Pages that link to "05000265/LER-1998-001, Forwards LER 98-001-00 Per 10CFR50.73(a)(2)(i)(B).Listed Commitments Made by Ltr"
Jump to navigation
Jump to search
The following pages link to 05000265/LER-1998-001, Forwards LER 98-001-00 Per 10CFR50.73(a)(2)(i)(B).Listed Commitments Made by Ltr:
Displayed 28 items.
- 05000254/LER-1998-019, Forwards LER 98-019-00,IAW 10CFR50.73(a)(2)(v)(B).Any Other Actions Described in Submittal Represent Intended or Planned Actions by Util.No Commitments Made (← links)
- 05000265/LER-1998-006, Forwards LER 98-006-00,IAW 10CFR50.73(a)(2)(v)(B). Commitments Made by Util Are Listed (← links)
- 05000254/LER-1998-021, Forwards LER 98-021-00,IAW 10CFR50.73(a)(2)(i)(B). Commitments Made by Util Are Listed (← links)
- 05000254/LER-1998-020, Forwards LER 98-020-00,IAW 10CFR50.73(a)(2)(v)(B). Commitments Made by Util Listed (← links)
- 05000254/LER-1998-024, Forwards LER 98-024-00 Per 10CFR50.73(a)(2)(i)(B).List of Commitments Made by Util,Provided (← links)
- 05000254/LER-1998-023, Forwards LER 98-023-00 Per 10CFR50.73(a)(2)(v)(D).List of Licensee Commitments,Provided (← links)
- 05000254/LER-1998-022, Forwards LER 98-022-00 for Quad Cities Nuclear Power Station,Unit 1,per 10CFR50.73(a)(2)(iv).Commitments Made by Util,Listed (← links)
- 05000254/LER-1998-003, Forwards LER 98-003-00,which Describes Condition Prohibited by Plant Ts.Commitments Made by Ltr,Listed (← links)
- 05000254/LER-1998-002, Forwards LER 98-002-00 IAW 10CFR50.73(a)(2)(i)(B),stating That Licensee Shall Rept Any Operation or Condition Prohibited by Plant Ts.Commitment Made by Ltr Provided (← links)
- 05000254/LER-1998-007, Forwards LER 98-007-00,re Condition That Was Outside Design Basis of Plant,Per 10CFR50.73(a)(2)(ii)(B).Commitments Made by Ltr,Listed (← links)
- 05000254/LER-1998-004, Forwards LER 98-004-00 for Quad Cities Nuclear Power Station.Commitments Made by Ltr,Listed (← links)
- 05000254/LER-1998-025, Forwards LER 98-025-00,IAW 10CFR50.73(a)(2)(v)(D). Commitments Made by Util,Listed (← links)
- 05000265/LER-1998-005, Forwards LER 98-005-00,per 10CFR50.73(a)(2)(vii)B. Commitments Made by Util,Listed (← links)
- 05000254/LER-1998-011, Forwards LER 98-011-00,IAW 10CFR50.73(a)(2)(i)(B). Commitments Made within Ltr,Listed (← links)
- 05000254/LER-1998-006, Forwards LER 98-006-01,re RB Post LOCA Temps.Actions Listed Are Required for Closure of Issue But Are Not Required Prior to Startup (← links)
- 05000254/LER-1998-012, Forwards LER 98-012-01,which Describes Unit 1 Reactor Bottom Head Drain Line Developed Leak.No New Commitments Made within Submittal (← links)
- 05000254/LER-1998-015, Forwards LER 98-015-00 Re CREVS Declared Inoperable.Listed Commitments Being Made by Ltr (← links)
- 05000265/LER-1998-003, Forwards LER 98-003-00,submitted IAW 10CFR50.73(a)(2)(iv). Commitments Made within Ltr Listed (← links)
- 05000254/LER-1998-018, Forwards LER 98-018-00,IAW 10CFR50.73(a)(2)(iv).Commitments Made within Ltr,Listed (← links)
- 05000254/LER-1998-017, Forwards LER 98-017-00 for Quad Cities Nuclear Power Station.Rept Submitted IAW Requirements of Code of Federal Regulations,Title 10CFR50.73(a)(2)(v)(D).QCOS 5750-02 Will Be Revised to Clarify Sequence & Preference by 980825 (← links)
- 05000265/LER-1998-002, Forwards LER 98-002-00,IAW 10CFR50.73(a)(2)(i)(B). Commitments Made within Ltr,Listed (← links)
- 05000254/LER-1998-001, Informs of Change of Committed Due Date Re Rev to Logic Test Procedures as Stated in LER 98-001,dtd 980202.Due Date Is Now 980626 to Allow Station Necessary Time to Perform Appropriate Addl Reviews of Revised Procedures (← links)
- ML20217E696 (redirect page) (← links)
- 05000265/LER-1998-001 (redirect page) (← links)
- 05000265/LER-2014-002 (← links)
- 05000265/LER-2014-003 (← links)
- 05000265/LER-2014-004 (← links)
- 05000265/LER-2016-002 (← links)
- 05000265/LER-2016-001 (← links)
- 05000265/LER-2017-001 (← links)
- 05000265/LER-1982-008, Forwards LER 82-008/03L-0 (← links)
- 05000265/LER-1982-007, Forwards LER 82-007/03L-0 (← links)
- 05000265/LER-1982-006, Forwards LER 82-006/03L-0 (← links)
- 05000265/LER-1982-017, Forwards LER 82-017/03L-0 (← links)
- 05000265/LER-1993-018, Forwards LER 93-018-01.Motor 1-1301-49 Replaced W/Improved Motor.Documented Review of Station Trending Program Will Be Initiated to Evaluate How Program Failed to Identify Adverse Trends (← links)
- 05000265/LER-1983-004, Forwards LER 83-004/03L-0 (← links)
- 05000265/LER-1982-014, Forwards LER 82-014/03L-0 (← links)
- 05000265/LER-1994-002, Forwards LER 94-002-00.OGCP 4-1 Will Be Revised to Clarify Specific Requirements for Independent Rod Verification (← links)
- 05000265/LER-1982-015, Forwards LER 82-015/03L-0 (← links)
- 05000265/LER-1982-016, Forwards LER 82-016/03L-0 (← links)
- 05000265/LER-1982-012, Forwards LER 82-012/03L-0 (← links)
- 05000265/LER-1982-011, Forwards LER 82-011/01T-0 (← links)
- 05000265/LER-1983-002, Forwards LER 83-002/03L-0 (← links)
- 05000265/LER-1983-003, Forwards LER 83-003/03L-0 (← links)
- 05000265/LER-1982-023, Forwards LER 82-023/03L-0 (← links)
- 05000265/LER-1982-018, Supplemental LER 82-018/03L-1:on 821006,emergency Diesel Generator Tripped on High Temp After Loading.Caused by Fouling of Diesel Generator Cooling Water Sys.Both HX Replaced (← links)
- 05000265/LER-1994-001, Forwards LER 94-001-00.IST Procedures Revised to Incorporate Interim Procedure Requirements & RCIC Pump Tested Using Revised Procedures (← links)
- 05000265/LER-1982-020, Forwards LER 82-020/03L-0 (← links)
- 05000265/LER-1982-021, Forwards LER 82-021/03L-0 (← links)
- 05000265/LER-1982-019, Forwards LER 82-019/03L-0 (← links)
- 05000265/LER-1994-010, Forwards LER 94-010 Re Unplanned Scram from Position 48 to 00 During Instrument Maint Surveillance (← links)
- 05000265/LER-1995-003, Forwards LER 95-003 Re Shutdown Cooling Not Being Available (← links)
- 05000265/LER-1983-021, Revised LER 83-021/01T-5:on 831028,ultrasonic Exams of Large Bore Stainless Steel Pipe Welds Identified 11 Welds W/Crack Indications.Caused by Intergranular Stress Corrosion Cracking.Weld Overlay Performed (← links)
- 05000265/LER-1983-018, Revised LER 83-018/01T-1:on 831011,discovered 1-1/4 Inch long,20% through-wall Linear Indication in Weld 12S-S27. Caused by Intergranular Stress Corrosion Cracking.New Welds & Elbow Installed (← links)
- 05000265/LER-1976-012, Updated LER 76-012/03L-1 Correcting Event Type,Category & Rept type.W/761001 Forwarding Ltr (← links)
- 05000265/LER-1983-001, Forwards LER 83-001/03L-0 (← links)
- 05000265/LER-1983-020, Revised LER 83-020/01T-1:on 831028,weld 02B-S9,22-inch Pipe to Cap,Weld 02BS-S12,28-inch Elbow to Pipe & Weld 02BS-F14, 28-inch Pipe to Elbow Weld Had Circumferential Linear Indications (← links)
- 05000265/LER-1983-005, Forwards LER 83-005/03L-0 (← links)
- 05000265/LER-1988-006, Errata to LER 88-006-02:on 880404,station Notified That Eleven Flued Head Anchors Did Not Meet Design Requirements. Caused by Misinterpretation of Scope & Design Structures.Mod Initiated to Revise Structure (← links)
- 05000265/LER-1995-004, Forwards LER 95-004-01 Re Condenser Vacuum Scram Switches Found Out of TS Limits Due to Apparent Setpoint Drift (← links)
- 05000265/LER-1995-006, Forwards LER 95-006-00 Re Feed Breaker for Motor Control at Switchgear Tripped from Current Overload (← links)
- 05000265/LER-1995-001, Informs of Commitments Being Made by Ltr Re Suppl Info Concerning LER 95-001 (← links)
- 05000265/LER-1994-008, Informs of Commitments Being Made Re LER 94-008,rev 0 (← links)
- 05000265/LER-1996-001, Forwards LER 96-001-00.Listed Commitments Made,Including Event Will Be Included as Part of Continuing Training for Both Licensed Operators & Engineering Dept (← links)
- 05000265/LER-1996-002, Forwards LER 96-002-00.Licensee Revised Qcop 2300-1 to Ensure That Piping Downstream of Sys Isolation Valve Is Filled & Vented After Maint (← links)
- 05000265/LER-1996-003, Forwards LER 96-003-00 Submitted IAW Requirements of 10CFR50.73(a)(2)(v)(D).Commitments Made by Ltr,Submitted (← links)
- 05000265/LER-1998-006, Forwards LER 98-006-00,IAW 10CFR50.73(a)(2)(v)(B). Commitments Made by Util Are Listed (← links)
- 05000265/LER-1997-008, Forwards LER 97-008-00 IAW Requirements of 10CFR50.73(a)(2)(i)(B).Commitments Made by Ltr,Listed (← links)
- 05000265/LER-1992-005, Forwards LER 92-005-01 Re Event That Occurred on 920125 at Quad Cities Unit 2.Encl LER Rescinds Design Changes, P04-1(2)-92-009,as Corrective Action (← links)
- 05000265/LER-1997-001, Forwards LER 97-001-01 for Quad Cities Nuclear Power Station,Iaw 10CFR50.73(a)(2)(v)(D).Commitments Made by Util, Listed (← links)
- 05000265/LER-1999-002, Forwards LER 99-002-00 for Quad Cities Nuclear Power Station IAW Requirements of 10CFR50.73(a)(2)(i)(B).Util Commits to One Listed Action (← links)
- 05000265/LER-1997-002, Forwards LER 97-002-01 Which Identifies Addl Discrepancy in LER 97-002-00.Quad Cities Nuclear Power Station Unit 2 Shutdown 022897 Also Required Because of Loss of Primary Containment Integrity (← links)
- 05000265/LER-1999-001, Forwards LER 99-001-00,IAW 10CFR50.73(a)(2)(iv).Commitments Made by Util Are Listed (← links)
- 05000265/LER-1987-004, Informs That 870309 LER 87-004-00 Cover Ltr Misnumbered LER as 86-004-00.Correction Requested (← links)
- 05000265/LER-1997-003, Forwards LER 97-003-01 Re Core Spray Room Cooler 2B That Fouled Due to Hydrolyzing Debris.Commitment Listed (← links)
- 05000265/LER-1997-005, Forwards LER 97-005-01 Re Unit 2 Reactor Placed in Mode 2 W/O Required Number of Emergency Diesel Generators Operable. Commitment Listed (← links)
- 05000265/LER-1998-005, Forwards LER 98-005-00,per 10CFR50.73(a)(2)(vii)B. Commitments Made by Util,Listed (← links)
- 05000265/LER-1988-062, Advises That Cover Ltr to LER 88-062 Inadvertently Refers to LER 88-028 & Requests That Ltr Be Be Attached to Rept (← links)
- 05000265/LER-1998-003, Forwards LER 98-003-00,submitted IAW 10CFR50.73(a)(2)(iv). Commitments Made within Ltr Listed (← links)
- 05000265/LER-1998-002, Forwards LER 98-002-00,IAW 10CFR50.73(a)(2)(i)(B). Commitments Made within Ltr,Listed (← links)
- 05000265/LER-1997-006, Forwards LER 97-006-00 Re Cable in Unit 2 Being in Same Fire Area as Fire of Concern Due to Ineffective Implementation of Original Safe Shutdown Analysis.List of Commitments Provided (← links)
- 05000265/LER-1997-012, Informs of Change of Committed Due Date Re Rev to Procedure Contained in LER 97-012,dtd 971218.Due Date Is Now 980828 Due to Work Prioritization & Backlog for Resources for Completion of Engineering Request (← links)
- 05000265/LER-1998-001, Forwards LER 98-001-00 Per 10CFR50.73(a)(2)(i)(B).Listed Commitments Made by Ltr (← links)
- 05000265/LER-1997-010, Forwards LER 97-010-00 IAW Requirements of 10CFR50.73(a)(2)(i)(B).No Commitments Made (← links)
- 05000265/LER-1993-022, Informs of Cancellation of Commitment Contained in LER 93-022.RCIC Bed Plate Drain Lines Do Not Need to Be Rerouted Based on Check Valve Insp Frequency & Addition of Ball Valves (← links)
- 05000265/LER-1997-015, Informs NRC of Change to Committed Due Date Contained in Ltr Re LER 97-015 (← links)
- 05000265/LER-1985-007, Responds to NRC Re Violations Noted in Insp Rept 50-265/85-18.Corrective Actions:Four Pressure Transmitters Will Be Returned to Original Configuration by 851031 & Work Request Sys Revised.Rev 1 to LER 85-007 Encl (← links)
- 05000265/LER-1997-004, Forwards LER 97-004-00,IAW 10CFR50.73(a)(2)(ii)(B).Unit 1 DWEDS & DWFDS Will Be Examined to Verify Video Tape Determination During Next Refueling Shutdown to Ensure Covers on Unit Installed Per Applicable Design Drawings (← links)
- 05000265/LER-1982-010, Forwards LER 82-010/03L-0 (← links)
- 05000254/LER-1998-010, Forwards LER 98-010-00 Per 10CFR50.73(a)(2)(i)(B).Listed Commitments Made by Ltr (← links)
- 05000254/LER-1998-008, Forwards LER 98-008-00,re Event Which Took Place at Quad Cities Nuclear Power Station.Commitments Made within Ltr, Listed (← links)
- 05000254/LER-1998-014, Forwards LER 98-014-00,stating That Licensee Shall Rept Any Operation or Condition Prohibited by Plant Tss.No Commitments Being Made by Ltr (← links)
- 05000254/LER-1998-005, Forwards LER 98-005-00 Re Event Which Occurred at Quad Cities Nuclear Power Station.Commitments Made within Ltr, Listed (← links)