Pages that link to "RIS 2004-03, NRC Regulatory Issues Summary (RIS) 2004-03, Revision 1: Risk-Informed Approach for Post-Fire Safe-Shutdown Circuit Inspection (Formerly RIS 2004-003)"
Jump to navigation
Jump to search
The following pages link to RIS 2004-03, NRC Regulatory Issues Summary (RIS) 2004-03, Revision 1: Risk-Informed Approach for Post-Fire Safe-Shutdown Circuit Inspection (Formerly RIS 2004-003):
Displayed 26 items.
- ML042440791 (redirect page) (← links)
- IR 05000416/2008006 (← links)
- ML16137A308 (← links)
- ML15344A346 (← links)
- RIS 2004-03, NRC Regulatory Issues Summary (RIS) 2004-03, Revision 1: Risk-Informed Approach for Post-Fire Safe-Shutdown Circuit Inspection (Formerly RIS 2004-003) (← links)
- ML15212A796 (← links)
- ML15050A193 (← links)
- ML14356A227 (← links)
- ML13296A530 (← links)
- ML13274A596 (← links)
- ML103630612 (← links)
- ML19059A425 (← links)
- ML19058A036 (← links)
- ML19058A035 (← links)
- ML19351D277 (← links)
- RIS 2004-13, Entergy Pre-Filed Evidentiary Hearing Exhibit Ent000290, NRC Regulatory Issue Summary 2004-13 Consideration Of Sheltering In Licensee'S Range Of Protective Action Recommendations (← links)
- RIS 2004-17, NRC Regulatory Issue Summary (RIS) 2004-17, Revision 1, Decay-In-Storage Provisions for the Storage of Radioactive Waste Containing Byproduct Material (← links)
- RIS 2004-03 (redirect page) (← links)
- 05000482/LER-2008-009 (← links)
- 05000458/LER-2006-001 (← links)
- 05000289/LER-2005-002 (← links)
- 05000305/LER-2008-001 (← links)
- 05000341/LER-2005-006 (← links)
- IR 05000237/2011003 (← links)
- IR 05000416/2008006 (← links)
- IR 05000247/2014008 (← links)
- IR 05000373/2011003 (← links)
- IR 05000440/2006006 (← links)
- IR 05000458/2012002 (← links)
- ML070740767 (← links)
- IR 05000458/2007006 (← links)
- IR 05000289/2006006 (← links)
- IR 05000289/2006004 (← links)
- IR 05000382/2012007 (← links)
- IR 05000445/2005008 (← links)
- IR 05000237/2005002 (← links)
- IR 05000348/2005008 (← links)
- IR 05000341/2005019 (← links)
- IR 05000373/2005006 (← links)
- IR 05000387/2005009 (← links)
- IR 05000397/2006008 (← links)
- ML16137A308 (← links)
- ML16126A033 (← links)
- ML16165A460 (← links)
- ML15344A346 (← links)
- Information Notice 2007-07, Potential Failure of All Control Rod Groups to Insert in a Boiling Water Reactor (BWR) Due to a Fire (← links)
- RIS 2004-03, NRC Regulatory Issues Summary (RIS) 2004-03, Revision 1: Risk-Informed Approach for Post-Fire Safe-Shutdown Circuit Inspection (Formerly RIS 2004-003) (← links)
- Regulatory Guide 1.189 (← links)
- ML15212A796 (← links)
- ML15114A327 (← links)
- ML13357A748 (← links)
- ML13296A530 (← links)
- ML13274A596 (← links)
- ML13267A212 (← links)
- ML13182A350 (← links)
- ML12194A638 (← links)
- ML11332A078 (← links)
- ML11332A077 (← links)
- ML11321A172 (← links)
- ML112420033 (← links)
- ML112420028 (← links)
- ML11188A146 (← links)
- ML061280517 (← links)
- NRC-16-0034, Fermi, Unit 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems (← links)
- ML18096A956 (← links)
- ULNRC-05781, Callaway Plant NFPA 805 Transition Report, Attachment F - Fire-Induced Multiple Spurious Operations Resolution (← links)
- ULNRC-05781, Callaway Plant NFPA 805 Transition Report, Attachment a - NEI 04-02 Table B-1 and Attachment B - NEI 04-02 Table B-2 (← links)
- ML103630612 (← links)
- ML103090608 (← links)
- ML103080232 (← links)
- ML102510852 (← links)
- ML101940442 (← links)
- ML101750602 (← links)
- ML092170715 (← links)
- ML091170546 (← links)
- ML091070228 (← links)
- ML091070227 (← links)
- ML091040206 (← links)
- IR 05000305/2008008 (← links)
- ML082100034 (← links)
- ML082041014 (← links)
- ML081650475 (← links)
- ML081560600 (← links)
- ML080940639 (← links)
- ML080940603 (← links)
- ML080280574 (← links)
- ML16221A084 (← links)
- NRC 2013-0028, Point Beach Nuclear Plant, Units 1 and 2: License Amendment Request 271 - Transition to 10 CFR 50.48(c) - NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition. Part 2 (← links)
- ML063260007 (← links)
- ML063100359 (← links)
- ML061100235 (← links)
- ML051710609 (← links)
- ML051710075 (← links)
- ML051650017 (← links)
- ML051110242 (← links)
- ML043480034 (← links)
- ML043310208 (← links)
- ML042740308 (← links)
- ML041170373 (← links)
- ML072740262 (← links)
- ML071790196 (← links)
- ML071650065 (← links)
- ML071630517 (← links)
- ML071630478 (← links)
- ML071500403 (← links)
- ML071420431 (← links)
- ML071210344 (← links)
- ML071160431 (← links)
- ML070780537 (← links)
- ML070080210 (← links)
- ML062090100 (← links)
- ML060750141 (← links)
- ML060720430 (← links)
- ML060380671 (← links)
- ML060250034 (← links)
- L-13-387, Firstenergy Nuclear Operating Company Beaver Valley Power Station Units 1 and 2, NFPA 805 Transition Report. Page 284 Through Page T-42 (← links)
- RNP-RA/15-0021, Supplemental Response to 120-Day Response Submittal to Request for Additional Information Associated with License Amendment Request to Adopt National Fire Protection (NFPA) Standard 805 (← links)
- LIC-11-0099, Table B-2 Nuclear Safety Capability Assessment Methodology Review (← links)
- NRC 2017-0014, Transmittal of Fire Protection Program Design Document, Revision 1 (← links)
- L-2012-092, License Amendment Request No. 216, Transition to 10 CFR 50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition). Part 1 of 4 (← links)
- HNP-09-084, Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-based Standard for Fire Protection for Light Water Generating Plants. (← links)
- ML19059A425 (← links)
- ML19058A036 (← links)
- ML19058A035 (← links)
- L-2013-099, Transition to 10 CFR 50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition) (← links)
- NG-11-0267, Transition to 10 CFR 50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition) (TSCR-128) (← links)
- ML19095B760 (← links)
- BSEP 12-0106, License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition) (← links)
- NRC 2013-0028, License Amendment Request 271 - Transition to 10 CFR 50.48(c) - NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition. Part 1 of 3 (← links)
- W3F1-2013-0048, Supplement to NFPA 805 License Amendment Request (LAR) (← links)
- ML19235A127 (← links)
- SECY-06-0196, G20060987 - Marvin S. Fertel Ltr. NRC-SECY-06-0196 - Issuance of Generic Letter 2006-XX, Post-Fire Safe Shutdown Circuit Analysis, September 11, 2006 (← links)
- NRC 2018-0024, Transmittal of Fire Protection Program Design Document, Revision 2 (← links)
- NUREG-2128 (← links)
- IR 05000285/2005008 (← links)
- ML052910482 (← links)
- ML052660339 (← links)
- ML052130486 (← links)
- ML19351D277 (← links)
- ML19351D276 (← links)
- ML050250157 (← links)
- NL-04-2326, Response to Request for Additional Information Related to Request to Revise Service Water Intake Structure Exemption from Fire Protection Requirements at the Plant (← links)
- ML043640269 (← links)
- LIC-04-0109, Status of Actions Regarding NRC IR 05000285-00-001 for the Fort Calhoun Station (← links)
- ML042460220 (← links)
- ML042450021 (← links)
- MNS-14-095, Response to August 28, 2014, NRC Request for Additional Information Regarding License Amendment Request to Implement a Risk-Informed Performance-Based Fire Protection Program (← links)
- ML21055A072 (← links)
- ML22325A134 (← links)
- RIS 2004-003 (redirect page) (← links)
- RIS 2004-17, Revised Decay-in-Storage Provisions for the Storage of Radioactive Waste Containing Byproduct Material (← links)
- RIS 2004-18, Expiration Date for 10 CFR Part 71 Quality Assurance Program Plan Approvals. (← links)
- RIS 2004-14, Focusing Resources in the Office of Nuclear Reactor Regulation As a Result of Review of Security Plan Changes (← links)
- RIS 2004-09, Status on Deferral of Active Regulation of Ground-Water Protection at In Situ Leach Uranium Extraction Facilities (← links)
- RIS 2004-10, Withdrawn NRC Regulatory Issue Summary 2004-010: Preparation and Scheduling of Operator Licensing Examinations (← links)
- RIS 2004-13, Consideration Of Sheltering In Licensee'S Range Of Protective Action Recommendations (← links)
- RIS 2004-11, Support Information Associated with Requests for Withholding Proprietary Information (← links)
- RIS 2004-06, Independent Survey of Power Reactor Licensees (← links)
- RIS 2004-05, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power (← links)
- RIS 2004-04, Use of Code Cases N-588, N-640, and N-641 in Developing Pressure-Temperature Operating Limits (← links)
- RIS 2004-02, Deferral of Active Regulation of Ground-Water Protection At In Situ Leach Uranium Extraction Facilities (← links)
- RIS 2004-01, Withdrawn NRC Regulatory Issue Summary 2004-001: Method For Estimating Effective Dose Equivalent From External Radiation Sources Using Two Dosimeters (← links)
- RIS 2004-13, Official Exhibit - ENT000290-00-BD01 - NRC Regulatory Issue Summary 2004-13 Consideration of Sheltering in Licensee'S Range of Protective Action Recommendations (← links)
- RIS 2004-14, Focusing Resources in the Office of Nuclear Reactor Regulation as a Result of Review of Security Plan Changes (← links)
- RIS 2004-09, Status on Deferral of Active Regulation of Ground-Water Protection at in Situ Leach Uranium Extraction Facilities (← links)
- RIS 2004-02, Deferral of Active Regulation of Ground-Water Protection at in Situ Leach Uranium Extraction Facilities (← links)
- RIS 2004-01, Withdrawn NRC Regulatory Issue Summary 2004-001: Method for Estimating Effective Dose Equivalent from External Radiation Sources Using Two Dosimeters (← links)
- RIS 2004-07, Release of Final Standard (RS)-002, Processing Applications for Early Site Permits. (← links)
- RIS 2004-13, Consideration of Sheltering in Licensee'S Range of Protective Action Recommendations (← links)
- RIS 2004-16, Draft RAI, Extend the First Period of the Fourth 10-year Inservice Inspection Interval (← links)
- RIS 2004-20, Examples of Recurring Requests for Additional Information (Rais) for 10 CFR Part 71 and 72 Applications (← links)