associated with refueling maintenance activities. Specifically, Entergy did not demonstrate they could implement their planned risk management action to restore the containment key safety function within the time-to-boil using the equipment hatch closure plug. Entergy wrote CRIP2- 2016-01503 and CR-IP2-2016-01883 to address this issue. This performance deficiency is more than minor because it impacted the barrier performance attribute of the Barrier Integrity cornerstone and affected the objective to provide reasonable assurance that containment protects the public from radionuclide releases caused by accidents or events. Specifically, Entergy did not demonstrate that they could install the hatch plug within the time-to-boil and that the plug would seal the equipment hatch opening, which affected the reliability of containment isolation in response to a loss of shutdown cooling or other event inside containment. The inspectors determined the finding could be evaluated using Attachment 0609.04, Initial Characterization of Findings. Because the finding degraded the ability to close or isolate the containment, it required review using IMC 0609, Appendix H, Containment Integrity Significance Determination Process. Since containment status was not intact and the finding occurred when decay heat was relatively high, it required a phase two analysis. Since the leakage from containment to the environment was less than 100 percent containment volume per day, the finding screens as very low safety significance (Green). A subsequent demonstration showed that the hatch plug provided an adequate seal with the containment hatch opening. The inspectors concluded this finding had a cross-cutting aspect in the area of Human Performance, Documentation, because Entergy did not maintain complete, accurate, and up-to-date documentation related to the use of the hatch plug. Specifically, they tested the seal integrity without using a work order (WO), and made pen-and-ink changes to the procedure without processing a procedure change form. |
Site: | Indian Point |
---|---|
Report | IR 05000247/2016001 Section 1R13 |
Date counted | Mar 31, 2016 (2016Q1) |
Type: | NCV: Green |
cornerstone | Barrier Integrity |
Identified by: | NRC identified |
Inspection Procedure: | IP 71111.13 |
Inspectors (proximate) | B Haagensen G Dentel G Newman H Gray J Furia J Patel P Ott S Rich |
Violation of: | 10 CFR 50.65(a)(4) |
CCA | H.7, Documentation |
INPO aspect | WP.3 |
' | |