Pages that link to "ML20249B498"
Jump to navigation
Jump to search
The following pages link to ML20249B498:
Displayed 24 items.
- PNO-III-97-038, on 970423,Com Ed Announced Delay in Planned Startup of Lasalle Nuclear Power Station Until Spring 1998. Schedule Change Will Result in Initial Laying Off of Contract Workers Out of Contract Work Force at Site (← links)
- PNO-III-97-030, on 970327,five of Six Simulator Crews Rated Unsatisfactory by Licensee & of 31 Operators Six passed,18 Failed as Individuals & Seven Failed Because of Crew. Operators That Failed Were Suspended (← links)
- PNO-III-86-021, several Mechanical Snubbers Found Inoperable During Augmented Inservice Program to Demonstrate Operability of Shock Absorbers.Failed Snubbers Found in safety-related Sys,Including RHR Sys,Msiv,Hpcs & LPCS (← links)
- PNO-III-86-005, on 860122,during Ultrasonic Testing on Recirculation Sys Welds,Two Cracks Discovered on 12-inch Diameter Piping.Consultant Investigating Cause of Cracks & Determining Corrective Action (← links)
- PNO-III-97-025, on 970311,licensee Declared Unusual Event After Determining,Water Level in LaSalle Lake Exceeded Plant Design Limits.Nrc Resident Inspectors Will Continue to Monitor Licensee Activities (← links)
- PNO-III-96-074, on 961213,licensee Planned to Extend Outages for LaSalle Units to Address Operational & Engineering Issues Identified.Team Also Raised Some Concerns in Area of Plant (← links)
- PNO-III-85-044, on 850531,unit Manually Scrammed Due to Decreasing Vacuum in Condenser.Caused by Rupture of Flexible Expansion Joint on Discharge Side of Circulation Pump 1B Flooding Crib House & Causing Loss of All Svc Water (← links)
- PNO-III-85-042, on 850527,security Personnel Discovered Water Bubbling Out of Ground Near Condensate Storage Tank.Caused by Broken Pipe 20 Ft Below Ground.Leak Halted When Personnel Closed Valve,Isolating Tank (← links)
- PNO-III-85-062, on 850719,confirmatory Action Ltr Issued Requiring Review of All Canceled or Rejected Change Requests to Verify Status of Drawing Changes Prior to Restarting Both Reactors (← links)
- PNO-III-85-060, on 850712,facility Shut Down for Maint on RHR Sys Train a Shutdown Cooling Injection Valve & Train B Suppression Pool Spray Valve.Valves Failed Local Leak Rate Testing.Outage Expected to Last Until 850722 (← links)
- PNO-III-98-047, on 981005,diver Lost Consciousness While in Unit 2 Suppression Pool.Diver Received Minor Contamination on Hair During Removal of Mask & Diving Suit.Diver Was Successfully Decontaminated (← links)
- PNO-III-86-015, on 860219,contractor Employee Suffered Apparent Back Injuries & Possible External Contamination in Fall from Ladder in Unit 1 Drywell.Individual Accompanied to Hosp by Licensee rad-protection Personnel (← links)
- ML20151U941 (← links)
- ML20151U399 (← links)
- PNO-III-86-052, on 860601,both Feedwater Pumps Tripped During Surveillance Test,Causing Reactor Water Level to Decrease Below Scram Level.Investigation to Determine If ATWS Occurred or If Instrumentation Faulty Underway (← links)
- PNO-III-89-057, on 890826,reactor Scrammed from 10 Percent Power,Apparently as Result of Pressure Spike in First Stage of Turbine (← links)
- PNO-III-89-016, on 890303,Unit 1 Reactor Scrammed from 86% Power as Result of Turbine Trip,Which Appeared to Be Related to Fault in Unit 2 Sys Auxiliary Transformer. Unit 1 Expected to Remain Shut Down for Three Days (← links)
- PNO-III-86-044, on 860509 & 11,reactor Scrammed on Low Reactor Water Level & After Receiving Group 1 Isolation Signal on High Main Steam Line Flow,Respectively.Util Decided to Repair Suspect Reactor Recirculation Pump Seal (← links)
- PNO-III-86-039, on 860425,licensee Received in-plant Telephone Call from Unidentified Male Re Bomb Threat.Area Evacuated & Facility Searched.No Bomb Found.Licensee Security Organization Continuing Investigation (← links)
- PNO-III-97-096, on 971211,unloaded Handgun & Ammunition Found in Brief Case of Il Resident Inspector.Inspector Placed on Administrative Leave & Il State Police Performing Investigation (← links)
- PNO-III-87-151, on 871209,licensee Identified Leak on Reactor Feed Pump B Min Flow Line to Condenser.Cause Unknown. Feedwater Pumps Visually Inspected.Power to Unit 2 Reduced to Take Pump out-of-svc for Closer Insp (← links)
- PNO-III-88-018A, on 880309,technician Error Resulted in Both Recirculation Pumps Tripping Followed by Isolation of Steam Supply to Feedwater Heaters.Reactor Tripped When Power Spike Reached 118% Setpoint on High Aprm.No Fuel Damage Occurred (← links)
- PNO-III-88-018, on 880309,reactor Scrammed.Caused by Technician Error.Licensee Elected to Place Unit in Cold Shutdown for Various Maint Activities.State of Il & NRC Notified (← links)
- PNO-III-96-063A, on 961003,extension of Forced Outage & Special Insp Team Dispatched Update Made.Unit Shut Down on 960922 to Repair Turbine Control Valve (← links)