IR 05000277/2020501 | 17 December 2020 | Emergency Preparedness Biennial Exercise Inspection Report 05000277/2020501 and 05000278/2020501 | Coronavirus COVID-19 |
IR 05000171/2020001 | 10 November 2020 | NRC Inspection Report No. 05000171/2020001, Exelon Generation Company, LLC, Peach Bottom Atomic Power Station, Unit 1 | Process Control Program COVID-19 |
IR 05000277/2020003 | 9 November 2020 | Integrated Inspection Report 05000277/2020003 and 05000278/2020003 | Offsite Dose Calculation Manual Temporary Modification Functionality Assessment Annual Radiological Environmental Operating Report Operability Determination Coronavirus COVID-19 Fire Protection Program Downpower |
IR 05000277/1984001 | 2 November 2020 | Alaska Native Medical Center; Amendment 07; License 50-27784-01; Docket 030-36654; Control 622887 | |
IR 05000277/2020420 | 9 October 2020 | Security Inspection Report 05000277/2020420 and 05000278/2020420 Pb Report | |
IR 05000277/2020012 | 9 September 2020 | Temporary Instruction 2515/193 Inspection Report 05000277/2020012 and 05000278/2020012 | FLEX Coronavirus Hardened vent COVID-19 |
IR 05000277/2020011 | 8 September 2020 | Design Bases Assurance Inspection (Teams) Inspection Report 05000277/2020011 and 05000278/2020011 | Mission time Past operability Probabilistic Risk Assessment Condition Adverse to Quality Missed surveillance Significance Determination Process Surveillance Frequency Control Program Large early release frequency Operability Determination Coronavirus COVID-19 |
IR 05000277/2020005 | 31 August 2020 | Updated Inspection Plan (Inspection Reports 05000277/2020005 and 05000278/2020005) | Operator Manual Action Open Phase Condition Exemption Request Power-Operated Valves Power Operated Valves COVID-19 |
IR 05000482/2020002 | 12 August 2020 | Integrated Inspection Report 05000482/2020002 and Independent Spent Fuel Storage Installation Inspection Report 07200079/2020001 | Safe Shutdown Unanalyzed Condition Non-Destructive Examination Tornado Missile Internal Flooding Enforcement Discretion Probabilistic Risk Assessment Temporary Modification Functionality Assessment Tornado-Generated Missile Tornado Generated Missile Significance Determination Process Operability Determination Maintenance Rule Program Coronavirus COVID-19 Very Low Safety Significance Issue Resolution Liquid penetrant Fire Protection Program |
IR 05000277/2020002 | 10 August 2020 | Integrated Inspection Report 05000277/2020002 and 05000278/2020002 | Enforcement Discretion Temporary Modification Functionality Assessment Condition Adverse to Quality FLEX Significance Determination Process Large early release frequency Operability Determination Coronavirus COVID-19 Fire Protection Program |
IR 05000277/2020301 | 10 July 2020 | Initial Operator Licensing Examination Report 05000277/2020301 and 05000278/2020301 | |
IR 05000277/2020001 | 6 May 2020 | Integrated Inspection Report 05000277/2020001 and 05000278/2020001 | Internal Flooding Functionality Assessment Operability Determination Coronavirus COVID-19 Fire Protection Program Power change |
IR 07200029/2019001 | 14 April 2020 | NRC Inspection Report 07200029/2019001 | |
IR 05000277/2019006 | 3 March 2020 | Annual Assessment Letter for Peach Bottom Atomic Power Station, Units 2 and 3 (Report 05000277/2019006 and 05000278/2019006) | Open Phase Condition |
IR 05000277/2020401 | 20 February 2020 | Security Baseline Inspection Report 05000277/2020401 and 05000278/2020401 | Fitness for Duty |
IR 05000277/2019004 | 12 February 2020 | Integrated Inspection Report 05000277/2019004 and 05000278/2019004 | High Radiation Area Water Inventory Control Enforcement Discretion Nondestructive Examination Temporary Modification Functionality Assessment Significance Determination Process Operability Determination Moisture barrier Fire Protection Program Dissimilar Metal Weld Flow Induced Vibration |
ML20031C928 | 31 January 2020 | Results of Visual Inspections of Unit 3 Replacement Steam Dryer | |
IR 05000277/2019003 | 22 October 2019 | Integrated Inspection Report 05000277/2019003 and 05000278/2019003 | |
IR 05000277/2019402 | 16 September 2019 | Material Control and Accounting Program Inspection Report 05000277/2019402 and 05000278/2019402 (Cover Letter Only) | |
IR 05000277/2019005 | 28 August 2019 | Updated Inspection Plan (Inspection Reports 05000277/2019005 and 05000278/2019005) | Fitness for Duty Enforcement Discretion Open Phase Condition |
IR 05000277/2019010 | 26 August 2019 | Biennial Problem Identification and Resolution Inspection Report 05000277/2019010 and 05000278/2019010 | Enforcement Discretion Foreign Material Exclusion Operability Determination Pressure boundary leak |
IR 05000277/2019411 | 26 August 2019 | Security Biennial Problem Identification and Resolution Inspection Report 05000277/2019411 and 05000278/2019411 (Cover Letter Only) | Affidavit |
IR 05000277/2019002 | 9 August 2019 | Integrated Inspection Report 05000277/2019002 and 05000278/2019002 | Time of Discovery High Radiation Area Enforcement Discretion Temporary Modification Functionality Assessment FLEX Significance Determination Process Annual Radioactive Effluent Release Report Operability Determination Annual Radiological Effluent Release Report Fire Protection Program |
IR 05000277/2019040 | 27 June 2019 | Supplemental Inspection Report 05000277/2019040 and 05000278/2019040 and Assessment Follow-up Letter | Mission time Condition Adverse to Quality Large early release frequency |
IR 05000277/2019403 | 31 May 2019 | Cyber Security Inspection Report 05000277/2019403 and 05000278/2019403 (Cover Letter Only) | Cyber Security Affidavit |
IR 05000171/2019001 | 30 May 2019 | Delta, Pennsylvania, NRC Inspection Report 05000171/2019001 | Annual Radioactive Effluent Release Report Process Control Program |
IR 05000277/2019001 | 9 May 2019 | Integrated Inspection Report 05000277/2019001 and 05000278/2019001 | |
IR 05000277/2019301 | 6 May 2019 | Initial Operator Licensing Examination Report 05000277/2019301 and 05000278/2019301 | |
IR 05000277/2019410 | 15 April 2019 | Security Inspection Report 05000277/2019410 and 05000278/2019410 | Affidavit |
IR 05000277/2019011 | 14 March 2019 | Design Bases Assurance Inspection (Programs) Report 05000277/2019011 and 05000278/2019011 | Operability Determination |
IR 05000277/2018012 | 5 March 2019 | Temporary Instruction 2515/191 Inspection Report 05000277/2018012 and 05000278/2018012 | FLEX Significance Determination Process Spent Fuel Pool Instrumentation Hardened vent |
IR 05000277/2018006 | 4 March 2019 | Annual Assessment Letter for Peach Bottom Atomic Power Station, Units 2 and 3 (Reports 05000277/2018006 and 05000278/2018006) | Fitness for Duty Cyber Security |
IR 05000277/1994001 | 21 February 2019 | Usibelli Coal Mine, Inc., Amendment 07, License 50-27794-01; Docket 030-36755; Control 610950 | |
IR 05000277/2018004 | 13 February 2019 | Integrated Inspection Report 05000277/2018004 and 05000278/2018004 and Exercise of Enforcement Discretion | High Radiation Area Non-Destructive Examination Offsite Dose Calculation Manual Tornado Missile Enforcement Discretion Anchor Darling Functionality Assessment Locked High Radiation Area Tornado-Generated Missile Tornado Generated Missile Significance Determination Process Tornado Missile Protection Operability Determination Subsequent License Renewal Fire Protection Program Dissimilar Metal Weld |
IR 05000277/2018011 | 20 December 2018 | Post-Approval Site Inspection for License Renewal - Phase 4 Inspection Report 05000277/2018011 and 05000278/2018011 | Aging Management License Renewal |
IR 05000277/2018002 | 13 December 2018 | Errata for Peach Bottom Atomic Power Station - Integrated Inspection Report 05000277/2018002 and 05000278/2018002 and Independent Spent Fuel Storage Installation Report 07200029/2018002 | Safe Shutdown Stroke time Enforcement Discretion Functionality Assessment Condition Adverse to Quality Aging Management Significance Determination Process Operability Determination Fire Protection Program Scaffolding Downpower |
IR 05000277/2018013 | 11 December 2018 | EA-18-107, Peach Bottom Atomic Power Station-Final Significance Determination for a White Finding W/Assessment follow-up and Notice of Violation-Inspection Report 05000277/2018013 and 05000278/2018013 | Significance Determination Process Preliminary White Finding |
IR 05000277/2018003 | 13 November 2018 | Integrated Inspection Report 05000277/2018003 and 05000278/218003, Preliminary White Finding, and Exercise of Enforcement Discretion | High winds Mission time Offsite Dose Calculation Manual Internal Flooding Past operability Enforcement Discretion Probabilistic Risk Assessment Functionality Assessment FLEX Significance Determination Process Annual Radiological Environmental Operating Report Large early release frequency Operability Determination Preliminary White Finding Fire Protection Program |
IR 05000277/2018005 | 28 August 2018 | Updated Inspection Plan (Inspection Report 05000277/2018005 and 05000278/2018005) | Fitness for Duty Cyber Security License Renewal |
IR 05000277/2018410 | 28 August 2018 | Security Inspection Report 05000277/2018410 and 05000278/2018410 and Independent Spent Fuel Storage Installation Security Inspection Report 07200029/2018401 (Letter Only) | Affidavit |
ML18225A086 | 13 August 2018 | Integrated Inspection Report 05000277/2018002 and 05000278/2018002 and Independent Spent Fuel Storage Installation Report 07200029/2018002 | Safe Shutdown Stroke time Enforcement Discretion Functionality Assessment Condition Adverse to Quality Aging Management Significance Determination Process Fire Protection Program Scaffolding Power change |
IR 05000171/2018001 | 23 May 2018 | NRC Inspection Report No. 05000171/2018001 | Hydrostatic Annual Radioactive Effluent Release Report Process Control Program Fire Protection Program |
IR 05000277/2018010 | 9 May 2018 | Triennial Fire Protection Inspection Report 05000277/2018010 and 05000278/2018010 | Safe Shutdown Fire Barrier Multiple Spurious Operation Emergency Lighting Incorporated by reference B.5.b Significance Determination Process Fire Protection Program Measurement Uncertainty Recapture |
IR 05000277/2018001 | 2 May 2018 | Integrated Inspection Report 05000277/2018001 and 05000278/2018001 | High Radiation Area Stroke time Internal Flooding Functionality Assessment Condition Adverse to Quality Significance Determination Process Operability Determination Frazil ice Cold shutdown justification Fire Protection Program Power change Measurement Uncertainty Recapture |
IR 05000277/2018501 | 30 April 2018 | Evaluated Emergency Preparedness Exercise Inspection Report 05000277/2018501 and 05000278/2018501 | |
IR 05000277/2017006 | 28 February 2018 | Annual Assessment Letter for Peach Bottom Atomic Power Station Units 2 and 3 -(Report 05000277-2017006 and 05000278-2017006 Report 05000277-2017402 and 05000278-2017402 Report 05000277-2017501 and 05000278-2017501) | Cyber Security License Renewal |
IR 05000277/2017004 | 1 February 2018 | Integrated Inspection Report 05000277/2017004 and 05000278/2017004 and Exercise of Enforcement Discretion | High Radiation Area Non-Destructive Examination Fire Barrier Water Inventory Control Enforcement Discretion Functionality Assessment Locked High Radiation Area Significance Determination Process Operability Determination License Renewal Pressure Boundary Leakage Pressure boundary leak Fire Protection Program Scaffolding Power change Downpower |
IR 05000277/2017003 | 2 November 2017 | Integrated Inspection Report 05000277/2017003 and 05000278/2017003 | Safe Shutdown Fire Barrier Internal Flooding Emergency Lighting Functionality Assessment Significance Determination Process Process Control Program Operability Determination Fire Protection Program Power change Downpower |
IR 05000277/2017403 | 1 September 2017 | Security Inspection Report 05000277/2017403 and 05000278/2017403 (Letter Only) | Affidavit |
IR 05000277/2017005 | 28 August 2017 | Updated Inspection Plan Letter 05000277/2017005 and 05000278/2017005 with Rpt. 22 | |