Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
IR 05000277/2023402 | 11 January 2024 | Security Baseline Inspection Report 05000277/2023402 and 05000278/2023402 and Independent Spent Fuel Storage Installation Security Inspection 07200029/2023401 | |
IR 05000277/2023003 | 30 October 2023 | Integrated Inspection Report 05000277/2023003 and 05000278/2023003 and Exercise of Enforcement Discretion | High winds Packing leak Stroke time Internal Flooding Enforcement Discretion Functionality Assessment Scram Discharge Volume Operability Determination Fire Protection Program Unidentified leakage |
IR 05000277/2024401 | 5 October 2023 | Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000277/2024401 and 05000278/2024401 | Cyber Security |
IR 05000277/2023010 | 15 September 2023 | Biennial Problem Identification and Resolution Inspection Report 05000277/2023010 and 05000278/2023010 and Notice of Violation | Coatings Cyber Security Condition Adverse to Quality Significance Determination Process Operability Determination |
ML23251A202 | 11 September 2023 | Cover Letter W/Report | Safeguards Contingency Plan |
IR 05000277/2023005 | 31 August 2023 | Updated Inspection Plan for Peach Bottom Atomic Power Station, Units 2 and 3 (Report 05000277/2023005 and 05000278/2023005) | Commercial Grade Dedication Cyber Security |
IR 05000277/2023011 | 15 August 2023 | Comprehensive Engineering Team Inspection Report 05000277/2023011 and 05000278/2023011 | Safe Shutdown Internal Flooding FLEX Aging Management Significance Determination Process Large early release frequency Power Uprate |
IR 05000277/2023002 | 8 August 2023 | Integrated Inspection Report 05000277/2023002 and 05000278/2023002 | Half scram Enforcement Discretion Functionality Assessment Operability Determination Fire Protection Program |
IR 05000277/2023040 | 17 July 2023 | 95001 Inspection Supplemental Report 05000277/2023040 and Follow-Up Assessment Letter | Condition Adverse to Quality Preliminary White Finding |
IR 05000277/2023001 | 8 May 2023 | Integrated Inspection Report 05000277/2023001 and 05000278/2023001 | Enforcement Discretion Temporary Modification Functionality Assessment Condition Adverse to Quality FLEX Significance Determination Process Surveillance Frequency Control Program Operability Determination Spent Fuel Pool Instrumentation Hardened vent Fire Protection Program Power change |
IR 05000277/2022004 | 5 April 2023 | Acknowledgement of Dispute of Green Finding - NRC Inspection Report 05000277/2022004 and 05000278/2022004 | |
IR 05000277/2023401 | 27 March 2023 | Security Baseline Inspection Report 05000277/2023401 and 05000278/2023401 | Fitness for Duty |
IR 05000277/2023012 | 10 March 2023 | Title 10 of the Code of Federal Regulations 50.69 Risk-Informed Categorization and Treatment of Structures, Systems, and Components Inspection Report 05000277/2023012 and 05000278/2023012 | Probabilistic Risk Assessment Significance Determination Process |
IR 05000277/2022006 | 1 March 2023 | Annual Assessment Letter for Peach Bottom Atomic Power Station, Units 2 and 3 (Reports 05000277/2022006 and 05000278/2022006) | Fitness for Duty Commercial Grade Dedication Cyber Security Exemption Request Coronavirus |
ML23033A333 | 2 February 2023 | Integrated Inspection Report 05000277/2022004 and 05000278/2022004 | High Radiation Area Ultimate heat sink Internal Flooding Past operability Nondestructive Examination Temporary Modification Functionality Assessment Locked High Radiation Area Significance Determination Process Large early release frequency Moisture barrier Liquid penetrant Fire Protection Program Dissimilar Metal Weld Downpower |
IR 05000171/2022001 | 4 January 2023 | Constellation Energy Generation, LLC, Peach Bottom Atomic Power Station, Unit 1 - NRC Inspection Report 05000171/2022001 | Process Control Program |
IR 05000277/2022090 | 28 November 2022 | Final Significance Determination of a White Finding with Assessment Follow-Up and Notice of Violation, Inspection Report 05000277/2022090 | Preliminary White Finding |
IR 05000277/2022003 | 27 October 2022 | Integrated Inspection Report 05000277/2022003 and 05000278/2022003 and Preliminary White Finding and Apparent Violation | Time of Discovery Packing leak Half scram Mission time Enforcement Discretion Probabilistic Risk Assessment Squib Functionality Assessment FLEX Significance Determination Process Large early release frequency Operability Determination Severe Accident Management Guideline Through-Wall Leak Preliminary White Finding Fire Protection Program |
IR 05000277/2022401 | 27 September 2022 | Material Control and Accounting Program Inspection Report 05000277/2022401 and 05000278/2022401 (Cover Letter Only) | Affidavit |
IR 05000277/2022005 | 31 August 2022 | Updated Inspection Plan for Peach Bottom Atomic Power Station, Units 2 and 3 (Report 05000277/2022005 and 05000278/2022005) | Fitness for Duty Commercial Grade Dedication Cyber Security Exemption Request Coronavirus |