L-2011-021, St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 7; Summary of Regulatory Commitments

From kanterella
(Redirected from ML110730310)
Jump to navigation Jump to search
St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 7; Summary of Regulatory Commitments
ML110730310
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 02/25/2011
From:
Florida Power & Light Co
To:
Office of Nuclear Reactor Regulation
References
L-2011-021
Download: ML110730310 (2)


Text

St. Lucie Unit 2 EPU Licensing Report Att. 7-1Summary of Regulatory CommitmentsSt. Lucie Unit 2L-2011-021Docket No. 50-389Attachment 7Attachment 7LICENSE AMENDMENT REQUESTEXTENDED POWER UPRATE

SUMMARY

OF REGULATORY COMMITMENTSFLORIDA POWER AND LIGHTST. LUCIE UNIT 2 This coversheet plus 1 page St. Lucie Unit 2 EPU Licensing Report Att. 7-2Summary of Regulatory CommitmentsSt. Lucie Unit 2L-2011-021Docket No. 50-389Attachment 7

SUMMARY

OF REGULATORY COMMITMENTSIntroductionThe regulatory commitments listed below are intended to maintain compliance with regulatory requirements during preparation for and upon extended power uprate (EPU) implementation. The commitments are based upon the plant changes summarized in license amendment request (LAR) Attachment 5, EPU Licensing Report. These commitments will be completed prior to the final implementation of EPU.REGULATORY COMMITMENTS1.Update the Inservice Testing Program to reflect changes to plant pumps and valves under EPU conditions.2.Provide operator training to account for increased EPU power level and resultant plant changes.3.Implement modification(s) to install a leading edge flow meter (LEFM) as described in LR Section 2.4.4, Measurement Uncertainty Recapture Power Uprate, and update UFSAR Section 13.7, Licensee-Controlled Technical Specification Requirements, to include Limiting Conditions for Operation (LCO) and Action Statements for the LEFM system.4.Implement modification(s) to replace RDF Corporation resistance temperature detectors as described in LR Section 2.3.1, Environmental Qualification of Electrical Equipment.5.Implement modification(s) to the AC electrical busses as described in LR Section 2.3.3, AC Onsite Power System. 6.Implement modification(s) to pipe supports for systems impacted by loads due to EPU conditions, as described in LR Section 2.2.2.2, Balance of Plant Piping, Components, and Supports.7.Implement a MetamicTM insert surveillance program as described in LR Section 2.8.6.2, Spent Fuel Storage, and update the UFSAR to include the program requirements.8.Implement modifications to the control room air conditioning system as described in LR Section 2.5.4.3, Reactor Auxiliary Cooling Water Systems, to accommodate higher component cooling water temperatures under EPU conditions.