Pages that link to "RIS 2016-01, Guidance for the Use of Accreditation in Lieu of Commercial Grade Surveys for Procurement of Laboratory Calibration and Test Services"
Jump to navigation
Jump to search
The following pages link to RIS 2016-01, Guidance for the Use of Accreditation in Lieu of Commercial Grade Surveys for Procurement of Laboratory Calibration and Test Services:
Displayed 18 items.
- ML15323A346 (redirect page) (← links)
- RIS 2018-05, Supplier Oversight Issues Identified During Recent NRC Vendor Inspections (← links)
- RIS 2016-01, Guidance for the Use of Accreditation in Lieu of Commercial Grade Surveys for Procurement of Laboratory Calibration and Test Services (← links)
- ML22007A055 (← links)
- ML22340A481 (← links)
- ML22347A284 (← links)
- ML20358A080 (← links)
- ML20197A269 (← links)
- RIS 2003-15, NRC Regulatory Issue Summary, Consolidation of Region I & Region II Materials Program. (← links)
- RIS 2016-12, NRC Employee Access to Switchyards at Licensee Facilities (← links)
- RIS 2016-09, Withdrawn - NRC Regulatory Issue Summary 2016-09 Preparation and Scheduling of Operator Licensing Examinations (← links)
- RIS 2016-08, Process for Scheduling and Allocating Resources in Fiscal Year 2019 for the Review of New Licensing Applications for Light-Water Reactors and Non-Light-Water Reactors (← links)
- RIS 2016-04, Clarification of 10 CFR 50.46 Reporting Requirements and Recent Issues Identified with Guidance Not Approved for Use (← links)
- RIS 2016-01 (redirect page) (← links)
- RIS 2001-25, NEI 99-02, Revision 2: Voluntary Submission of Performance Indicator Data (← links)
- RIS 2002-12B, NRC Regulatory Issue Summary 2002-012B - Research and Test Reactors NRC Threat Advisory and Protective Measures System (← links)
- RIS 2002-12I, NRC Regulatory Issue Summary 2002-12I, Rev. 1: Transporation of Spent Nuclear Fuel Greater Than 100 Grams - NRC Threat Advisory and Protection Measures System (← links)
- RIS 2002-12M, NRC Regulatory Issue Summary 2002-12M, Revision 1: "Manufacturing and Distribution Licensees." (← links)
- RIS 2002-14, Supplement 1: Proposed Changes to the Safety System Unavailability Performance Indicators (← links)
- RIS 2002-12B, - Research and Test Reactors NRC Threat Advisory and Protective Measures System (← links)
- RIS 2002-12I, Rev. 1: Transporation of Spent Nuclear Fuel Greater Than 100 Grams - NRC Threat Advisory and Protection Measures System (← links)
- RIS 2005-31, 2005/12/22-Appliicant Prefiled Exhibit AES000056, NRC Regulatory Issue Summary 2005-31, Control of Security-Related Sensitive Unclassified Non-Safeguards Information Handled by Individuals, Firms, & Entities Subject to NRC Regulation of (← links)
- RIS 2003-15, NRC Regulatory Issue Summary, Consolidation of Region I & Region II Materials Program. (← links)
- RIS 1999-04, Sources of Information Previously Published in the AEOD Annual Report (← links)
- RIS 2002-22, Summary of Comments on 2018-01-24 Draft Ris Ks R1 from Ken Scarola Nuclear Automation Engineering (← links)
- RIS 1999-06, Voluntary Submission of Performance Indicator Data (← links)
- RIS 2018-01, Common Violations Cited During First 2 Years of 10 CFR Part 37, Physical Protection of Category 1 and Category 2 Quantities of Radioactive Material, Implementation and Guidance Documents Available to Support. (← links)
- RIS 2017-05, Administration of 10 CFR Part 72 Certificate of Compliance Corrections and Revisions (← links)
- RIS 2017-02, Applicability of Title 10 of the Code of Federal Regulations Part 37 to Non-Manufacturing and Distribution Service Provider Licensees (← links)
- RIS 2005-31, Enclosure - NRC Regulatory Issue Summary 2005-31 (← links)
- RIS 2005-31, Rev. 1, Control of Security-Related Sensitive Unclassified Non-Safeguards Information Handled by Individuals, Firms, and Entities Subject to NRC Regulation of the Use of Source Byproduct, & SNM (← links)
- RIS 2016-12, NRC Employee Access to Switchyards at Licensee Facilities (← links)
- RIS 2016-09, Withdrawn - NRC Regulatory Issue Summary 2016-09 Preparation and Scheduling of Operator Licensing Examinations (← links)
- RIS 2016-08, Process for Scheduling and Allocating Resources in Fiscal Year 2019 for the Review of New Licensing Applications for Light-Water Reactors and Non-Light-Water Reactors (← links)
- RIS 2015-16, Planned Licensing Action Submittals for All Power Reactor Licensees (← links)
- RIS 2016-04, Clarification of 10 CFR 50.46 Reporting Requirements and Recent Issues Identified with Guidance Not Approved for Use (← links)
- RIS 2015-18, Sodium Iodide-131 (I-131) Patient Release Information Collection Request. (← links)
- RIS 2015-11, Protective Action Recommendations for Members of the Public on Bodies of Water (← links)
- RIS 2014-08, Regulatory Requirements for Transfer of Control (Change of Ownership) of Specific Materials Licensees (← links)
- RIS 2016-02, Design Basis Issues Related to Tube-To-TubeSheet Joints in Pressurized-Water Reactor Steam Generators (← links)
- RIS 2016-06, NRC Regulation of Radium-226 Under Military Control and For Coordination on CERCLA Response Actions at Dod Sites With Radioactive Materials. (← links)
- RIS 2016-05, Embedded Digital Devices in Safety-Related Systems (← links)
- RIS 2005-20, Rev. 2, Revision to NRC Inspection Manual Part 9900 Technical Guidance, Operability Determinations & Functionality Assessments for Resolution of Degraded Or Nonconforming Conditions Adverse To Quality or Safety (← links)
- RIS 2015-15, Information Regarding a Specific Exemption in the Requirements for the Physical Protection of Category 1 and Category 2 Quantities of Radioactive Material (← links)
- RIS 2015-10, Applicability of ASME Code Case N-770-1 As Conditioned in 10 CFR 50.55A, Codes and Standards, to Branch Connection Butt Welds (← links)
- RIS 2015-05, Withdrawn NRC Regulatory Issue Summary 2015-05, Preparation and Scheduling of Operator Licensing Examinations (← links)
- RIS 2015-08, Oversight of Counterfeit, Fraudulent, and Suspect Items in the Nuclear Industry (← links)
- RIS 2002-12D, Cover Sheet for Enclosure 4 - NRC Regulatory Issue Summary 2002-12D, Revision 1, Independent Spent Fuel Storage Installations Using Dry Storage NRC Threat Advisory and Protective Measures System (← links)
- RIS 2014-13, Withdrawn NRC Regulatory Issue Summary 2014-13, Planned Licensing Action Submittal for All Power Reactor Licensees (← links)
- RIS 2015-02, Reporting of H-3, C-14, Tc-99, and I-129 on the Uniform Waste Manifest (← links)
- RIS 2015-04, Withdrawal of Administrative Letter 93-01 (← links)
- RIS 2015-03, Identifying and Reporting Security Incidents Under 10 CFR Part 37 (← links)
- RIS 2014-07, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 5 (← links)
- RIS 2014-07, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 4 of 5 (← links)
- RIS 2014-07, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 3 of 5 (← links)
- RIS 2014-07, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 2 of 5 (← links)
- RIS 2014-07, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 1 of 5 (← links)
- RIS 2014-12, Decommissioning Fund Status Report Calculations - Update to Low-Level Waste Burial Charge Information (← links)
- RIS 2015-01, Qualification Requirements for Bolt and Stud Non-Destructive Examinations (TAC Mf4148) (← links)
- RIS 2014-10, Requirements for Exempt Distribution Licensee Annual Transfer Reports (← links)
- RIS 2014-04, National Source Tracking System Long-Term Storage Indicator (← links)
- RIS 2002-12D, Independent Spent Fuel Storage Installations Using Dry Storage NRC Threat Advisory and Protective Measures System (← links)
- RIS 2014-03, Withdrawn - NRC Regulatory Issue Summary 2014-03, Notice of 10 CFR Part 37 Implementation Deadline for NRC Licensees (← links)
- RIS 2014-01, Regulatory Requirements for Withholding of Proprietary Information from Public Disclosure (← links)
- RIS 2002-12, NRC Regulatory Issue Summary 2002-12l Revision 1 Panoramic And Underwater Irradiators (← links)
- RIS 2013-16, Withdrawn - NRC Regulatory Issue Summary 2013-16, Supplement 1, Interactions Between the NRC and NRC Stakeholders During a Lapse of Agency Appropriations (← links)
- RIS 2013-18, Withdrawn NRC Regulatory Issue Summary 2013-18 Licensing Submittal Information and Design Development Activities for Small Modular Reactor Designs (← links)
- RIS 2002-12M, Manufacturing and Distribution Licensees. (← links)
- RIS 2013-14, Reporting Transactions Involving Temporary Jobsites to the National Source Tracking System (← links)
- RIS 2013-09, NRC Endorsement of NEI 09-10, Revision 1a-A, Guidelines For Effective Prevention and Management of System Gas Accumulation (← links)
- RIS 2014-06, Consideration of Current Operating Issues and Licensing Actions in License Renewal (← links)
- RIS 2013-10, Interim Enforcement Policy on Permanent Implant Brachytherapy (Enclosure 3) (← links)
- RIS 2013-12, Notice of Issuance of Enforcement Guidance Memo-Interim Guidance for Dispositioning Violations Involving 10 CFR 35.60 & 10 CFR 35.63 for the Calibration of Instrumentation to Measure the Activity of Rb-82 and the Determ. of Rb-82 Pt Dosa (← links)
- RIS 2012-08, Developing Inservice Testing and Inservice Inspection Programs Under 10 CFR Part 52 (← links)
- RIS 2013-06, Withdrawn NRC Regulatory Issue Summary 2013-06 Preparation and Scheduling of Operator Licensing Examinations (← links)
- RIS 2013-11, Fuel Assembly Resolution of Top Nozzle Stress Corrosion Cracking Handling for Dry Cask Spent Fuel Storage and Transportation (← links)
- RIS 2013-03, Pre-Application Communication and Scheduling for Medical Radioisotope Production Facilities Intending to Produce Molybdenum-99 (← links)
- RIS 2013-08, Withdrawn RIS 2013-08, Process for Scheduling Acceptance Reviews of New Reactor Licensing and Design Certification Applications and Process for Determining Budget Needs for Fiscal Year 2016 (← links)
- RIS 2013-05, NRC Position in the Relationship Between General Design Criteria and Technical Specification Operability (← links)
- RIS 2013-04, Content Specification And Shielding Evaluations For Type B Transportation Packages (← links)
- RIS 2013-07, NRC Staff Position on the Use of American Society of Mechanical Engineers Certification Mark (← links)
- RIS 2011-07, Official Exhibit - NYS000310-00-BD01 - NRC Regulatory Issue Summary 2011-07 License Renewal Submittal Information for Pressurized Water Reactor Internals Aging Management (← links)
- RIS 2012-12, Withdrawn NRC Regulatory Issue Summary 2012-12, Licensing Submittal Information and Design Development Activities for Small Modular Reactor Designs (← links)
- RIS 2013-01, Use of Aftermarket Sealed Sources in Devices Registered Under 10 CFR 32.210 (← links)
- RIS 2005-01, Rev 1, Changes To Notice Of Enforcement Discretion Process And Staff Guidance (← links)
- RIS 2012-06, NRC Regulatory Issue Summary Regarding Equivalent Feed at Licensed Uranium Recovery Facilities (← links)
- RIS 2004-13, Entergy Pre-Filed Evidentiary Hearing Exhibit Ent000290, NRC Regulatory Issue Summary 2004-13 Consideration Of Sheltering In Licensee'S Range Of Protective Action Recommendations (← links)
- RIS 2012-04, Notice of Revision to the Criteria for Identifying Materials Licensees for Discussion at the Agency Action Review Meeting (← links)
- RIS 2011-12, Rev. 1 - Adequacy of Station Electric Distribution System Voltages (Track Changes) (← links)
- RIS 2011-07, New York State (NYS) Pre-Filed Evidentiary Hearing Exhibit Nys000310, NRC Regulatory Issue Summary 2011-07 License Renewal Submittal Information for Pressurized Water Reactor Internals Aging Management (← links)
- RIS 2012-03, Reintegration of Security Into The Reactor Oversight Process Assessment Program (← links)
- RIS 2011-12, Response to Public Comments on Docket Id NRC-2011-0013-NRC Regulatory Issue Summary 2011-12, Revision 1, Adequacy of Station Electric Distribution System Voltages (← links)
- RIS 2011-13, Follow Up to Generic Letter 96-05 for Evaluation of Class D Valves Under Joint Owners Group Motor-Operated Valve Periodic Verification Program (← links)
- RIS 2011-02, Withdrawn NRC Regulatory Issue Summary 2011-02, Revision 1 Licensing Submittal Information and Design Development Activities for Small Modular Reactor Designs (← links)
- RIS 2012-02, Insights Into Recent License Renewal Application Consistency With The Generic Aging Lessons Learned Report (← links)
- RIS 2012-11, NRC Staff Position on Applying Boiling Water Reactor Technical Specification Requirements During Operations With a Potential For Draining the Reactor Vessel (← links)
- RIS 2012-09, Endorsement of Nuclear Energy Institute Guidance Using An Alternative Method to Manage Cumulative Fatigue At Nuclear Power Reactor Sites (← links)
- RIS 2002-12L, Panoramic and Underwater Irradiators. (← links)
- RIS 2002-12I, Transportation of Spent Nuclear Fuel Greater Than 100 Grams (← links)
- RIS 2002-12H, Gaseous Diffusion Plants; NRC Threat Advisory and Protective Measures Systems (← links)
- RIS 2002-12G, Conversion Facility, NRC Threat Advisory and Protective Measures System (← links)
- RIS 2002-12E, Category I Fuel Facilities, NRC Threat Advisory and Protective Measures System. (← links)
- RIS 2002-12C, Decommissioning Power Reactors and Independent Fuel Storage Installations Using Wet Storage (← links)
- RIS 2002-12B, Research and Test Reactors. (← links)
- RIS 2002-12A, Power Reactors, NRC Threat Advisory and Protective Measures System (← links)
- RIS 2005-12, Transportation of Radioactive Material Quantities of Concern NRC Threat Advisory & Protective Measures System. (← links)
- RIS 2011-09, Available Resources Associated With Extended Storage Of Low-Level Radioactive Waste (← links)
- RIS 2011-14, Metal Fatigue Analysis Performed By Computer Software (← links)
- RIS 2011-10, Request For Licensees To Consider The Nrc'S Public Website For Significant Enforcement Actions When Evaluating Individuals For Employment (← links)
- RIS 2011-06, Pre-Application Communication and Voluntary Submittal of Schedule for Future Molybdenum-99 Facility Licensing Actions for NRC Review (← links)
- RIS 2013-17, Resuming Normal Interactions Between the NRC and NRC Stakeholders Following an Agency Shutdown (← links)
- RIS 2013-16, Withdrawn - NRC Regulatory Issue Summary 2013-16, Interactions Between The NRC And NRC Stakeholders During a Lapse Of Agency Appropriations (← links)
- RIS 2005-31, Official Exhibit - Mandatory Hearing - AES000056-MA-BD01 - NRC Regulatory Issue Summary 2005-31, Control of Security-Related Sensitive Unclassified Non-Safeguards Information Handled by Individuals, Firms & Entities Subject to NRC Regula (← links)
- RIS 2005-31, Official Exhibit - Mandatory Hearing - NRC000086-MA-BD01 - NRC Reg Issue Summary 2005-31, Control of Security-Related Sensitive Unclassified Non-Safeguards Info Handled by Individuals, Firms, and Entities Subject to NRC Regulation of the (← links)
- RIS 2005-31, 2005/12/22-Appliicant Prefiled Exhibit Aes000056, NRC Regulatory Issue Summary 2005-31, Control of Security-Related Sensitive Unclassified Non-Safeguards Information Handled by Individuals, Firms, & Entities Subject to NRC Regulation of (← links)
- RIS 2005-31, 2005/12/22-NRC Prefiled Exhibit Nrc000086, NRC Regulatory Issue Summary 2005-31, Control of Security-Related Sensitive Unclassified Non-Safeguards Information Handled by Individuals, Firms, and Entities Subject to NRC Regulation of the U (← links)
- RIS 2011-01, NRC Policy on Release of Iodine-131 Therapy Patients Under 10 CFR 35.75 to Locations Other Than Private Residences. (← links)
- RIS 2011-02, Withdrawn NRC Regulatory Issue Summary 2011-02 Licensing Submittal Information and Design Development Activities for Small Modular Reactor Designs (← links)
- RIS 2010-10, Withdrawn NRC Regulatory Issue Summary 2010-10 Process For Scheduling Acceptance Reviews Of New Reactor Licensing Applications And Process For Determining Budget Needs For Fiscal Year 2013 (← links)
- RIS 2006-13, 2006/07/31-Intervenor-Exhibit 10-Information On The Changes Made To The Reactor Oversight Process To More Fully Address Safety Culture, Regulatory Issue Summary 2006-13, U.S. NRC (← links)
- RIS 2010-07, Regulatory Requirements For Application of Weld Overlays and Other Mitigation Techniques in Piping Systems Approved for Leak-Before-Break (← links)
- RIS 2010-06, Inservice Inspection And Testing Requirements Of Dynamic Restraints (SNUBBERS) (← links)
- RIS 2011-08, Fatigue Management During Hurricane Conditions 10 CFR Part 26, Subpart I. (← links)
- RIS 2010-04, Monitoring the Status of Regulated Activities During a Pandemic (← links)
- RIS 2010-03, Withdrawn NRC Regulatory Issue Summary 2010-03 Licensing Submittal Information for Small and Modular Reactor Designs (← links)
- RIS 2007-16, U.S. Nuclear Regulatory Commission Regulatory Issue Summary of 2007-16. Revision 1: Implementation of the Requirements of 10 CFR 54.37(b) for Holders of Renewed Licenses (← links)
- RIS 2010-02, Enclosulist of Recently Issued Office of Federal and State Materials and Environmental Management Programs Generic Communications (← links)
- RIS 2010-02, The Global Threat Reduction Initiative (GRTI) Federally Funded Voulentary Security Enhancements for High Risk Radiological Material (← links)
- RIS 2010-01, Withdrawn NRC Regulatory Issue Summary 2010-01 - Process for Scheduling Acceptance Reviews of New Reactor Licensing Applications for Fy 2012 (← links)
- RIS 2009-12, U.S. Nuclear Regulatory Commission Regulatory Issue Summary 2009-Uranium Recovery Policy Regarding Pre-Licensing Construction Activities At Proposed, Unlicensed Uranium Recovery Facilities (← links)
- RIS 2010-05, Applicability of 10 CFR Part 21 Requirements to Applicants for Standard Design Certifications (← links)
- RIS 2009-10, Communications Between the NRC and Reactor Licensees During Emergencies and Significant Events (← links)
- RIS 2009-07, Status Update for Implementation of NRC Regulatory Authority for Certain Naturally Occurring and Accelerator-Produced Radioactive Material (← links)
- RIS 2009-02, Rev 1, Use of Containment Atmosphere Gaseous Radioactivity Monitors As Reactor Coolant System Leakage Detection Equipment at Nuclear Power Reactors (← links)
- RIS 2009-08, Process for Test Controls Associated with Performing Initial Validity Tests and Drug Tests Described in 10 CFR Part 26, Subpart F (← links)
- RIS 2009-14, Licensing Approach for In-Situ Recovery Facility Application Scenarios (← links)
- RIS 2007-21, Rev. 1, Adherence to Licensed Power Limits (← links)
- RIS 2009-02, Use of Containment Atmosphere Gaseous Radioactivity Monitors As Reactor Coolant System Leakage Detection Equipment at Nuclear Power Reactors (← links)
- RIS 2009-05, Uranium Recovery Policy Regarding: (1) The Process for Scheduling Licensing Reviews of Application for New Uranium Recovery Facilities and (2) the Restoration of Groundwater at Licensed Uranium In Situ Recovery ... (← links)
- RIS 2008-30, Fatigue Analysis of Nuclear Power Plant Components (← links)
- RIS 2001-07, Rev. 1 10 CFR 50.75 Reporting and Recordkeeping for Decommissioning Planning (← links)
- RIS 2000-08, Voluntary Submission of Performance Indicator Data (← links)
- RIS 2008-28, Endorsement of Nuclear Energy Institute Guidance for Reactor Vessel Head Heavy Load Lifts (← links)
- RIS 2009-09, Withdrawn NRC Regulatory Issue Summary 2009-09: Use of Multiple Dosimetry and Compartment Factors in Determining Effective Dose Equivalent from External Radiation Exposures (← links)
- RIS 2008-24, Security Responsibilities of Service Providers and Client Licensees (← links)
- RIS 2008-32, Interim Low Level Radioactive Waste Storage at Reactor Sites (← links)
- RIS 2008-25, Primary Water Stress Corrosion Cracking of Dissimilar Metal Butt Welds in Pressurized Water Reactor Primary Coolant System Piping Welds (← links)
- RIS 2008-19, Lessons-Learned from Recent 10 CFR Part 70 License-Transfer Application Reviews (← links)
- RIS 2008-20, Redesignation of Safeguards Advisory for Operating Power Reactors (SA-05-02) (← links)
- RIS 2008-22, Notification of Licensees Regarding Aircraft Threats (← links)
- RIS 2008-21, Issuance of LIC-109, Acceptance Review Procedures. (← links)
- RIS 2008-16, Withdrawn NRC Regulatory Issue Summary 2008-16: Preparation and Scheduling of Operator Licensing Examinations (← links)
- RIS 2008-12, Enclosure 4: List of Recently Issued FSME Generic Communications (← links)
- RIS 2008-10, Fatigue Analysis of Nuclear Power Plant Components (← links)
- RIS 2003-08, Summary of Safeguards Information Requirements, Attachment 1 to NRC Regulatory Issue Summary 2003-08: Protection of Safeguards Information from Unauthorized Disclosure (← links)
- RIS 2005-26, Control of Sensitive Unclassified Nonsafeguards Information Related to Nuclear Power Reactors (← links)
- RIS 2003-08, Enclosure 1 - NRC Regulatory Issue Summary 2003-08: Protection of Safeguards Information from Unauthorized Disclosure (← links)
- RIS 2005-02, Draft NRC Regulatory Issue Summary 2005-02, Revision 1: Clarifying the Process for Making Emergency Plan Changes (← links)
- RIS 2008-15, NRC Staff Position on Crediting Mitigating Strategies Implemented in Response to Security Orders in Risk-informed Licensing Actions and in the Significance Determination Process (← links)
- RIS 2008-26, Clarified Requirements of Title 10 of the Code of Federal Regulations (10 CFR) Section 50.54(Y) When Implementing 10 CFR Section 50.54(x) to Depart from a License Condition or Technical Specification (← links)
- RIS 2007-24, NRC Staff Position on Use of the Westinghouse Crossflow Ultrasonic Flow Meter for Power Uprate or Power Recovery. (← links)
- RIS 2008-27, Staff Position on Extension of the Containment Type a Test Interval Beyond 15 Years Under Option B of Appendix J to 10 CFR Part 50 (← links)
- RIS 2008-12, Enclosure 2: List of Low-Level Radioactive Waste Compacts and Unaffiliated States (← links)
- RIS 2008-12, Enclosure 3 - Bibliography (← links)
- RIS 2008-12, Enclosure 1: Information That NRC Staff May Require To Authorize Extended Interim Storage of Low-Level Radioactive Waste (← links)
- RIS 2005-20, Rev. 1: Revision to NRC Inspection Manual Part 9900 Technical Guidance, Operability Determinations & Functionality Assessments for Resolution of Degraded or Nonconforming Conditions Adverse to Quality or Safety. (← links)
- RIS 2008-12, Considerations for Extended Interim Storage of Low-Level Radioactive Waste By Fuel Cycle and Materials Licensees (← links)
- RIS 2008-05, Lessons Learned to Improve Inspections, Tests, Analyses, and Acceptance Criteria Submittal (← links)
- RIS 2008-06, Protection Against the Malevolent Use of Vehicles When Utilizing Landform Obstacles (← links)
- RIS 2007-29, Clarified Guidance for Licensed Operator Watch Standing Proficiency (← links)
- RIS 2008-04, Discontinuation of Two Performance Indicators Associated with the Security Reactor Oversight Process (← links)
- RIS 2007-23, Date for Operation of National Source Tracking System (← links)
- RIS 2006-12, Us Nuclear Regulatory Commission. NRC Regulatory Issue Summary 2006-12; Endorsement of Nuclear Energy Institute Guidance Enhancements to Emergency Preparedness Programs for Hostile Action. (← links)
- RIS 2007-25, Combined License Application Acceptance Review Process (← links)
- RIS 2008-03, Return/Reuse of Water Containing Previously Discharged Radioactive Effluents from Operating Nuclear Power Plants (← links)
- RIS 2007-19, Communicating Clarifications of Staff Positions in Rg 1.205 Concerning Issues Identified During Pilot Application of NFPA Std 805 (← links)
- RIS 2007-17, Withdrawn NRC Regulatory Issue Summary 2007-017: Preparation and Scheduling of Operator Licensing Examinations (← links)
- RIS 2007-15, Unescorted Access to Materials for Non-Manufacturer and Distributor Service Providers (← links)
- RIS 2007-14, Fingerprinting Requirements for Licensees Implementing the Increased Control Order (← links)
- RIS 2007-21, Adherence to Licensed Power Limits (← links)
- RIS 2007-27, Improving Public Understanding of the Risks Associated with Medical Events (← links)
- RIS 2005-25, Y020070010 - RIS 2005-025, Supplement 1, Clarification of Guidelines for Control of Heavy Loads (← links)
- RIS 2006-27, Availability of NRC 313A Series of Forms and Guidance for Their Completion (← links)
- RIS 2007-16, Implementation of the Requirements of 10 CFR 54.37(b) for Holders of Renewed Licenses (← links)
- RIS 2007-08, Updated Licensing Submittal Information to Support the Design-Centered Licensing Review Approach (← links)
- RIS 2007-06, Regulatory Guide 1.200 Implementation (← links)
- RIS 2007-03, Ionizing Radiation Warning Symbol (← links)
- RIS 2007-20, Implementation of Primary-To-Secondary Leakage Performance Criteria (← links)
- RIS 2007-07, Clarification of Increased Controls for Licensees That Possess Collocated Radioactive Material During Transportation Activities (← links)
- RIS 2007-24, NRC Staff Position on Use of the Westinghouse Crossflow Ultrasonic Flow Meter for Power Uprate or Power Recovery (← links)
- RIS 2006-22, Lessons Learned from Recent 10 CFR Part 72 Dry Cask Storage Campaign (← links)
- RIS 2006-25, Requirements For the Distribution and Possession of Tritium Exit Signs and the Requirements in 10 CFR 31.5 Ad 32.51A (← links)
- RIS 2007-01, Clarification Of NRC Guidance For Maintaining a Standard Emergency Action Level (EAL) Scheme (← links)
- RIS 2006-26, SECY-06-0248 Enclosure 2 - Regulatory Issue Summary 2006-26, Training and Experience and Grandfather Provisions for Authorized Medical Physicists Under 10 CFR Part 35 (← links)
- RIS 2006-20, Enclosure 2 - List of Recently Issued Generic Communication (← links)
- RIS 2006-26, Training and Experience and Grandfather Provisions for Authorized Medical Physicists Under 10 CFR 35 (← links)
- RIS 2007-09, Examples of Recurring Requests for Additional Information (RAIs) for 10 CFR Part 71 and 72 Applications (← links)
- RIS 2007-02, Clarification of NRC Guidance for Emergency Notifications During Quickly Changing Events (← links)
- RIS 2006-21, Improving Response Capabilities Through the Use of an Incident Response Electronic Library (← links)
- RIS 2006-18, Wits200500191/Wits200500192/Wits2005193 - NRC Regulatory Issue Summary 2006-18 Requesting Exemption From the Public Dose Limits for Certain Caregivers of Hospital Patients (← links)
- RIS 2006-13, Information on the Changes Made to the Reactor Oversight Process to More Fully Address Safety Culture (← links)
- RIS 2006-15, Withdrawn NRC Regulatory Issue Summary 2006-15 Preparation and Scheduling of Operator Licensing Examinations (← links)
- RIS 2006-23, Post-Tornado Operability of Ventilating and Air-Conditioning (VAC) Systems Housed in Emergency Diesel Generator (EDG) Rooms (← links)
- RIS 2006-10, NRC Regulatory Issue Summary NRC Regulatory Issue Summary 2006-010 - Regulatory Expectations with Appendix R Paragraph Iii.G.2 Operator Manual Actions (← links)
- RIS 2006-12, Endorsing NEI White Paper, Enhancements to Emergency Preparedness Programs for Hostile Action (← links)
- RIS 2006-08, Publicly Available Cover Letters For Security-Related Inspection Reports (← links)
- RIS 2006-14, NRC Regulatory Issue Summary - Enforcement Requirements for Facility Changes Under 10 CFR 70.72 (c) (2) (← links)
- RIS 2006-09, Nrc'S Procedures For Review of Decommissioning Funding Assurance Reports (← links)
- RIS 2006-19, Availability of Guidance on Radioactive Seed Localization. (← links)
- RIS 2006-07, Proposed Changes to the Safety System Unavailability Performance Indicators (← links)
- RIS 2005-31, Control of Security-Related Sensitive Unclassified Non-Safeguards Inform. Handled by Individuals, Firms & Entities Sub. to Reg. of the Use of Source, Byproduct, & Spec. Nu. Mat., & Attachment One (← links)
- RIS 2006-02, Good Practices For Licensee Performance During The Emergency Preparedness Component of Force-On-Force Exercises (← links)
- RIS 2003-08, 2005/04/30-NRC Regulatory Issue Summary 2003-08 Protection of Safeguards Information from Unauthorized Disclosure (← links)
- RIS 2005-24, Control of Radiation Dose to Visitors of Hospital Patients (← links)
- RIS 2005-23, Clarification of the Physical Presence Requirement During Gamma Stereotactic Radiosurgery Treatments (← links)
- RIS 2004-17, NRC Regulatory Issue Summary (RIS) 2004-17, Revision 1, Decay-In-Storage Provisions for the Storage of Radioactive Waste Containing Byproduct Material (← links)
- RIS 2005-21, Clarification of the Reporting Requirements in 10 CFR 20.2201 (← links)
- RIS 2005-18, Guidance for Establishing and Maintaining a Safety Conscious Work Environment (← links)
- RIS 2003-08, Protection of Safeguards Information from Unauthorized Disclosure (← links)
- RIS 2002-15, OMB Control No.: 3150-0002 NRC Regulatory Issue Summary 2002-15 NRC Approval of Commercial Data Encryption Systems for the Electronic Transmission of Safeguards Information (← links)
- RIS 2005-15, Reporting Requirements for Damaged Industrial Radiographic Equipment (← links)
- RIS 2005-19, Withdrawn NRC Regulatory Issue Summary 2005-019: Preparation and Scheduling of Operator Licensing Examinations (← links)
- RIS 2005-10, Appendix F - Regulatory Issue Summary 2005-10, Performance-Based Approach for Associated Equipment in 10 CFR 34.20. (← links)
- RIS 2006-17, NRC Staff Position on the Requirements of 10 CFR 50.36, Technical Specification, with Respect to Limiting Safety System Settings (LSSS) During Periodic Testing and Calibration of Instrument Channels (← links)
- RIS 2005-10, Performance-Based Approach for Associated Equipment in 10 CFR 34.20 (← links)
- RIS 2005-26, Control of Sensitive Unclassified Non-Safeguards Information Related to Nuclear Power Reactors (← links)
- RIS 2005-11, Requirements for Power Reactor Licensees in Possession of Devices Subject to the General License Requirements of 10 CFR 31.5 (← links)
- RIS 2005-06, Reporting Requirements for Gauges Damaged at Temporary Job Sites (← links)
- RIS 2005-03, 10 CFR Part 40 Exemptions for Uranium Contained in Aircraft Counterweights - Storage and Repair (← links)
- RIS 2005-16, Issuance of NRC Management Directive 8.17, Licensee Complaints Against NRC Employees. (← links)
- RIS 2005-05, Regulatory Issues Regarding Criticality Analyses for Spent Fuel Pools and Independent Spent Fuel Storage Installations (← links)
- RIS 2004-03, NRC Regulatory Issues Summary (RIS) 2004-03, Revision 1: Risk-Informed Approach for Post-Fire Safe-Shutdown Circuit Inspection (Formerly RIS 2004-003) (← links)
- RIS 2004-17, Revised Decay-in-Storage Provisions for the Storage of Radioactive Waste Containing Byproduct Material (← links)
- RIS 2005-07, Performance of Manual Actions to Satisfy the Requirements of 10 CFR Part 50 Appendix R Section Iii.G.2 (← links)
- RIS 2004-18, Expiration Date for 10 CFR Part 71 Quality Assurance Program Plan Approvals. (← links)
- RIS 2004-14, Focusing Resources in the Office of Nuclear Reactor Regulation As a Result of Review of Security Plan Changes (← links)
- RIS 2003-18, Use of Nuclear Energy Institute (NEI) 99-01, Methodology for Development of Emergency Action Levels, Revision 4, Dated January 2003 (← links)
- RIS 2004-09, Status on Deferral of Active Regulation of Ground-Water Protection at In Situ Leach Uranium Extraction Facilities (← links)
- RIS 2004-10, Withdrawn NRC Regulatory Issue Summary 2004-010: Preparation and Scheduling of Operator Licensing Examinations (← links)
- RIS 2004-13, Consideration Of Sheltering In Licensee'S Range Of Protective Action Recommendations (← links)
- RIS 2004-11, Support Information Associated with Requests for Withholding Proprietary Information (← links)
- RIS 2004-06, Independent Survey of Power Reactor Licensees (← links)
- RIS 2004-05, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power (← links)
- RIS 2004-04, Use of Code Cases N-588, N-640, and N-641 in Developing Pressure-Temperature Operating Limits (← links)
- RIS 2004-02, Deferral of Active Regulation of Ground-Water Protection At In Situ Leach Uranium Extraction Facilities (← links)
- RIS 2004-01, Withdrawn NRC Regulatory Issue Summary 2004-001: Method For Estimating Effective Dose Equivalent From External Radiation Sources Using Two Dosimeters (← links)
- RIS 2003-17, Complying with 10 CFR 35.59, Recentness of Training, For Board-Certified Individuals Whose Training and Experience Were Completed More than 7 Years Ago (← links)
- RIS 2003-16, Withdrawn NRC Regulatory Issue Summary 2003-016: NRC Threat Advisory and Protective Measures System (← links)
- RIS 2003-18, Use of NEI 99-01, Methodology for Development of Emergency Action Levels, Revision 4, Dated January 2003 (← links)
- RIS 2003-14, Withdrawn NRC RIS-2003-014: Preparation and Scheduling of Operator Licensing Examinations (← links)
- RIS 2003-13, NRC Review of Responses to Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity. (← links)
- RIS 2003-10, Licensed Operator Requalifiction Training: Written Examination Frequency (← links)
- RIS 2002-12L, Panoramic and Underwater Irradiator Licensees NRC Threat Advisory and Protective Measures System (← links)
- RIS 2003-09, Environmental Qualification of Low-Voltage Instrumentation and Control Cables (← links)
- RIS 1999-03, Resolution of Generic Issue 145, Actions to Reduce Common-Cause Failures (← links)
- RIS 1999-02, Relaxation of Technical Specification Requirements for PORC Review of Fire Protection Program Changes (← links)
- RIS 1999-01, Revisions to the Generic Communications Program (← links)
- RIS 2003-04, Withdrawn NRC Regulatory Issue Summary 2003-004 Use of Effective Dose Equivalent in Place of Deep Dose Equivalent in Dose Assessments (← links)
- RIS 2003-02, Withdrawn NRC Regulatory Issue Summary 2003-002: Importance of Giving NRC Advance Notice of Intent to Pursue License Renewal (← links)
- RIS 2002-23, Availability of Licensing Guide for Diagnostic Nuclear Medicine (← links)
- RIS 2002-22, Use of Epri/Nei Joint Task Force Report, Guideline on Licensing Digital Upgrades: EPRI TR-102348, Revision 1, NEI 01-01: a Revision of EPRI TR-102348 to Reflect Changes to the 10 CFR 50.59 Rule (← links)
- RIS 2002-21, National Guard and Other Emergency Responders Located in the Licensee'S Controlled Area (← links)
- RIS 2002-20, Clarification of Requirements Under 10 CFR 35.432, Calibration Measurements of Brachytherapy Sources. (← links)
- RIS 2002-19, New Modalities To Be Regulated Under 10 CFR 35.1000 (← links)
- RIS 2002-12F, Category Iii Fuel Facilities NRC Threat Advisory & Protective Measures System (← links)
- RIS 2002-14, Proposed Changes to the Safety System Unavailability Performance Indicators (← links)
- RIS 2002-16, Current Incident Response Issues (← links)
- RIS 2002-12B, Research and Test Reactors NRC Threat Advisory and Protective Measures System (← links)
- RIS 2002-12A, Power Reactors NRC Threat Advisory and Protective Measures System (← links)
- RIS 2002-10, Revision of the Skin Dose Limit in 10CFR Part 20 (← links)
- RIS 2002-17, Guidance on Performing Military Service Verification (← links)
- RIS 2002-09, Withdrawn NRC Regulatory Issue Summary 2002-009: Preparation and Scheduling of Operator Licensing Examinations (← links)
- RIS 2002-06, Withdrawn NRC Regulatory Issue Summary 2002-06, Evaluating Occupational Dose for Individuals Exposed to NRC-Licensed Material and Medical X-rays. (← links)
- RIS 2001-24, Status of Receipt of NRC Mail Following the Closing of the Brentwood Postal Facility (← links)
- RIS 2002-04, Results of the Pilot Test of the Proposed Changes to The Unplanned Scrams Performance Indicatolr and Thescrams with Loss of Normal Heat Removal Performance Indicator (← links)
- RIS 2001-23, Resetting Fault Exposure Hours for Safety System Unavailability Performance Indicators (← links)
- RIS 2002-01, Changes to NRC Participation in the International Nuclear Event Scale (← links)
- RIS 2001-20, Revisions to Staff Guidance for Implementing NRC Policy on Notices of Enforcement Discretion (← links)
- RIS 2001-21, Withdrawn NRC Regulatory Issue Summary 2001-021: Licensing Action Estimates for Operating Reactors (← links)
- RIS 2001-17, Withdrawn NRC Regulatory Issue Summary 2001-017: Preparation and Scheduling of Operator Licensing Exams (← links)
- RIS 2001-16, Update of Evacuation Time Estimates (← links)
- RIS 2001-14, Update of Evacuation Time Estimates Position on Reportability Requirements for Reactor Core Isolation Cooling System Failure (← links)
- RIS 2001-13, Update of Evacuation Time Estimates 10 CFR Part 40 Exemptions from Uranium Contained in Aircraft Counterweights (← links)
- RIS 2001-15, Update of Evacuation Time Estimates Performance of DC-Powered Motor-Operated Valve Actuators (← links)
- RIS 2001-22, Attributes of a Proposed No Significant Hazards Consideration Determination (← links)
- RIS 2001-11, Voluntary Submission of Performance Indicator Data (← links)
- RIS 2001-12, Nonconservatism in Pressurized Water Reactor Spent Fuel Storage Pool Reactivity Equivalencing Calculations (← links)
- RIS 2001-18, Requirements for Oath or Affirmation (← links)
- RIS 2001-08, Withdrawn NRC Regulatory Issue Summary 2001-008: Operating Reactor Licensing Action Estimates (← links)
- RIS 2001-06, Criterion for Triggering a Review Under 10 CFR 50.80 for Non-Owner Operator Service Companies (← links)
- RIS 2001-07, 10 CFR 50.75(f)(1) Reports on the Status of Decommissioning Funds (Due March 31, 2001) (← links)
- RIS 2001-03, Changes, Tests, and Experiments (← links)
- RIS 2001-04, Issuance of Updated Guidance on the Transfer of Ownership or Control of Licensed Activities (NUREG-1556, Vol. 15) (← links)
- RIS 2001-02, Guidance on Risk-Informed Decisionmaking in License Amendment Reviews (← links)
- RIS 2001-09, Control of Hazard Barriers (← links)
- RIS 2001-05, Guidance On Submitting Documents To The NRC By Electronic Information Exchange Or On Cd Rom (← links)
- RIS 2000-22, Issues Stemming from NRC Staff Review of Recent Difficulties Experienced in Maintaining Steam Generator Tube Integrity (← links)
- RIS 2000-21, Changes to the Unplanned Scram and Unplanned Scram with Loss of Normal Heat Removal Performance Indicators (← links)
- RIS 2000-24, Concerns About Offsite Power Voltage Inadequacies and Grid Reliabiity Challenges From Industry Deregulation (← links)
- RIS 2000-20, Withdrawn NRC Regulatory Issue Summary 2000-020: Importance of Industry Providing NRC Advance Notice of Intent to Pursue License Renewal (← links)
- RIS 2000-25, Potential Deficiency in Qualification of Okonite Single-Conductor Electrical Control Cables (← links)
- RIS 2000-14, Withdrawn NRC Regulatory Issue Summary 2000-014: Preparation and Scheduling of Operator Licensing Examinations (← links)
- RIS 2000-17, Managing Regulatory Commitments Made by Power Reactor Licensees to the NRC Staff (← links)
- RIS 2000-15, Recommendations for Ensuring Continued Safe Plant Operation and Minimizing Requests for Enforcement Discretion During Extreme Weather Conditions (← links)
- RIS 2000-19, Partial Release of Reactor Site for Unrestricted Use Before NRC Aprroval of the License Termination Plan (← links)
- RIS 2000-16, Availability of the Reactor Vessel Integrity Database Version 2.0.1 (← links)
- RIS 2000-18, Guidance on Managing Quality Assurance Records in Electronic Media (← links)
- RIS 2000-10, Errata: Technical Information to Facilitate Pubic Access to the Us Nrc'S Adams System (← links)
- RIS 2001-01, Eligibility of Operator License Applicants (← links)
- RIS 2000-11, NRC Emergency Telecommunications System (← links)
- RIS 2000-12, Resolution of Generic Safety Issue B-55, Improved Reliability of Target Rock Safety Relief Valves (← links)
- RIS 2000-13, Annual Report On the Effectiveness of Training in the Nuclear Industry for Calendar Year 1999 (← links)
- RIS 2000-06, Consolidated Line Item Improvement Process for Adopting Standard Technical Specifications Changes for Power Reactors (← links)
- RIS 2000-05, Resolution of Generic Safety Issue 165, Spring-Actuated Safety and Relief Valve Reliability (← links)
- RIS 2000-04, Withdrawn NRC Regulatory Issue Summary 2000-004: Operating Reactor Licensing Action Estimates (← links)
- RIS 2000-03, Resolution of Safety Issue 158: Performance of Safety Related Power-Operated Valves Under Design Basis Conditions (← links)
- RIS 2000-10, Technical Information to Facilitate Public Access to the U.S. Nuclear Regulatory Commission'S Agencywide Documents Access and Management System ( Adams) Firewall Access (← links)
- RIS 2000-02, Closure of Generic Safety Issue 23, Reactor Coolant Pump Seal Failure (← links)
- RIS 2000-07, Use of Risk Informed Decision Making in License Amendment Reviews (← links)
- RIS 2000-01, Changes Concerning Foreign Ownership, Control, or Domination of Nuclear Reactor Licensees (← links)
- RIS 2007-06, Implementation (← links)
- RIS 1999-06, VOLUNTARY SUBMISSION OF PERFORMANCE INDICATOR DATA (← links)
- RIS 1999-04, SOURCES OF INFORMATION PREVIOUSLY PUBLISHED IN THE AEOD ANNUAL REPORT (← links)
- RIS 2017-08, Process for Scheduling and Allocating Resources for Fiscal Years 2020 Through 2022 for the Review of New Licensing A0plications for Light-Water Reactors and Non-Light Water Reactors (← links)
- RIS 2015-10, Applicability of ASME Code Case N-770-1 as Conditioned in 10 CFR 50.55a, Codes and Standards, to Branch Connection Butt Welds (← links)
- RIS 2017-04, Clarification on the Implementation of Compensatory Measures for Protective Strategy Deficiencies or Degraded or Inoperable Security Systems, Equipment, or Components (← links)
- RIS 2016-06, NRC Regulation of Radium-226 Under Military Control and for Coordination on CERCLA Response Actions at Dod Sites with Radioactive Materials. (← links)
- RIS 2002-12, NRC Regulatory Issue Summary 2002-12l Revision 1 Panoramic and Underwater Irradiators (← links)
- RIS 2013-09, NRC Endorsement of NEI 09-10, Revision 1a-A, Guidelines for Effective Prevention and Management of System Gas Accumulation (← links)
- RIS 2013-04, Content Specification and Shielding Evaluations for Type B Transportation Packages (← links)
- RIS 2004-13, Official Exhibit - ENT000290-00-BD01 - NRC Regulatory Issue Summary 2004-13 Consideration of Sheltering in Licensee'S Range of Protective Action Recommendations (← links)
- RIS 2005-01, Rev 1, Changes to Notice of Enforcement Discretion Process and Staff Guidance (← links)
- RIS 2012-10, NRC Staff Position on Applying Surveillance Requirements (SR) SR 3.0.2 and 3.0.3 to Administrative Controls Program Tests (← links)
- RIS 2012-03, Reintegration of Security Into the Reactor Oversight Process Assessment Program (← links)
- RIS 2012-02, Insights Into Recent License Renewal Application Consistency with the Generic Aging Lessons Learned Report (← links)
- RIS 2012-11, NRC Staff Position on Applying Boiling Water Reactor Technical Specification Requirements During Operations with a Potential for Draining the Reactor Vessel (← links)
- RIS 2012-09, Endorsement of Nuclear Energy Institute Guidance Using an Alternative Method to Manage Cumulative Fatigue at Nuclear Power Reactor Sites (← links)
- RIS 2006-20, Guidance for Receiving Enforcement Discretion When Concentrating Uranium at Community Water Systems (← links)
- RIS 2002-12I, Transportation of Spent Nuclear Fuel Greater than 100 Grams (← links)
- RIS 2011-09, Available Resources Associated with Extended Storage of Low-Level Radioactive Waste (← links)
- RIS 2011-14, Metal Fatigue Analysis Performed by Computer Software (← links)
- RIS 2011-10, Request for Licensees to Consider the Nrc'S Public Website for Significant Enforcement Actions When Evaluating Individuals for Employment (← links)
- RIS 2011-01, NRC Policy on Release of Iodine-131 Therapy Patients Under 10 CFR 35.75 to Locations Other than Private Residences. (← links)
- RIS 2010-10, Withdrawn NRC Regulatory Issue Summary 2010-10 Process for Scheduling Acceptance Reviews of New Reactor Licensing Applications and Process for Determining Budget Needs for Fiscal Year 2013 (← links)
- RIS 2010-07, Regulatory Requirements for Application of Weld Overlays and Other Mitigation Techniques in Piping Systems Approved for Leak-Before-Break (← links)
- RIS 2010-06, Inservice Inspection and Testing Requirements of Dynamic Restraints (Snubbers) (← links)
- RIS 2009-12, U.S. Nuclear Regulatory Commission Regulatory Issue Summary 2009-Uranium Recovery Policy Regarding Pre-Licensing Construction Activities at Proposed, Unlicensed Uranium Recovery Facilities (← links)
- RIS 2009-05, Uranium Recovery Policy Regarding: (1) the Process for Scheduling Licensing Reviews of Application for New Uranium Recovery Facilities and (2) the Restoration of Groundwater at Licensed Uranium in Situ Recovery ... (← links)
- RIS 2006-25, Requirements for the Distribution and Possession of Tritium Exit Signs and the Requirements in 10 CFR 31.5 Ad 32.51a (← links)
- RIS 2007-01, Clarification of NRC Guidance for Maintaining a Standard Emergency Action Level (EAL) Scheme (← links)
- RIS 2007-18, Data for Updating the Interim Inventory of Radioactive Sources (← links)
- RIS 2006-18, WITS200500191/WITS200500192/WITS2005193 - NRC Regulatory Issue Summary 2006-18 Requesting Exemption from the Public Dose Limits for Certain Caregivers of Hospital Patients (← links)
- RIS 2006-23, Post-Tornado Operability of Ventilating and Air-Conditioning (Vac) Systems Housed in Emergency Diesel Generator (EDG) Rooms (← links)
- RIS 2006-10, NRC Regulatory Issue Summary NRC Regulatory Issue Summary 2006-010 - Regulatory Expectations with Appendix R Paragraph III.G.2 Operator Manual Actions (← links)
- RIS 2006-08, Publicly Available Cover Letters for Security-Related Inspection Reports (← links)
- RIS 2006-14, NRC Regulatory Issue Summary - Enforcement Requirements for Facility Changes Under 10 CFR 70.72 (C) (2) (← links)
- RIS 2006-09, Nrc'S Procedures for Review of Decommissioning Funding Assurance Reports (← links)
- RIS 2006-02, Good Practices for Licensee Performance During the Emergency Preparedness Component of Force-On-Force Exercises (← links)
- RIS 2005-07, Performance of Manual Actions to Satisfy the Requirements of 10 CFR Part 50 Appendix R Section III.G.2 (← links)
- RIS 2004-14, Focusing Resources in the Office of Nuclear Reactor Regulation as a Result of Review of Security Plan Changes (← links)
- RIS 2004-09, Status on Deferral of Active Regulation of Ground-Water Protection at in Situ Leach Uranium Extraction Facilities (← links)
- RIS 2004-02, Deferral of Active Regulation of Ground-Water Protection at in Situ Leach Uranium Extraction Facilities (← links)
- RIS 2004-01, Withdrawn NRC Regulatory Issue Summary 2004-001: Method for Estimating Effective Dose Equivalent from External Radiation Sources Using Two Dosimeters (← links)
- RIS 2003-17, Complying with 10 CFR 35.59, Recentness of Training, for Board-Certified Individuals Whose Training and Experience Were Completed More than 7 Years Ago (← links)
- RIS 2002-19, New Modalities to Be Regulated Under 10 CFR 35.1000 (← links)
- RIS 2002-04, Results of the Pilot Test of the Proposed Changes to the Unplanned Scrams Performance Indicatolr and Thescrams with Loss of Normal Heat Removal Performance Indicator (← links)
- RIS 2001-05, Guidance on Submitting Documents to the NRC by Electronic Information Exchange or on Cd Rom (← links)
- RIS 2000-24, Concerns About Offsite Power Voltage Inadequacies and Grid Reliabiity Challenges from Industry Deregulation (← links)
- RIS 2000-13, Annual Report on the Effectiveness of Training in the Nuclear Industry for Calendar Year 1999 (← links)
- RIS 2018-02, Preparation and Scheduling of Operator Licensing Examinations (← links)
- RIS 2017-01, Human Reliability and Human Performance Database (← links)
- RIS 2002-22, Clarification on Endorsement of Nuclear Energy Institute Guidance in Designing Digital Upgrades in I&C Systems (← links)
- RIS 2018-03, National Terrorism Advisory System and Protective Measures for the Physical Protection of Category 1 and Category 2 Quantities of Radioactive Material (← links)
- RIS 2002-22, 03/14/2018--Summary of a Category 3 Public Meeting Held with External Stakeholders to Provide an Opportunity for Discussion on Draft Regulatory Issue Summary 2002-22, Supplement 1, Clarification on Endorsement of Nuclear Energy Institute (← links)
- RIS 2002-22, 2018/05/31 NRR E-mail Capture - [External Sender] 5/23/18 Meeting, NEI Input the Draft RIS 2002-22, Supplement 1 Which Provides Clarification on the Endorsement of NEI Guidance in Designing Digital Upgrades in Instrumentation and Control (← links)
- RIS 2004-07, Release of Final Standard (RS)-002, Processing Applications for Early Site Permits. (← links)
- RIS 2002-12M, for Manufacturing and Distribution Licensees, NRC Threat Advisory and Protective Measures System (← links)
- ML18206A799 (← links)
- ML18170A284 (← links)
- ML18116A551 (← links)
- ML18081B021 (← links)
- ML18053A115 (← links)
- ML18025B318 (← links)
- ML17353A224 (← links)
- ML18235A042 (← links)
- RIS 2004-13, Consideration of Sheltering in Licensee'S Range of Protective Action Recommendations (← links)
- RIS 2006-04, Draft RAI on Meteorology for Full-Scope AST Application (← links)
- ML18262A341 (← links)
- RIS 2018-05, Supplier Oversight Issues Identified During Recent NRC Vendor Inspections (← links)
- ML18296A590 (← links)
- ML18323A539 (← links)
- RIS 2018-06, Clarification of the Requirements for Reactor Vessel Upper Head Bare Metal Visual Examinations (← links)
- RIS 2015-01, Qualification Requirements for Bolt and Stud Non-Destructive Examinations (← links)
- RIS 2002-03, Attachment 4: NRC Regulatory Issue Summary 2002-03 Cross-Reference (← links)
- RIS 2004-16, Draft RAI, Extend the First Period of the Fourth 10-year Inservice Inspection Interval (← links)
- ML19016A345 (← links)
- ML18353A458 (← links)
- ML19029A105 (← links)
- ML19023A066 (← links)
- ML19053A542 (← links)
- RIS 2019-01, Analysis of Public Comments on Draft NRC Regulatory Issue Summary 2019-01, Clarification of Export Reporting Requirements for Nuclear Facilities, Equipment, and Non-Nuclear Materials (← links)
- L-2017-122, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 21 Annual Submittal (← links)
- RIS 2016-01, Guidance for the Use of Accreditation in Lieu of Commercial Grade Surveys for Procurement of Laboratory Calibration and Test Services (← links)
- RIS 2002-12F, Category III Fuel Facilities. (← links)
- ML19079A145 (← links)
- RIS 2019-02, Preparation and Scheduling of Operator Licensing Examinations. (← links)
- RIS 2005-29, Withdrawal of Regulatory Issue Summary 2005-29 and Draft Revision 1, Anticipated Transients That Could Develop Into More Serious Events. (← links)
- RIS 2008-08, Voluntary Submission of Performance Indicator Data (← links)
- RIS 2004-20, Examples of Recurring Requests for Additional Information (Rais) for 10 CFR Part 71 and 72 Applications (← links)
- RIS 2003-01, Examination of Dissimilar Metal Welds, Supplement 10 to Appendix Viii of Section XI of the ASME Code (← links)
- L-2019-134, Units 1 and 2 - Quality Assurance Topical Report, Revision 22, Annual Submittal (← links)
- ML19235A122 (← links)
- RIS 2016-11, September 6, 2019, Summary of Public Meeting Addressing Concerns Re Regulatory Issue Summary (RIS) 2016-11 (← links)
- RIS 2006-13, NRC000046-NRC Regulatory Issue Summary 2006-13, Information on the Changes Made to the Reactor Oversight Process to More Fully Address Safety Culture. (← links)
- RIS 2009-02, Public Meeting Announcement Re Revision to RIS 2009-02 (← links)
- RIS 2008-10, Vermont Yankee July 2008 Evidentiary Hearing - Intervenor Exhibit NEC-JH 23, NRC, NRC Regulatory Issue Summary 2008-10 Fatigue Analysis of Nuclear Power Plan Components (April 11, 2008) (← links)
- RIS 2019-03, Pre-Application Communication and Scheduling for Accident Tolerant Fuel Submittals (← links)
- RIS 2020-01, Preparation and Scheduling of Operator Licensing Examinations (← links)
- L-2018-123, Quality Assurance Program Description for 10 CFR Part 52 Licenses FPL-2 Revision 4 (← links)
- NG-20-0006, Request for Approval of NextEra Energy Duane Arnold, Llc'S Quality Assurance Topical Report (FPL-3) Revision 0 (← links)
- L-2020-086, Quality Assurance Program Description for 10 CFR Part 52 Licenses FPL-2 Revision 7 (← links)
- L-2020-118, Quality Assurance Program Description for 10 CFR Part 52 Licenses FPL-2 Revision 8 (← links)
- RIS 2021-01, Preparation and Scheduling of Operator Licensing Examinations (← links)
- L-2021-115, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 26 Annual Submittal and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 10 (← links)
- L-2021-234, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 27 Update (← links)
- RIS 2022-01, Preparation and Scheduling of Operator Licensing Examinations (← links)
- RIS 2013-01, Kaiser Aluminum Warrick, LLC (← links)
- ML22007A055 (← links)
- L-2022-068, NextEra Energy Duane Arnold Quality Assurance Topical Report (FPL-3) Revision 2 (← links)
- L-2022-082, NextEra Energy Seabrook, LLC, and NextEra Energy Point Beach, LLC, Quality Assurance Topical Report FPL-1, Revision 28 (← links)
- ML22151A068 (← links)
- RIS 2020-11, NRC Emergency Telecommunications System (← links)
- RIS 2022-02, Operational Leakage (← links)
- RIS 2022-03, NRC Plans to Establish Controlled Unclassified Information-Sharing Agreements with Non-Executive Branch Entities (← links)
- ML22340A481 (← links)
- RIS 2023-01, Preparation and Scheduling of Operator Licensing Examinations (← links)
- L-2023-071, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal (← links)
- RIS 2023-02, Scheduling Information for the Licensing of Accident Tolerant, Increased Enrichment, and Higher Burnup Fuels (← links)
- RIS 2009-06, OMB 3150-XXXX, Draft Supporting Statement for NRC Regulatory Issue Summary 2009-06, Revision 1, Importance of Giving the NRC Advance Notice of Intent to Pursue License Renewal (← links)
- ML22132A157 (← links)
- ML22132A156 (← links)
- L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update (← links)
- RIS 2016-01, Nuclear Energy Institute Guidance for the Use of Accreditation in Lieu of Commercial Grade Surveys for Procurement of Laboratory Calibration and Test Services (redirect page) (← links)
- RIS 2005-31, 2005/12/22-Appliicant Prefiled Exhibit Aes000056, NRC Regulatory Issue Summary 2005-31, Control of Security-Related Sensitive Unclassified Non-Safeguards Information Handled by Individuals, Firms, & Entities Subject to NRC Regulation of (← links)
- RIS 2002-22, 2018/05/31 NRR E-mail Capture - [External Sender] 5/23/18 Meeting, NEI Input the Draft RIS 2002-22, Supplement 1 Which Provides Clarification on the Endorsement of NEI Guidance in Designing Digital Upgrades in Instrumentation and Control (← links)
- RIS 2016-02, Design Basis Issues Related to Tube-To-TubeSheet Joints in Pressurized-Water Reactor Steam Generators (← links)
- RIS 2016-06, NRC Regulation of Radium-226 Under Military Control and For Coordination on CERCLA Response Actions at Dod Sites With Radioactive Materials. (← links)
- RIS 2016-05, Embedded Digital Devices in Safety-Related Systems (← links)
- RIS 2016-06, NRC Regulation of Radium-226 Under Military Control and for Coordination on CERCLA Response Actions at Dod Sites with Radioactive Materials. (← links)
- Division of Policy and Rulemaking (← links)
- Division of Construction Inspection and Operational Programs (← links)
- RIS 2016-001 (redirect page) (← links)
- RIS 2016-11, September 6, 2019, Summary of Public Meeting Addressing Concerns Re Regulatory Issue Summary (RIS) 2016-11 (← links)
- RIS 2023-02, Scheduling Information for the Licensing of Accident Tolerant, Increased Enrichment, and Higher Burnup Fuels (← links)
- RIS 2009-06, OMB 3150-XXXX, Draft Supporting Statement for NRC Regulatory Issue Summary 2009-06, Revision 1, Importance of Giving the NRC Advance Notice of Intent to Pursue License Renewal (← links)