- ML20082H714 (redirect page) (← links)
- ML20100C893 (← links)
- ML20099F514 (← links)
- ML20099E644 (← links)
- ML20099E395 (← links)
- ML20099B932 (← links)
- ML20116B586 (← links)
- ML20113C923 (← links)
- ML20138A991 (← links)
- ML20138A829 (← links)
- ML20138A801 (← links)
- ML20138A789 (← links)
- ML20129B718 (← links)
- ML20127J954 (← links)
- ML20198B656 (← links)
- ML20209G617 (← links)
- PLA-2308, Special Rept:On 840614 & 23,RCIC Sys Initiated Per Tests 14.4 & 14.2.On 840623 & 24,addl Tests Initiated.Caused by Concern About Electrical Overspeed Trip Circuitry (← links)
- PLA-2281, Special Rept:On 840528,during Startup Test 14.2, Reactor Vessel Injections, Two RCIC Sys Actuations Resulted in Injection of Water Into Rcs.Current Usage for Affected Nozzles Less than 0.70 (← links)
- PLA-2328, Special Rept:On 840705 & 08,during Initiation Startup Test, RCS Received Six Injections of Water.Caused by RCIC Sys Actuations (← links)
- PLA-2318, Special Rept:On 840703,lightning Struck & Automatically Deenergized Transmission Line to Startup Transformer, Resulting in Reactor Scram on Low Vessel Level (← links)
- PLA-2229, Ro:On 840528,turbine Bypass Valve Malfunctioned,Causing Reactor to Exceed Max Allowable Power of 5% by 0.9%.Caused by Debris Found in Turbine Bypass Valve.Control Rods Inserted (← links)
- PLA-2218, Ro:On 840323,results of Filtration Sys Test,Following Painting in Reactor Bldg,Revealed Charcoal in Equipment Compartment Exhaust Charcoal Absorbers 2F257A & B Required Replacement.Work Authorization Issued (← links)
- PLA-2132, Special Rept:Fire Barrier Damper Inoperable Longer than Tech Spec Limits.Caused by Damper Being Physically Blocked Open. Mod Performed to Install Access Hatch in Ductwork.Damper Reset (← links)
- PLA-1502, Ro:On 821221,unauthorized Release of Liquid Radwaste Discharged.Caused by Inadvertent Aligning of C & D Sample Tanks to Discharge Line Instead of Laundry Drain Sample Tanks.Release Status Board Installed (← links)
- PLA-1492, Ro:On 821211,channels to Loose Parts Monitoring Sys Determined Inoperable Due to Erroneous Data.Caused by Incorrect Low Level Alarm Settings.Alarm Levels Reset (← links)
- PLA-1995, Ro:On 831121,determined That No Surveillances Were on Record for Ionization Smoke Detectors in Pgcc Modules in Fire Zones 0-24D & 0-27E.Work Authorization Issued to Test Detectors.Detectors Acceptable (← links)
- PLA-1955 (redirect page) (← links)
- PLA-1926, Ro:On 830916 & 18,smoke Detector Zone Declared Inoperable When Alarming Smoke Detector Could Not Be Reset.Fire Watch Established & Will Be Maintained Until Detection Zone Repaired During Plant Shutdown Due to ALARA Concerns (← links)
- PLA-2110, Ro:Carbon Dioxide Fire Suppression Sys Declared Inoperable, Due to Design Deficiency.Fire Watch Posted & Mod Initiated to Remove Enough Penetration Seals to Permit Proper Carbon Dioxide Discharge (← links)
- PLA-2048, Ro:On 841102,reactor Scram Occurred.Caused by Main Steam Line High Radiation Signal.Response to Transient Included Automatic HPCI Initiation & Injection (← links)
- PLA-2053, Ro:On 831214,seal Penetration X21-6-D20 Violated to Implement Cable Pulling for Mod.Fire Watch Established Per Tech Spec 3.7.7.a & Maintained Until Seal Replaced & Declared Operable on 831221 (← links)
- PLA-2023, Ro:Confirms 831230 Verbal Rept Re Incomplete Safety Parameter Display Sys for Emergency Response Ctr,In Violation of License Condition 2.C(28)(g)(1).Followup Rept Will Be Submitted within 14 Days (← links)
- PLA-1835, Ro:On 830614 & 0705,reactor Scram Occurred Due to Main Steam Line High Radiation,Causing Two ECCS Actuations, Resulting in Injections of Water Into Rcs.Unit Protective Functions Actuated in Conservative Manner (← links)
- PLA-1747, Ro:On 830628,review Revealed Reactor Bldg Station Particulate Iodine & Noble Gas Monitor Out Svc for More than 72 H During 820917-21 & 1201-14.Caused by Need to Work on Sample Probe & to Replace Pump (← links)
- PLA-1735, RO Re Failure of Startup Transformer T10.Cause Under Investigation.Transformer Will Be Disassembled for Repair at Which Time Evaluation of Failure Will Be Conducted. Transformer W/Automatic Tap Changer Will Be Installed (← links)
- PLA-1644, Corrected RO on 821221,actual Total Activity Released Was 14 Uci at Concentration of 1.37E-5 Uci/Ml Instead of 4.82 Uci at Concentration of 4.7E-6 Uci/Ml.Release Figures Well Below Required Reporting Limits (← links)
- PLA-1649, Ro:On 830212,ECCS Actuated,Resulting in Reactor Scram on Main Turbine Control Valve Fast Closure.Event Occurred Again on 830322 When Reactor Scrammed Due to Main Steam Line High Radiation.Planned HPCI Injections Initiated 821229-830404 (← links)
- PLA-1577, Ro:Recent Operations at Power Levels in Excess of Approx 65% Rated Power Accompanied by Indications of Nonmigrating Loose Part in or Near Reactor Vessel.Detectors Installed in Surrounding Area.Evaluation Continuing (← links)
- PLA-1207, RO 50-387/82-01:on 820718,discovered Unacceptable Linear Indication in A-11 Weld on Reactor Recirculation Sys Riser. Indications Detected by Radiography (← links)