Pages that link to "L-2019-147, Exigent Technical Specification Amendment Request One-Time Allowed Outage Time Extension for Inoperable EDG"
Jump to navigation
Jump to search
The following pages link to L-2019-147, Exigent Technical Specification Amendment Request One-Time Allowed Outage Time Extension for Inoperable EDG:
Displayed 50 items.
- ML15314A160 (← links)
- ML15280A392 (← links)
- ML15198A030 (← links)
- ML15191A403 (← links)
- ML15084A011 (← links)
- ML110730310 (← links)
- ML110730307 (← links)
- ML110730306 (← links)
- ML110730305 (← links)
- ML110730304 (← links)
- ML110730303 (← links)
- ML110730301 (← links)
- ML110730300 (← links)
- ML110730299 (← links)
- ML110730298 (← links)
- ML110730284 (← links)
- ML110730283 (← links)
- ML110730282 (← links)
- ML110730116 (← links)
- L-2016-087, Florida Power & Light Company, on Periodic Report of Changes to the St. Lucie Unit 2 Technical Specification Base (← links)
- L-2015-091, St. Lucie, Unit 2 - Supplemental Information for Technical Specification Change and Exemption Request Regarding the Transitioning to Areva Fuel (← links)
- LR-N14-0036, Special Report 311/14-01-00, Pursuant to the Requirements of Salem Unit 2 Technical Specification (TS) 3.3.3.1, Action 26, for the Unit 2 Plant Vent Radiation Monitor (2R41) Inoperable for >7 Days (← links)
- ML18096B784 (← links)
- ML18096B513 (← links)
- ML18096B508 (← links)
- ML18096B504 (← links)
- ML18096B499 (← links)
- ML18096B497 (← links)
- ML18096B494 (← links)
- ML18096B448 (← links)
- ML18088B305 (← links)
- ML18088B302 (← links)
- ML18088B285 (← links)
- ML18088B274 (← links)
- ML18088B266 (← links)
- ML18088B264 (← links)
- ML18088A951 (← links)
- ML18088A948 (← links)
- ML18088A713 (← links)
- L-2011-021, St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 7; Summary of Regulatory Commitments (← links)
- L-2011-021, St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 5; Appendix G, Holtec Report No. HI-2104753, St. Lucie Unit 2 Criticality Analysis for EPU and Non-EPU (← links)
- L-2011-021, St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 5; Appendix F, Camereron Ultrasonics Engineering Reports, Cover (← links)
- L-2011-021, St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 5; Appendix E, Supplement to Licensing Report Section 2.4.1 Reactor Protection, Engineered Safety Feature Actuation, and Control Systems (← links)
- L-2011-021, St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 5; Appendix D, List of Key Acronyms (← links)
- L-2011-021, St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 5, Appendix C, Grid Stability Analysis and System Impact Study for St. Lucie Plant with Proposed EPU (← links)
- L-2011-021, St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 5; Appendix B Additional Codes and Methods (← links)
- L-2011-021, St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 5; Appendix a Safety Evaluation Report Compliance (← links)
- L-2011-021, St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 4; Technical Specifications Bases Markups (← links)
- L-2011-021, St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 3; Renewed Facility Operating License and Technical Specifications Markups and Clean Pages (← links)
- L-2011-021, St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 1; Description and Technical Justifications for the Renewed Facility Operating License Technical Specifications and Licensing Basis Changes (← links)