ML18088A951

From kanterella
Jump to navigation Jump to search
Environmental Technical Specification Change, Revision 2. Consists of Adding Section 3.3, Onsite Meteorological Monitoring
ML18088A951
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 06/13/1975
From: Robert E. Uhrig
Florida Power & Light Co
To: Giambusso A
Office of Nuclear Reactor Regulation
References
Download: ML18088A951 (13)


Text

NRC DISTRIBUTION FOR PART 50 DOCKET MATERIAL (TEMPORARY FORM)

CONTROL NO' rlleURQ Florida Power Ii'B Light DATE OF DOC DATE R EC'D LTR TWX RPT OTHER Miami, Fla R E Uhrig 6-13-75 6-17-75 ORIG CC OTHER HRC PDR XXX TO:

Mr. A Giambusso CLASS UNCLASS PROPINFO 3 signed INPUT 40'ENT NO CYS REC'D SENT LOCAI PDR DOCKET NO:

50-335 DESCR I PTION: Ltr notarized. 6-13-75 trans ENCLOSURES: proposed revision 2 to Enviro Tech the following: Specs: consists of adding section '3.3, Onsite Meteorological Monitoring, to the ETS...

40 copies encl rec'd pLANT NAME: St. Lucie g 1 FOR ACTION/INFORMATION wtm 6-17-75 BUTLER (L) SCHWENCER (L) ZIEMANN (L) yREGAN (E)

W/ Copies W/ Copies W/ Copies W/( Copies CLARK (L) STOLZ (L) DICKER (E) LEAR (L)

W/ Copies W/ Copies W/ Copies W/ Copies

~PARR (L) VASSALLO (L) KNIGHTON (E) SPIES W/) Copies W/ Copies W/ Copies W/ Copies KNIEL (L) PURPLE (L) YOUNGBLOOD (E) X PM W/ Copies W/ Copies W/ Copies W/ op(es ibad INTERNAL DISTRIBUTION EG FILE TECH REVIEW BENTON LIC ASST A/T I ND i SCHROEDER GR IMES R. DIGGS (L) BRAITMAN

~

~OGC, ROOM'P-50GA GOSS I CK/STA F F CASE

'NI MACCARY G HT PAWLICKI GAMMILL

~KASTNER

~BALLARD H. GEAR IN (L)

E. GOULBOURNE (L)

P. KREUTZER (F)

SALTZMAN MELTZ GI AMBUSSO SHAO ~ SPANGLER J. LEE (L) PLANS BOYD STELLO M. MAIGRET (L) MCDONALD MOORE (L) HOUSTON E NVI RO S: REED (E) CHAr MAN DEYOUNG (L) NOVAK M. SERVICE (L) DUBE (Ltr)

CRULLER E. COUPE

'SKOVHOLT (L) ROSS DICKER S. SHEPPARD (L)

GOLLE R (L). (Ltr) IPPOLITO KNIGHTON IVI. SLATER (E)

PETERSON P, COLLINS ~TEDESCO YOUNGBLOOD H. SMITH (L) HA RT F I E LD'2)

',REGAN KLECK'E R

'DENISE gg(ggg I S. TEETS (L)

ZREG OPR ~'I LAINAS PROJECT LDR G. WILLIAMS(E) EISENHUT WIGGINTON FILE 5 REGION (2), BENAROYA "~V. WILSON (L)

~ HIPC 'VOLLMER H RLESS R. INGRAM (L)

Me DUNCAN EXTERNAL DIST BUTION Ft Pierce, Fle NATIONAL LABS P~~+

I OOAL FOR P D R-SAN/LA/NY

~

+ ASLB TIC (ABERNATHY(

NSIC (BUCHANAN)

(

A M W. PENNINGTON, Rrn E-201 GT 1

1 BROOKHAVEN NAT LAB G. U L R I K SON 0 R N L 1 1 CONSULTANTS 1

'1 Newton Anderson 'NEWMARK/BLUME/AGBABIAN Qeeee I

1

FLORIDA POWER 8L LIGHT COMPANY June 13 '975.

L-75-280 Mr. Angelo Giambusso, Director Division of Reactor Licensing Offi'ce of Nuclear Reactor .Regulation U. S. Nuclear Regulatory Coimnission ~)QV86

>washington, D. C. 20555 IIi ElIg'g't 4174,e~

PiM L~gj'~v,+~tI

Dear Mr. Giambusso:

K Re: St. Lucie Plant Unit No. S'eci.'fi:c'at'i'on'Cha'nm~tIh 1 Docket No.. 50-335

'nvi'r'o'nment'a'1* Te'chn'i'c'a'1 Florida Powe'r':'LightCompany hereby submits fox your review three signed originals and 40 copiesof proposed revision 2,to the 'St.

Lucie '1 Environmental Technical Specifications.

This rev'ision consi'sts of adding section 3.3,'ns'iit'e'eteorol'o ical i" *i.

Yours very truly, Robert .E. Uhrig Vice 'Pres'ident REU:nch Enclosure cc: Jack R. New'man, Esquire HELPING BUILD FLORIDA

lk

'I A

I t

1' h

  • 4

<~

'll

~ y l

STATE OF FLORIDA )

) SS COUNTY OF DADE, *

)

ROBERT,E..UHRIG, being first. duly sworn,, deposes'nd says:

That he 'is a Vice President of Florida Powe'r' Light'ompany, the 'Appli'cant herei'n;

.That. he has executed the foregoing instrument; that the stat'ements'ade 'in this said'nstrument are 'true 'and correct

.to,the best of his knowledge,'nformation and belie'f; and that he 'is .authorized to. execute the 'instr'ument on behalf

,of said Applicant.

o ert . rag 8

(Q y-Subscribed and sworn .to before me ths~aayoz 1975 ot ry u z.c zn an or t e

.Co nty of Dade,'tate 'of FloridaIC My Commission expires'"A NOTARY PULI STATE OF FLORIDA AT I ARI E NY COMMISSION EXPIRES JAN. 26, 1979 ERS

r,.~ y L

P.O. BOX 013100 MIAMI,FLA. 33101 0

FLORIDA POWER 5 LIGHT COMPANY June 13, 1975 L-75-280 Mr. Angelo Giambusso, Director Division of Reactor Licensing Office of Nuclear Reactor Regulation U. S'. Nuclear Reg'ulatoxy Commission Washington, D. C. 20555

Dear Mr. Giambusso:

Re: St. Lucie Plant Unit No. 1 Docket No. 50-335 Envi'ro'nmen't'al'echn'ic'al'e'cificati'onCh'an Light 'Company hereby submits for your review three

'e'lorida Powe'r &

signed originals and 40 .copies of proposed revision 2 to the St.

Lucie '1 Environmental Technical Specification's:'his revision, consists of adding section 3.3,On'sit'e Meteorolo ical

  • S.

Yours very truly, Vice President REU:nch

'nclosure cc: Jack R. Newman, Esquire HELPING BUILD FLORIDA

~ '.

5 ~

P 4

l II

~ $ 'I " t~

f

\ ~

1a Y f

"'4 I

5

,t 1 5 C

C b

t I

STATE OF FLORIDA )

) SS COUNTY OF DADE )

ROBERT E. UHRIG, being first duly sworn, deposes and says:

That he is a Vice President of Florida Power 6 Light Company, the 'Applicant herein; That he has executed the foregoing instrument; that the statements made in this said instrument are true and correct to the .best'f hi;s knowledge, information and belief; and that he's authorized to execute 'the 'instrument on behalf of said Applicant.

l

, I(rc:.

o ert . rag this ~

Subscribed and sworn to before day of ot ry u z.c zn an or t e me 1975 Co nty of Dade, State of Floridaa p rir, cc 'i iP " q r~s MY C<." ", ~Id JAN. 26, 1979 EXPIRES My Comm~ssz.on expires

~ ~

doNOE f ERS

0 ll

'I N

TABLE OF CONTENTS (Continued)

Pa<ac

2. 4. 6 Ef fluent Monitors 2-19
2. 4. 6.1 Liquid Rad Waste 2-19 Monitor 2.4. 6.2 Gaseous Radwaste 2-19 Monitor 2.4.6.3 Plant Vent Monitor 2-20 2.4.6.4 Spent Fuel Storage 2-20 Area Monitor 2.4.6.5 Condenser Air Ejector 2-21 Vent 2.4.6.6 Steam Generator Blow- 2-21 down Monitors 2.4. 6.7 Process Monitor 2-22 Calibration 2.4.6.8 Process Monitor 2-23 Inoperability 2.4.7 Containerized Wastes 2-23 3.0 ENVIRONMENTAL SURVEILLANCE 3-1 3.1 Non-Radiological Surveillance 3.1.A ABIOTIC 3-1 3.1.A.l Biocides 3-1 3.1.A.2 Heavy Metals 3-1 3.1.A.3 pH 3-2 3.1.A.4 Dissolved Oxygen 3-2 3 '.A.5 Salinity 3-2 3.1.A.6 Temperature 3-3
3. 1. B BIOTIC 3-3 a) Benthic Organisms 3-3 b) Plankton 3-4 c) Nektonic Organisms 3-4 d) Macrophytes 3-4 e) Water Quality 3-4 f) Migratory Sea Turtles 3-4a 3.2 Radiological Environmental Monitoring 3-5 3,3 Onsite Meteorological Monitoring 3-14 4.0 SPECIAL SURVEILLANCE 6 SPECIAL STUDY ACTIVITIES 4-1 4.1 Entrainment of Aquatic Organisms 4-1 F 2 Impingement of Aquatic Organisms 4-1 Rev. 2 6/13/75 Rev. 1 5/15/75 I: ') ~ ~ ~

e 3.3 ONSITE METEOROLOGICAL MONITORING Ob 'ective The objective of onsite meteorological monitoring is to adequately measure and document meteorological conditions at the site,.specifically at heights above ground that are representative of atmospheric conditions that exist at all effluent release points.

f S ecification The onsite meteorological monitoring program shall conform to the recommendations and intent of Safety Guide 23, Onsite Meteorolo ical Pro rams, and include instruments to sense wand speed and dz.rection at 33-ft and 190-ft, vertical temperature gradient between 33-ft and 200-ft, and ambient dry bulb and dewpoint temperatures at 33-ft. The location of the meteorological tower shall be located approximately 2400 feet north of the reactor complex.

Re ortin Re uirements Meteorological data shall be summarized and reported in a format consistent with the recommendations of Regulatory Guide 1.21 and Safety Guide 23. Summaries of data and observations shall be available to the U. S. Nuclear Regulatory Commission upon request. If the outage of any meteorological instrument(s) exceeds three consecutive days, the total outage time and dates of outage, the cause of the outage, and the instrument(s) involved sha'1 be reported within 30 days of the initial time of the outage to the U, S. Nuclear Regulatory Commission, Of fice of Inspection and Enforcement with a copy to the Office of Nuclear Reactor Regulation, Division of Technical Review.

Any modifications to the meteorological monitoring program as described above, or alterations of the area near the meteorological tower that would interfere with the measure-ment of meteorological conditions representative of the site, shall have the written approval of the U. S. Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation, prior to the initiation of the modification or alteration.

Bases The collection of meteorological data at the plant site will provide information which will be used to develop atmospheric diffusion parameters to estimate potential radiation doses to the public resulting from actual routine or accidental releases of radioactive materials to the atmosphere.

3-14 6/13/75

1c 4

r