ML22132A157
| ML22132A157 | |
| Person / Time | |
|---|---|
| Site: | 07100062 |
| Issue date: | 05/12/2022 |
| From: | Maret Rose Industrial Nuclear Co |
| To: | Francis Peduzzi Document Control Desk, Office of Nuclear Material Safety and Safeguards |
| Shared Package | |
| ML22132A154 | List: |
| References | |
| Download: ML22132A157 (1) | |
Text
I I I I INDUSTRIAL NUCLEAR CO., INC.
Francis Paul Peduzzi, Chief Inspection and Oversight Branch Division of Fuel Management Office of Nuclear Material Safety And Safeguards
SUBJECT:
INC is submitting for your approval QAP rev 14.
May 12, 2022 Inc has revised its QAP to Revision 14. We have incorporated the use of RIS 2016-01/NEI 14-05A, Revision 1 to sec 18.0.5 allowing suppliers of testing or calibration services may be qualified by audit. survey or review of third-party certifications as allowed by RIS 2016-01 and described in NEI 14-05A Revision 1 and listed on the Approved Suppliers List for the related certified scope of work. Per discussion with NRC, this revision is considered a degradation of quality, therefore NRC approval is required.
If you have any questions or concerns please do not hesitate to contact me at the information below.
Please contact Mike Rose at 510.352.6766 if you have any questions.
Sincerely, Mike Rose QAM/ARSO 14320 Wicks Blvd San Leandro, CA 94577 510-352-6767 ph.
510-352-6772 fax Miker@IR1CO.com Copy: Jeremy Tapp, Team Leader
-B 14320 Wicks Blvd., San Leandro, CA 94577 0
3E NOT, LLC 300 Hwy 146N, La Porte, TX 77571 www. ir1 OD.com Tel: (510) 352-6767 Tel: (281) 470-2010 Fax: (510) 352-6772 Fax: (281) 470-2024