Pages that link to "PNO-I-85-053, on 850726,scram Signal Generated Due to Low Reactor Water Level.Normal Suction Valve from Suppression Pool for Loop a Opened Before Alternate Suction for Shutdown Cooling Valve Closed.Approx 3,000 Gallons Drained"
Jump to navigation
Jump to search
The following pages link to PNO-I-85-053, on 850726,scram Signal Generated Due to Low Reactor Water Level.Normal Suction Valve from Suppression Pool for Loop a Opened Before Alternate Suction for Shutdown Cooling Valve Closed.Approx 3,000 Gallons Drained:
Displayed 28 items.
- PNO-I-85-072, advising That Current Util Contract W/Yoh Security Guards Expires on 851001.Contingency Security Guard Force Assembled.Strike Not Expected to Affect Plant Operations (← links)
- PNO-I-85-059, on 850815,unplanned 2% Power Excursion Occurred for 3-5 While Increasing Power to Permit Operational Testing of HPCI Sys.Power Ascension Program Testing Suspended Until Problem Resolved (← links)
- PNO-I-85-070, on 850925,RHR Loop B & HPCI Inoperable.Caused by Sheared Motor Mounting Bolts on Motor Operator.Piping Sys Integrity Unaffected (← links)
- PNO-I-85-045, anti-Shoreham Demonstrations Planned at Site During Wk of 850705.Demonstrators Plan Civil Disobedience of Nonviolent Nature at Gate.Task Force Established to Plan for Event (← links)
- ML20126M500 (redirect page) (← links)
- PNO-I-85-053 (redirect page) (← links)
- ML20126L510 (← links)
- PNO-I-79-039, on 791218,two Former Employees of Const Contractors Made Statements That Welding & Concrete Work Improperly Performed.Region 1 Conducting Investigation of Allegations (← links)
- PNO-I-88-056, on 880526,util & State of Ny Reached Agreement in Principle for Settlement of Plant Controversy.Terms Will Call for Transferring Plant to Long Island Power Authority or Other State Agency & Providing Energy for Area People (← links)
- ML20153B935 (← links)
- PNO-I-88-063, on 880615,public Meeting W/Fema,Region I & Util Held in Patchogue,Ny to Discuss 880607-09 Emergency Preparedness Exercise.Discussion Included Status of Review of Emergency Plan & Preliminary Assessment of Exercise (← links)
- PNO-I-89-053, on 890628,about 95% of Lilco Shareholders Voted to Approve Settlement Agreement Which Will Transfer Shoreham to Long Island Power Authority for Decommissioning (← links)
- ML20198B384 (← links)
- ML20206A602 (← links)
- PNO-I-86-067, on 860826,plant Supplied Nuclear Generated Electricity to Util Electrical Sys as Part of Ongoing Test Program.Turbine Generator Output Breakers Closed Onto Sys Grid for Approx 24 H (← links)
- ML20249A850 (← links)
- ML20249A801 (← links)
- ML20249A630 (← links)
- PNO-I-89-058, on 890713,licensee Commenced Defueling of Facility.Defueling Scheduled to Be Completed in Approx 3 Wks.Following Completion of Core Offload,Reactor Vessel Will Be Reassembled & Normal Water Level Restored (← links)
- ML20236V371 (← links)
- ML20236P108 (← links)
- ML20236J762 (← links)
- ML20236F095 (← links)
- PNO-I-89-015, State of Ny & Util Announced New Tentative Agreement to Close Plant.Agreement Allows Util to Contine Plant Licensing Efforts.Approval from Public Svc Commission Must Be Obtained Before Final Settlement Agreement (← links)
- ML20235F847 (← links)
- ML20209G350 (← links)
- PNO-I-85-047A, on 850707,initiation of Startup Delayed for 36 H Due to Problems Encountered W/Installation of Structural Support on Two Suppression Pool Temp Instruments. Steam Lines Drained (← links)
- PNO-I-93-054, on 930925,initial Shipment of Shoreham Slightly Irradiated Fuel to Limerick Nuclear Generating Station Begun.Shipment Found to Be in Compliance W/Applicable NRC & DOT Regulations (← links)