IR 05000277/2020401

From kanterella
Jump to navigation Jump to search
Security Baseline Inspection Report 05000277/2020401 and 05000278/2020401
ML20055C892
Person / Time
Site: Peach Bottom  
Issue date: 02/20/2020
From: Fred Bower
Plant Support Branch 1
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
Bower F
References
IR 2020401
Download: ML20055C892 (9)


Text

February 20, 2020

SUBJECT:

PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 - SECURITY BASELINE INSPECTION REPORT 05000277/2020401 AND 05000278/2020401

Dear Mr. Hanson:

On February 6, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Peach Bottom Atomic Power Station, Units 2 and 3 and discussed the results of this inspection with Mr. John McGee, Maintenance Director and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, X /RA/

Signed by: Fred L. Bower

Fred L. Bower, III, Chief Plant Support Branch Division of Reactor Safety

Docket Nos. 05000277 and 05000278 License Nos. DPR-44 and DPR-56

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000277 and 05000278

License Numbers:

DPR-44 and DPR-56

Report Numbers:

05000277/2020401 and 05000278/2020401

Enterprise Identifier: I-2020-401-0011

Licensee:

Exelon Generation Company, LLC

Facility:

Peach Bottom Atomic Power Station, Units 2 and 3

Location:

Delta, PA

Inspection Dates:

February 3, 2020 to February 6, 2020

Inspectors:

J. Cherubini, Senior Physical Security Inspector

D. Hostetter, Security Specialist

J. Rey, Physical Security Inspector

Approved By:

Fred L. Bower, III, Chief

Plant Support Branch

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Peach Bottom Atomic Power Station, Units 2 and 3, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at:

http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

SAFEGUARDS

71130.01 - Access Authorization

The inspectors evaluated the access authorization program. The following elements were

===evaluated from this IP:

Access Authorization===

(1)

  • Tier I: All
  • Tier II: 6 Requirements (02.06 a - c, 02.07 a - b, 02.08 b)
  • Tier III: 4 Requirements (02.10 a - c, 02.11 a)

71130.02 - Access Control

The inspectors evaluated the security access control program. The following elements were

===evaluated from this IP:

Access Control===

(1)

  • Tier I: All Requirements
  • Tier II: 8 Requirements (02.06 a - d, 02.07 a, 02.08 a, b, d)
  • Tier III: 1 Requirement (02.09)

71130.08 - Fitness For Duty Program

The inspectors evaluated the fitness for duty program. The following elements were evaluated

===from this IP:

Fitness For Duty Program===

(1)

  • Tier I: All Requirements
  • Tier II: 26 Requirements (02.05 a - l, 02.06 a - g, 02.07, 02.08 a - b, 02.09 a - d)
  • Tier III: 6 Requirements (02.10, 02.11, 02.12 a, 02.13 a - c)

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below:

PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17)

=

(1)1st quarter 2019 through 4th quarter

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On February 6, 2020, the inspectors presented the security baseline inspection results to Mr. John McGee, Maintenance Director and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71130.01

Miscellaneous

NOSA-PEA-18-08

(AR4154442)

Peach Bottom Atomic Power Station

August 20,

2018 -

August 24,

2018

NOV-19-05/QAA-

19-026

NEI Audit of Confidential Services Inc

June 6, 2019

UAA-2019-03

INPO Audit

February 28,

2019

Procedures

SY-AA-103-500

Access Authorization Program

Revision 15

SY-AA-103-506

Utilizing The Personnel Access Data System (PADS)

Revision 16

SY-AA-103-507

Review Criteria for Determining Trustworthiness and

Reliability

Revision 6

SY-AA-103-514

Site Authorization for Unescorted Access

Revision 19

71130.02

Corrective Action

Documents

233827

234498

237658

238363

239000

239145

239218

239647

240024

240778

245853

246882

247179

249756

249759

249856

04324986

256500

263395

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

266185

266782

270155

274182

274920

283409

285255

294749

04302417

04304781

04306889

04307550

04307923

Corrective Action

Documents

Resulting from

Inspection

04315221

04315579

Procedures

SY-AA-101-112

Exelon Security Search Process

Revision 37

SY-AA-101-112-

1003

ION Scanning Explosives Detector Search Process

Revision 3

SY-AA-101-112-

1005

Owner Controlled Area Inspection Processes

Revision 2

SY-AA-101-112-

F-06

PA Entry Vehicle Search

Revision 8

SY-AA-101-112-

F-07

OCA Entry Vehicle Inspection

Revision 3

SY-AA-101-117

Processing and Escorting of Personnel and Vehicles

Revision 31

SY-AA-101-120

Control of Security Access Control Devices

Revision 9

SY-AA-101-130

Security Responsibilities for Station Personnel

Revision 25

SY-PB-101-112-

1001

Search Process

Revision 7

71130.08

Procedures

SY-AA-102

Exelon Generation Fitness for Duty Program

Revision 21

SY-AA-102-202

Testing for Cause

Revision 20

SY-AA-102-203

Treatment Plan and Follow-up Testing

Revision 13

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

SY-AA-102-204

Random Selection and Notification Process

Revision 13

SY-AA-102-205

Fitness for Duty Appeal Review

Revision 10

SY-AA-102-226

Test Results and MRO Response

Revision 11

71151

Procedures

SY-AA-101-155

Security Events and Nuclear Regulatory Commission

Performance Indicators

Revision 9