- IR 05000335/1985017 (← links)
- IR 05000335/1985024 (← links)
- PNO-II-85-112, on 851123,Limitorque Valve Motors Inside & Outside Containment Bldg Inspected After Util Determined That Some Motors May Not Be Environmentally Qualified.Unit Will Be Restarted.Insp of Unit 3 Motors Planned (← links)
- PNO-II-85-110 (redirect page) (← links)
- PNO-II-85-110, A:on 851122,Hurricane Kate Downgraded to Tropical Storm.No Adverse Effects Occurred to Licensed Facilities in Storm Path (redirect page) (← links)
- PNO-II-85-114, on 851203,during Operation at 93% Power, Power Loss to Two of Four Reactor Coolant Pumps Occurred Causing Reactor Trip.Caused by Short Circuited Lead from Potential Transformer.Main Feedwater Pumps Secured (← links)
- IR 05000335/1996022 (← links)
- PNO-II-85-087, on 850818 & 21,1-1/2 Inch Steam Chest Drain Line Ruptured During Startup Operations After Refueling & Maint Outage.On 850905,main High Pressure Turbine Developed Steam Leak in Steam Chest (← links)
- IR 05000335/1985035 (← links)
- PNO-II-86-003, on 860107,unscheduled Shutdown Lasted Longer than 48 H Due to Damaged Steam Supply Stop Check Valve in Each Auxiliary Feedwater Sys Train.Remaining Valves Being Inspected (← links)
- PNO-II-86-004, on 851203,util Discovered That Individual Cleaning Sludge Out of Steam Generator Received Higher than Expected Exposure in Late Nov/Early Dec.Caused by Lack of whole-body TLD Other than TLD on Upper Arm (← links)
- PNO-II-85-088, on 850910,reactor Manually Tripped from 100% Power.Caused by Excessive Vibration in Reactor Coolant Pump & Loose Parts Monitor Alarm in Same Cooling Loop.Unit in Cold Shutdown for Investigation of Problem & Repairs (← links)
- IR 05000335/1985020 (← links)
- ML20135E924 (← links)
- PNO-II-86-001, on 860101,reactor Tripped from High Flux to Flow Resulting in Actuation of Emergency Feedwater Initiation.Caused by Sheared Shaft on One of Four Reactor Coolant Pumps.Feedwater Flow Secured (← links)
- ML20140B631 (← links)
- IR 05000335/1991004 (← links)
- ML20134N090 (← links)
- PNO-II-85-082, Westinghouse Turbine Reults Indicate Resonance Vibration in High Pressure End of Turbine.Caused by Mod to Governor Valves.Governor Valves Will Be Replaced (← links)
- PNO-II-85-085, on 850824,leaking Oil from Reactor Coolant Pump Lower Motor Reservoir Contacted Pump Casing & Caught Fire.Caused by Failure of Lower Bearing & Oil Seal.Pump & Motor Vendors Contacted for Technical Assistance (← links)
- ML20134J239 (← links)
- PNO-II-97-007, on 970130,kV step-up Transformer Caught Fire & Exploded at Crystal River.Explosion Lifted Transformer Off of Base & Toppled on Side.Offsite Help Requested & Received by Derosa Volunteer Fire Dept (← links)
- ML20134A975 (← links)
- PNO-II-85-097, on 851021,notification Received That Reactor Will Be Shut Down for Approx 8-10 Days to Repair Boot Seal Between Condenser & Low Pressure Turbine.Region II Will Conduct Routine Followup (← links)
- ML20133N912 (← links)
- ML20133N898 (← links)
- PNO-II-85-076, on 850808,reactor Tripped from 99% Power. Caused by Two Blown Fuses.Unit Proceeding to Cold Shutdown & Will Be Out of Svc for 10 Days While Cause Investigated & Reactor Coolant Pumps Inspected (← links)
- IR 05000335/1985021 (← links)
- IR 05000611/2007008 (← links)
- IR 05000335/1985023 (← links)
- IR 05000335/1985014 (← links)
- IR 05000335/1985011 (← links)
- IR 05000335/1985012 (← links)
- IR 05000335/1985010 (← links)
- ML20127K992 (← links)
- IR 05000335/1985001 (← links)
- IR 05000335/1992023 (← links)
- PNO-II-80-036, on 800306,NRC Immediate Action Ltr to Util Confirmed That Facility Will Not Return to Power W/O Prior NRC Concurrence Based on Licensee Responses to NRC Verbal Requests & Technical Discussions Re Corrective Actions (← links)
- PNO-II-80-035, on 800229,group of Antinuclear Demonstrators Assembled for 2-h at Util Winter Park District Ofc.No Demonstration Expected at Plant.Extra Security Guard Will Be Posted at Entrance to Site Access Road for Weekend (← links)
- PNO-II-80-037, investigation of 800226 Transient Revealed Power Failure Caused by Mismated Set of Connector Pins on Printed Circuit Board Between Electrical Cabinet & Solid State Subsys in Control & Indicator Circuits (← links)
- ML20151Y684 (← links)
- ML20151X532 (← links)
- PNO-II-88-027, on 880415,ENERCON Svc,Inc Completed Independent Mgt Appraisal of Plant Nuclear Operations Per NRC Order EA 87-85.Licensee Issued News W/Appraisal on 880418 & Currently Reviewing Appraisal.State of Fl Informed (← links)
- ML20151U677 (← links)
- ML20151U665 (← links)
- ML20151U484 (← links)
- ML20151U452 (← links)
- PNO-V-88-044, on 880627,earthquake Occurred 5 Miles East of Santa Cruz,Ca.Seismic Instrumentation Not Triggered at Vallecitos,Aerotest Operations or at Univ of California at Berkeley (← links)
- PNO-II-88-005, on 880113,manual Reactor Trip Initiated Per off-normal Procedure.Caused by Loss of Power to Movable Gripper Coils.Unit Will Remain Down for Approx 10 Days Due to Pinhole Leak in Canopy Seal for Rod D-8 (← links)
- IR 05000335/1994002 (← links)