ML17229B068

From kanterella
Jump to navigation Jump to search
Forwards Comments on Exams 50-335/98-302 & 50-389/98-302 on 981130-1204 & 14-18 for Consideration by Nrc.Comments Effect Questions 22,23,47,59,61,66,77,88 & 98 on RO Exams & 22,23, 47,59,61 & 66 on SRO Exams
ML17229B068
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 12/22/1998
From: Stall J
FLORIDA POWER & LIGHT CO.
To: Peebles T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML17229B050 List:
References
50-335-98-302, 50-389-98-302, L-98-318, NUDOCS 9903240147
Download: ML17229B068 (393)


Text

Florida Power 5 light Company, 6351 S. Ocean Drive, Jensen Beach, FL 34957 FPL December 22, 1998 L-98-318 10 CFR 55.5 Regional Administrator, Region II U. S. Nuclear Regulatory Commission Attn: Mr. Thomas A. Peebles, Chief Operator Licensing and Human Performance Branch Atlanta, GA 30303 Re: 'St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Operator License Training Program December 18 1998 RO/SRO Exam Comments On December 18, 1998, the NRC administered Reactor Operator (RO) and Senior Reactor Operator (SRO) Examinations at St. Lucie Plant. An exam analysis was performed after administration of the exarps and the attached comments on the RO/SRO written examinations are submitted by the facility for consideration by the NRC. These comments affect questions 22, 23, 47, 59, 61, 66, 77, 88, and 98 on the RO examination. The comments on questions 22, 23, 47, 59, 61, and 66 also affect the SRO Examination.

The nine graded exam sheets for the six RO and three SRO candidates and the proctor comment sheets are forwarded for your review. Please contact Tim Bolander if you have any questions.

Very truly yours, J. A. Stall Vice President St. Lucie Plant JAS/GRM Attachments 9903240147 9903%2 PDR ADQCK .05000335 V PDR an FPL Group company ENCLOSURE 3 l0$ giF nt<<q

St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 L-98-318 Attachment 2 Florida Power A Light Company December 18, 1998 RO/SRO Written Examination Comments

Question 22, RO Exam Comment:

Late entries are documented in the Iog with the actual time and date of occurrence.

This may result in the entry being out of chronological sequence.

Recommendation:

Accept A and C

Reference:

AP 0010120, "Conduct of Operations" Late entries were not taken into consideration when the question was validated and reviewed.

USNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 22 Unit 1 has tripped from 100% power due to a feedwater problem. According to AP-0010120, "Conduct of Operations", which of the following is the approved method of chronological log entries during this event?

a. The events can be reconstructed at a later time using all available references, but must be made in chronological order when making an entry.

'b. The desk RO will record all events in the RCO chronological log as they occur, after performing SPTAs.

c. The events can be reconstructed at a later time using all available references, chronological order is desired but not necessary when making an entry.
d. A designated person, preferably the STA, will record all events in the'CO chronological log as they occur.

22

Page 21 of 86 ST. LUCIE PLANT ADMINISTRATIVEPROCEDURE NO. 0010120, REVISION 109 CONDUCT OF OPERATIONS APPENDIX D LOG KEEPING (Page 1 of 8)

1. General:

A. Watch station log entries shall be recorded in ink or by another permanent, reproducible recording method.

B. There shall be no erasures, liquid paper, correction tape, highlighters or other methods of obliteration. Handwritten errors shall be lined through to indicate a deletion, but the deletion entry shall be legible. The operator making the deletion shall initial along side it and enter the correct information.

C. Log books are considered a legal record and are to be limited to factual information.

D. Completed log books and hard copies of electronic logs shall be maintained for the life of the plant.

E. Plant Management will conduct periodic reviews of the RCO chronological log.

This review shall be documented by an entry in the chronological log.

2. Chronolo ical Lo s:

A. Log books and/or computerized logs shall be maintained by the RCO, NO/SNPO, NTO/NPO and ANPO.

g, B. Log entries shall be CONCISE and DEFINITIVE. Entries shall be complete enough to reconstruct the events of the shift. They shall be made in a style to provide an inclusive history of eve'nts or evolutions including their disposition regardless of the time or date of commencement. Particular attention should be made to entries pertaining to any abnormal condition or occurrence.

1. When it is necessary to correct handwritten information recorded in error, or electronically recorded information on a previous shift, then the entry shall be recorded with the actual time, and date (if necessary), of occurrence, the words "Corrected Entry" in parenthesis, and the information to be logged.

Example: 1234 Started the 1B EDG for surveillance run 1345 Secured the 1A EDG. Surveillance run SAT.

1234 (Corrected Entry) Started the 1A EDG for surveillance run

Page 22 of 86 ST. LUCIE PLANT ADMINISTRATIVEPROCEDURE NO. 0010120, REVISION 109 CONDUCT OF OPERATIONS APPENDIX D LOG KEEPING (Page 2 of 8)

2. (continued)

Evolutions, manipulations and operations that are performed, observed, or monitored by operators NOT actively assuming the responsibilities of a particular watch station shall be recorded in the applicable watch station chronological log and initialed by that operator. The operator should notify the responsible watchstander of the log entry.

r D. Times for each entry shall be as near correct as possible using military time.

The entries are to be made in chronological order.

1. When it is necessary to insert additional information after the fact, Then the entry shall be recorded with the actual time, and date (if necessary),

of occurrence, the words Late Entry in parenthesis, and the information to be logged.

Example: 1234 Started the1A EDG forsurveillance run 0827 (Late Entry) Filled the 1A2 SIT with the 1B HPSI Pump in accordance with OP 1-0410021

~

1345 Secured the 1A EDG. Surveillance run SAT.

r E. No lines shall be left blank on a handwritten chronological log. If no pertinent entries to plant operation are recorded between shifts or between the last entry of a shift and the bottom of a page, Then No further entries shall be recorded on the first blank line and single vertical line with arrow at the bottom shall be drawn down to the next shift's first entry or the bottom of the page, whichever applies.

For example: No further entries F. When. events occur such that multiple entries are required in accordance with this appendix and/or operator attention to needs of the plant prevent making entries as they occur, such as in the everit of a plant trip, utilization of other information sources (SOER, chart recorders, rough logs, etc.) is permissible to reconstruct events as accurately as possible for entry into the chronological log.

Question 23, RO Exam Comment:

The change to the procedure is incorporated within 90 days. This will result in the actual Temporary Change being canceled.

Recommendation:

Accept A and D

Reference:

ADM-11.03, "Temporary Changes to Procedures" During validation and review, the TC process was not completely followed through and no one realized the TC was actually terminated.

USNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 23 The Unit 1 SNPO was in the process of performing a valve lineup when he discovered an incorrect valve number and valve position. To correct this condition, he generated a temporary change (TC) to the procedure IAWADM-11.03, "Temporary Change to Procedures". Which of the following describes the status of the TC, ninety five days later, assuming no action was taken by the originator?

The Temporary Change:

a. was automatically canceled after 90 days.
b. still exists in the TC log.
c. was canceled after the valve lineup was performed.
d. was automatically incorporated into the procedure.

23

REVISION NO.: PROCEDURE TITLE: PAGE:

6 PROCEDURE No.: TEMPORARY CHANGE TO PROCEDURES 16 of 22 ADM-11.03 ST. LUCIE PLANT 6.0 INSTRUCTIONS, (continued) 6.3 Closing a TC NOTE

~ The following step only applies to TCs written against a PSL procedure.

~ TCs to Contractor or Vendor procedures shall expire upon coITIpletion of the activity or on the date specified in Block 2 on Appendix A,

1. If the TC is to become a permanent change, the FRG Technician shall forward a copy of the TC to Responsible Procedures Group.

A. The Responsible Procedures Group shall:

1. Review the TC to verify compliance with Ql 5-PSL-1, Preparation, Revision, Review/Approval of Procedures.
2. If the TC affects an upgraded procedure, verify the proposed change is written in accordance with ADM-11.02, St. Lucie Procedure Writer's Guide..
3. If required, modify the TC in accordance with Ql 5-PSL-1, Preparation, Revision, Review/Approval of Procedures.
4. When the TC meets the necessary requirements,.

complete, sign and date Block 2 of the Temporary Change Closure Form.

B. When the Responsible Procedures Group approves the TC, the

~

Procedure Production Group shall:

1. Attach the signed copy of the Temporary Change Closure Form to the original TC package.
2. Word process the TC as a permanent change within 90 days. /R6

, C. If a procedure revision is implemented before an associated TC is incorporated, the outstanding TC shall be processed as follows;

REVISION NO.: PROCEDURE TITLE: PAGE:

PROCEDURE No.: TEMPORARY CHANGE TO PROCEDURES 22 of 22 ADM-11.03 ST. LUCIE PLANT APPENDIX B TEMPORARY CHANGE CLOSURE FORM (Page 1 of 1)

TC Number Procedure Number FRG Review Date Date TC Completed

/ /

1. CLOSING A ONE TIME ONLY TC TO:

FROM:

Procedure Production Group Date: ~

Department Providing Notification Notifier/Contact:

Print Name Phone The following One Time Only TC has been completed and has been removed from the Active TC Log.

2. CLOSING A TC CI Cl Similar changes that affect the other Unit's procedure, related train or Yes N/A related channel(s) have been changed or identified to be changed.

r Actions Taken:

This TC may become a permanent change.

Reviewed by:

Signature Print Name Date

fi Question 47, RO Exam Comment:

The Off-Normal Procedure directs Chemistry to be notified to perform local sampling, but does not specify primary or secondary sampling.

Recommendation:

Accept B and D

References:

1[2]-ONP-49.01, "SUPS - Non-Safety Vital or Fire and Security Inverter Malfunction" This was not picked up in validation and review because none of the exam validators missed this question.

USNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 47 The Unit 2 Fire and Security Sups has been de-energized due to an electrical fault remain out of service for 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />. According to 2-ONP-49.01, "Sups - Non Safety and'ill Vital AC or Fire and Security Inverter Malfunction", which of the following actions must be performed on Unit 2 that would NOT have to be performed in the same situation on Unit 1?

a. All vital access doors must be posted.
b. Local primary sampling for activity must be performed.
c. Fire watches must be posted.
d. Local secondary sampling for activity must be performed.

47

REVISION NO.: PROCEDURE TITLE: PAGE:,

0 SUPS - NON-SAFETY VITALAC OR FIRE AND PROCEDURE NO.: SECURITY INVERTER MALFUNCTION IP-49.01 ST LUCIE UNIT 2

6. OPERATOR ACTIONS (continued) 6.3 Loss of Fire and Security SUPS Inverter (continued)

INSTRUCTIONS CONTINGENCY ACTIONS NOTE If the Fire and Security Inverter is left out of service for greater than 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, the following compensatory measures are required;

~ 'Fire watches set in required areas.

~ Chemistry notified that sampling will be from local sample points,

6. CHECK with the Control Room to verify power has been restored.

NOTIFY EM to investigate the malfunction and repair the inverter.

8. When the inverter has been repaired, Then RESTORE the inverter to service in accordance with 2-NOP-49.03, Fire and Security SUPS Inverter Operation.

END OF SECTION 6.3

REVISION NO.: PROCEDURE TITLE: PAGE:

0 SUPS - NON-SAFETY VITALAC OR FIRE AND PROCEDURE NO.: INVERTER MALFUNCTION 'ECURITY 13 of 17 1-ONPQ9.01 ST. I UCIE UN)T 1 6.0 OPERATOR ACTIONS (continued) 6.3 Loss of Fire and Security SUPS Inverter (continued)

INSTRUCTIONS CONTINGENCY ACTIONS NOTE If the Fire and Security Inverter is left out of service for greater than 1 hour, compensatory fire watches will be required.

5. CHECK with the Control Room to verify power has been restored.
6. NOTIFY EM to investigate the malfunction and repair the inverter.
7. When the inverter has been repaired, Then RESTORE the inverter to service in accordance with 1-NOP-49.03, Fire and Security SUPS Inverter Operation.

END OF SECTION 6.3

Question 59, RO Exam Comment:

Two MG Sets running with the tie breaker (TCB-9) open is not allowed by procedure.

Recommendation:

Accept B and C

Reference:

1-NOP-66.01, "CEDM MG Set Operation" Validated the question with P8 ID, did not refer to the procedure for operational accuracy.

USNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 59 The following conditions exist:

Motor Generator (MG) set 1A and 1B are running Bus tie breaker (TCB ¹9) is open Reactor Trip breakers 3, 4, 7 and 8 are open (B side)

Reactor Trip breakers 1, 2, 5 and 6 are closed (A side)

Which of the following. is correct concerning the closure of the reactor trip breakers 3, 4 7 and 8 by the RO?

The operator

a. may dose the reactor trip breakers in any combination at any time.
b. must close the bus tie breaker prior to closing the reactor trip breakers.
c. must en'sure one MG set is taken out of service prior to closing the reactor trip breakers.
d. must synchronize 1A and 1B MG sets with the bus tie breaker open prior to closure of the reactor trip breakers.

'9

REVISION NO.: PROCEDURE TITLE: PAGE 0 .CEDM MG SET OPERATION PROCEDURE NO.:

NORMAL OPERATING PROCEDURE 1-NOP-66.01 ST. LUCIE UNIT 1 k,~x 4.0 PRECAUTIONS AND LIMITATIONS 4

4.1 Do NOT attempt to parallel the MG sets across any TCB.

Synchronizing capability is NOT available across any TCB.

4.2 The following conditions cause an MG set trip:

Output overvoltage (Setpoint: 267 plus or minus 1%VAC)

2. Input undervoltage (Setpoint: 415VAC)
3. High/Low field current (6.2 amps high; 1.2 amps low)
4. -

Output underfrequency (Setpoint: 55 Hz) 4.3 The following conditions cause a reactor trip'circuit breaker to OPEN:

1. Loss of DC control power
2. Overcurrent
3. Manual or automatic reactor trip 4A Normal operation is two MG set parallel operation. If this condition CANNOT be met, Then a one MG set line-up may. be used. A two MG set line-up with TCB 9 OPEN shall NOT be used.

4.5 If the sync check relay is determined to be failed, Then CONTACT the Electrical Maintenance Department. The MG set output breakers can NOT be closed in either Manual or Auto mode with the Sync check relay inoperable.

4.6 Following the starting and paralleling of the second MG set, the time duration of running unloaded should be limited to approximately one hour to avoid situations where an unbalanced load could result in a MG set trip.

5.0 RECORDS REQUIRED 5.1 A copy of this procedure shall be maintained in the plant files in accordance with Ql 17-PR/PSL-1, Quality Assurance Records.

5.2 Normal RCO and or SNPO chronological log entries.

'I h

Question 61, RO Exam Comment:

At 88% Steam Generator level, both main feedwater pumps will trip, terminating the event. No correct answer.

Recommendation:

Delete question 61

Reference:

0711310, "Main Feedwater and Condensate Systems" When validated on simulator, Narrow Range indication was observed to go to 100%

indication after feedwater flow stopped due to swell. Neglected to observe Wide Range indication which did not reach 100%.

The S/G feed pumps will trip under the following conditions:

1. Lube oil pressure <4 psig.

2.. Operating pump suction pressure c275 psig.

3. Electrical fault.
4. Loss of one condensate pump with total feed flow >50% and both feed pumps running. (Loss of condensate pump trips its respective side feed pump)
5. Both running condensate pumps are stopped.
6. Feedwater pump suction flow '~3000 gpm.
7. Hi-Hi steam generator level ~90% [~88%].

Each feedwater pump motor has two radial sleeve bearings, which are lubricated and cooled by oil from the feed pump oil system. Each feed pump's oil system has a shell-and-tube heat exchanger for oil cooling. The heat exchanger is supplied with cooling water from the turbine cooling water system.

'I Forced oil lubrication for the feed pump and motor is supplied by a shaft-driven positive displacement pump mounted on the end of the pump shaft. This pump supplies oil for the feed pump and motor bearings. In addition there is an auxiliary oil pump in each feed pump's oil system.

0711301, Rev.13 13 FOR TRAINING USE ONLY

USNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION QUEST(ON 61 The following conditions exist:

Unit 2 is at 50% power, all equipment operable A large, unisolable instrument air leak occurs The operators manually trip the reactor when I/A pressure reaches 50 .

pslg Which of the following correctly describes Steam Generator water level trends and the reason for the trends immediately following the trip? (Assume no operator action)

Steam Generator levels will:

a. increase to approximately 80% NR, then decrease after the main feed reg valves close.
b. decrease due to main feed isolation valves failing closed.
c. increase to solid conditions due to no response from the main feedwater control system.
d. decrease to normal post trip values as 15% bypass valves establish 5%

feed flow to each Steam Generator.

61

Question 66, RO Exam Comment:

A Human Clearance may be used to enable safe plant shutdown or a degrading plant condition. The initial conditions given in the stem of the question could meet the criteria for a degrading plant condition.

Recommendation:

Accept A and B

Reference:

ADM-09.04, "In-Plant Equipment Clearance Orders" Did not adequately review the Clearance Procedure to detect the plausibility of the Human Clearance criteria.

USNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 66 The following conditions exist:

Unit 2 is at 100% power An instrument air leak has occurred at the instrument air accumulator on the 19.5'levation of the turbine building The leak has been isolated by a single isolation valve Service air and Instrument air have been crosstied Mechanical Maintenance is standing by to repair the leak Which of the following describes the ~ZLuua administrative requirements in this case that will allow Mechanical Maintenance to begin work?

a. A full Equipment Clearance Order, must be issued prior to Mechanical Maintenance commencing work.
b. A Human Clearance can be put in place to allow Mechanical Maintenance to commence work.
c. A Caution tag must be placed on the isolation valve prior to Mechanical Maintenance commencin'g work.
d. A deviation tag can be placed on the isolation valve and instrument air crosstie to allow Mechanical Maintenance to commence work.

66

0 REVISION NO.. PROCEDURE TITLE: PAGE:

6, IN-PLANT EQUIPMENT CLEARANCE ORDERS PROCEDURE NO 5 of 118 ADM-09.04 ST. LUCIE PLANT 1.0 PURPOSE.

1.1 This procedure provides guidance in the use of Equipment Clearance Orders (ECO) for isolation of equipment to protect personnel from energy sources, when possible, for the use of other controls when isolation is not possible, and for administrative control of equipment.'.

Compliance with this procedure provides a safe working environment for personnel and equipment.

1.2 This procedure provides guidance in the use of a Human Clearance.

Human Clearances may be used to enable safe plant shutdown in the event of an emergency or a degrading plant condition which would require an immediate response to ensure the safety and welfare of plant employees for the following tasks:

~ Cleaning ICW/CCW Basket Strainers

~ Cleaning ICW/TCW Basket Strainers

~ Cleaning Screen Wash Pump Basket Strainers

~ Cleaning Lube Water Strainers

~ Hand roll and vent of a charging pump may be done under a Human Clearance.

~ Cleaning of the Chemical, Equipment, and Laundry Drain during conditions that limit the time available for hanging Tahk'trainers a clearance.

~ During declared plant emergencies (activation of the St. Lucie Plant Radiological Emergency Plan), Re-entry Teams are dispatched, under the authority of the Emergency Coordinator. The use of a Human Clearance, as delineated by this procedure, may be used to perform any activity deemed necessary to protect plant critical equipment, plant personnel or the health and safety of the general public.

Question 77, RO Exam Comment:

One'of the criteria for RCS Heat Removal safety function is Tavg between 525' and 535;F. If a calculation is performed using the numbers in distractor A, RCS Tavg would be 544.5' and would not meet RCS Heat Removal safety function.

Recommendation:

Accept A and D

Reference:

'1-EOP-01, "Standard Post Trip Actions" Did not calculate Tavg in distractor A during validation and review, assumed loop delta T was the information in that distractor.

USNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 77 The Unit 2 reactor has tripped from 50% power and SPTAs are in progress. The RO reports that RCS Heat Removal safety function is not being met. Which of the following conditions is the reason for the ROs report? (Assume no contingency actions have been taken. Consider each case independently)

a. RCS hot leg temperatures are 562'F, RCS cold leg temperatures are 527'F.
b. Steam Generator pressures 935 psia.
c. RCS average temperature is 527'F.

d.. Steam Generator levels are 37% WR with 1 Main Feedwater pump supplying feed.

77

REVISION NO.: PROCEDURE TITLE: PAGE:

13A STANDARD POST TRIP ACTIONS PROCEDURE No.:

EMERGENCY OPERATING PROCEDURE 12 of 21 1-EOP-01 ST. LUCIE UNIT 1 5.'0 OPERATOR ACTIONS: (continued)

RCS HEAT REMOVAL INSTRUCTIONS CONTINGENCY ACTIONS Cl 6. Verify RCS Heat Removal by 6. If RCS Heat Removal is NOT the following: being maintained, Then do the following as necessary:

A. At least one S/G with level greater than 40% (wide A. Ensure Auxiliary Feedwater range) and main'eedwater flow after AFAS time delay.

available.

B. If all feedwater has been AND stopped, Then do NOT exceed a flow rate of B. RCS T-avg is between or . 150 gpm per S/G for trending to 525 F and 5 minutes.

535'F.

C. If A or B AFW Pump is the AND only source of feedwater, Then do the following:

C. Steam Generator pressure is between 750 and 950 psia. 1 ~ STOP one RCP in, each loop AND AND D: The four "MSR TCV Block Valves" are CLOSED: 2. INITIATEseal injection 'o the RCPs if available:

MV-084 MV-08-8 MV-08-6 MV-08-10 a. ENSURE Charging flow is available.

b. OPEN MV-02-1, RCP Seal Injection (Isolation).

(Continued on Next Page)

REVISION NO.: PROCEDURETITLE: PAGE:

13A STANDARD POST TRIP ACTIONS PROCEDURE NO.:

EMERGENCY OPERATING PROCEDURE 13 of21 1-EOP-01 ST. LUCIE UNIT 1 '.0 OPERATOR ACTIONS: (continued)'

RCS HEAT REMOVAL INSTRUCTIONS CONTINGENCY ACTIONS

6. 6. (continued)

D. If Main or Auxiliary Feedwater flow can NOT be reestablished, Then:

1. STOP one RCP in each loop AND
2. INITIATEseal injection to the RCPs if available;
a. Ensure Charging flow is available.
b. OPEN MV-02-1, "RCP Seal Injection (Isolation)."

E, If RCS T-avg is greater than 535'F, Then do the following:

1 ~ Ensure Main or Auxiliary Feedwater is controlling or restoring level to at least one S/G.

2. Operate SBCS to control RCS T-avg between 525'F and 535'F.

(Continued on Next Page)

t

~ > ~

Question 88, RO Exam Comment:

Resetting AFW could be confused with placing the AFW system back to its normal configuration (standby lineup) following AFAS reset. In this case, the AB bypass switch would be used to close the 1C AFW pump steam admission valves.

Recommendation:

Accept A and C

Reference:

OP 1-0700022; "Auxiliary Feedwater - Normal Operation" Missed interpretation of what resetting means during validation and review.

USNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 88 Which of the following EOP directed evolutions would warrant the use of the "AB" bypass switch on, the Unit 1 Auxiliary Feedwater System (AFW) portion of RTGB 102?

(Assume all plant equipment operable)

a. Resetting AFW after steam generator levels have reached the AFAS reset level.

'b. Manual initiation of AFAS after lockout when cooling down with an isolated steam generator.

c. Isolation of a steam generator when performing 1-EOP-99, Appendix R.
d. Placing the AFW system in service manually after a trip from low power and steam generator levels did not reach AFAS actuation setpoint.

88

Page 8 of 8 ST. LUCIE UNIT 1 OPERATING PROCEDURE NO. 1-0700022, REVISION 40 AUXILIARYFEEDWATER - NORMAL OPERATION

8.0 INSTRUCTIONS

(continued) 8.1 (continued)

8. To terminate flow to the 1A Steam Generator from the 1B AFW pump.

A. Close MV-09-9, 1A AFW Pump to 1A S/G.

B. Close MV-09-14, 1B AFW Pump disch to 1A S/G.

C. Close MV-09-13, 1A AFW Pump disch to 1B S/G.

9. To secure the 1C AFW pump following use:

A. Close MV-09-11, 1C AFW Pump disch to 1A S/G, or MV-09-12, 1C AFW Pump disch to 1B S/G, verify zero (0) gpm flow on FI-09-7C.

B. Manually trip the 1C AFW pump locally by using overspeed trip lever on MV-08-3.

C. Place the key in the AFAS AB bypass keyswitch and position the switch to BYPASS.

D. Using the AFW pump 1C control switch, CLOSE steam admission valve MV-08-13, 1A S/G steam to 1C AFW Pump, or MV-08-14, 1B S/G steam to 1C AFW Pump, by placing switch in STOP.

E. Reset the manual overspeed trip locally and verify MV-08-3 is ready for operation.

F. Place the AFAS AB bypass keyswitch in NORMAL.

G. Ensure HC-09-1C, 1C AFW Pump Speed Control, is set at 100% on indicator.

Question 98, RO Exam Comment:

Correct setpoint for opening Containment Vacuum Breakers is -2.5" hg containment to annulus differential pressure. The answer does not indicate a negative value.

Recommendation:

Delete question 98

Reference:

2-ARP-01-T1, "Annunciator Response Procedure", 0711602, "Containment Ventilation Systems""

Typos in the question were not picked up in validation and review and caused misinterpretation.

I

/

USNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 98 Which of the following conditions would cause FCV-15-7 and FCV-25-8 (containment vacuum relief valves) to open'P (Assume all plant equipment operating properly)

a. During a surveillance run of the Shield Building Ventilation System, annulus to containment hP reaches 4" H,O.
b. Instrument air to FCV-1 5-7 and FCV-1 5-8 accumulators has been isolated.
c. An inadvertent Containment Spray actuation during normal operations has occurred and containment to annulus b,P reaches 3" H,O.
d. 125 V DC power to to FCV-15-7 and FCV-15-8 solenoid valves has been de-energized.

98

REVISION: PROCEOURE TITLE: PANEL:,, ~

0 ANNUNCIATOR RESPONSE PROCEDURE PROCEOURE NO: WINDOW: j, 2-ARP-01-T1 ST. LUCIE UNIT 2 i'I ANNUNCIATOR PANEL T 2 3 4 5 6 CNTMT.

7 8 9 10 11 12 TO ANNULUS 13 14 15 16 17 18 b,P 19 20 21 22 23 24 HIGH DEVICE: LOCATION: SETPOINT:

63XA1 HVCB De-energized PDIS-25-11A RAB/24/S-RA1 Z/ W-RAE -9 in. H,O rising 63XB1 HVCB De-energized PDIS-25-1 1B RAB/24/ S-RA1 Z/E-RAG -9 in. H,O rising ALARMCONFIRMATION:

1. PDIS-25-1A, Cntmt To Annulus Diff Press, indicates -9 in. H,O rising.
2. PDIS-25-1B, Cntmt To Annulus Diff Press, indicates -9 in. H,O rising.
3. PDIS-25-11A, Cntmt To Annulus Diff Press, indicates -9 in. H,O rising.
4. PDIS-25-11B, Cntmt To Annulus Diff Press, indicates -9 in. H,O rising.
5. If Containment Purge was in progress, the following is indicated:

~ 2-HVE-8A and 2-HVE-SB, Containment Purge Fans, indicate STOPPED.

~ FCV-25-7 and FCV-25-8, Containment Vacuum Reliefs, indicate OPEN.

~ FCV-25-1, 2 and 3, Containment Purge Inlet Valves, indicate OPEN.

OPERATOR ACTIONS:

1. If Containment Purge Fans are running, Then STOP the running fan:

~ 2-HVE-SA, Containment Purge Exhaust Fan.

~ 2-HVE-SB, Containment Purge Exhaust Fan.

2. If Containment Vacuum Reliefs are closed, Then at the direction of the ANPS, OPEN the valves manually:

~ FCV-25-7, Containment Vacuum Relief.

~ FCV-25-8, Containment Vacuum Relief.

CAUSES: This annunciator may be caused by failure of the purge inlet dampers to open, failure of the containment vacuum relief valves to open, or a misaligned valve lineup.

REFERENCES:

1. CWD 2998-B-327 sheets 482, 509, 510, 529 and 1146
2. P8 IDs 2998-G-862 and 8770-G-878
3. TEDB

I

'he fans are controlled by STOP/START switches that spring return to neutral (auto) on RTGB 106 [HVCB]. When the switch is taken to START, exhaust butterfly valves FCV-25-4, 5 and 6 open and, through valve limit switches, the fan is started when the dampers have all complete opened. In neutral after stop, the fan is in standby; it will start on a low flow condition at the outlet of running fan. The fan inlet dampers are automatically opened on a fan start signal and automatically close down a fan stop signal. The purge fans are interlocked to trip on a high containment to outside differential pressure of -4.0" water gage. Ten seconds after a low flow condition or motor overload the standby fan starts and actuates the CONTAINMENT PURGE HVE-8A(B) LOW FLOW MOTOR OVERLOAD alarm on RTGB 106 [HVCB].

VACUUM REUEF SYSTEM The vacuum relief system's function is to protect the containment vessel against insufficient internal pressure. The design basis for the vacuum relief system is the accidental initiation of the containment spray system (both pumps) while all four containment fan coolers are in operation and the containment is at its maximum normal operating temperature of 120'F. The containment spray pumps are assumed to reach full flow instantaneously, the initial humidity is assumed to be 40%, and one of the two redundant vacuum relief systems is assumed to be inoperable.

The vacuum relief system performs its function by two independent vacuum relief lines each sized to prevent the*differential pressure between the containment and the shield building from exceeding the design value of 0.7 psid. Pjgg~r shows the vacuum relief system.'ach vacuum relief system consists of a check valve (V-25-20 and 21) inside containment and an automatic air-operated butterfly valve (FCV-25-7 and 8) outside of containment.

Actuation of the butterfly valve is controlled by the differential pressure between the shield building annulus and the containment. Differential pressure transmitters provide signals to the pilot solenoid to open the air-operated butterfly valve. The vacuum breaker check valve is balanced to open at 1.1" water gage differential and the butterfly valve is set to open at a differential pressure of 2.5" water gage. Power to the control circuits of each automatic butterfly valve is. provided from a separate emergency 125 VDC bus.

0711602, Rev. 9 12 FOR TRAINING USE ONLY

Since the vacuum relief valves also perform a containment isolation function in the event of a I OCA, the automatic butterfly valves have been designed to fail closed..A Seismic Class I air accumulator is provided to ensure a reliable energy source for the operation of each valve. Each accumulator is sized to allow three cycles of operation of its associated valve. The Seismic Class I air'upply is isolated from the normal non-Seismic Class I air supply system by a set of check valves which will prevent a loss of air from the accumulator in the event of a failure of the non-Seismic Class I system. The REACTOR CONTAINMENT VACUUM RELIEF FCV-25-7 (8) ACCUMULATOR LOW AIR PRESSURE alarms on RTGB 106 [HVCB], annunciators P-11 (P-21)

[T-7 (T-8)], are provided by PS-25-12A and PS-25-12B at 70 [80] psig.

Other instrumentation and controls associated with the vacuum relief system are detailed as follows and are shown on ~Fi ~~r

1. Open and closed indication for FCV-25-7 and 8 on RTGB 106 [HVCB].
2. PDIS-25-1A (for FCV-25-7) and PDIS-25-1 B (for FCV-25-8) provide differential pressure indication on RTGB 106 [HVCB] and modulating signals for the vacuum relief valves.
3. -

PDS-25-1 3A (for FCV-25-7) and PDS-25-13B (for FCV-25-8) provide redundant modulating signals for the vacuum relief valves.

4. PDIS-25-11A (for FCV-25-7) and PDIS-25-11B (for FCV-25-8) provide local containment to annulus differential pressure indication and REACTOR CONTAINMENT VACUUM HIGH pressure alarms on RTGB 106 [HVCB] at -4.0 [-9.0] inches water gage.

0711602, Rev. 9 13 FOR TRAINING USE ONLY

NRC RESOLUTION OF FACILITYRECOMMENDATIONS Question ¹ 22 RO/SRO:

Recommendation accepted. The additional answer is essentially correct when considering late entries. Based on the additional information provided, both answers A and C will be allowed for full credit.

Question ¹ 23 RO/SRO:

Recommendation NOT accepted. The additional answer fs a subsequent action completed after the automatic incorporation of the procedural change.

Question ¹ 47 RO/SRO:

Recommendation NOT accepted. The additional answer is not allowed because the candidate's should have known that the loss of Fire and Security Sups would loose power to the PC-11 computer, resulting in a loss of secondary sampling. Primary sampling is done normally done manually.

Question ¹ 69 RO/SRO:

Recommendation NOT accepted. Even though the conditions proposed in the initial conditions are not procedurally allowable, those were the conditions that the plant was hypothesized to-be in. The additional answer is NOT procedurally allowable, in that; there is no synch switch that would allow the paralleling of these two machines through TCB-9. The only way to recover from the conditions proposed was first to secure one of the MG sets.

Question ¹ 61 RO/SRO:

Recommendation accepted. Based on the additional information provided by the licensee that there is no correct answer, the question will be deleted.

Question ¹ 66 RO/SRO:

Recommendation NOT accepted. ADM-09.04, In-plant Equipment Clearance Orders, states in g1.2 that "During declared plant emergencies (activation of the St. Lucie Plant Radiological Emergency Plan), Re-entry Teams are dispatched under the authority of the Emergency Coordinator. The use of a Human clearance, as delineated'by this procedure, may be used to perform any activity deem necessary to protect plant critical equipment, plant personnel or the health or safety of the general public." The initial conditions in the stem of the question state that an instrument air leak occurred and was isolated with a single isolation valve. The stem of the question does NOT provide a basis for the urgency stated in the administrative procedure.

Enclosure 4

Question ¹ 77 RO ONLY:

Recommendation accepted. Based on the additional information provided by the licensee both A and D will be accepted for full credit.

Question ¹ 88 RO ONLY:

Recommendation NOT accepted. The stem of the question speaks to an "EOP directed evolution..." Distractor A is comprised of actions provided in Auxiliary Feed Water Normal Operating Procedure, OP-1-0700022. During the performance of an EOP you would not place the Auxiliary Feed Water system in a normal standby lineup as described in this procedure.

Question ¹ 98 RO ONLY:

Recommendation accepted. Based on additional information provided by the licensee, the numerous typographical errors and the incorrect lesson plan this question will be deleted.

Enclosure 4

U.S. Nuclear Regulatory Commission Site-Specific Wriffen Examination A licant Information Name: Re ion: II Date: Facilit /Unit: St. Lucie 1/2 License Level: SRO Reactor T e: CE Start Time: Finish Time:

Instructions Use the answer sheets provided to document your answers. Staple this cover sheet on top of the answer sheets. The passing grade requires a final grade of at least 80.00 percent. Examination papers will be collected four hours after the examination starts.

Applicant Certification All work done on this examination is my own. I have neither given nor received aid.

A licant's Si nature Results Examination Value Points Applicant's Score Points Applicant's Grade Percent

NRC RULES'AND GUIDELINES FOR WRITl EN EXAMINATIONS During the administration of this exam, the following rules apply:

PA A- RA ID INE

1. Cheating on any part of the examination will result in a denial of your application and/or action against your license.

If you have any questions concerning the administration of any part of the examination, do not hesitate asking them prior to starting that part of the test.

3. SRO applicants will be tested at the level of responsibility of the senior shift position (Ie.

NPS, ANPS)

4. You must pass every part of the examination to receive a license or to continue performing license duties.
5. The NRC examiner is not allowed to reveal the results of any part of the examination uritil they have been reviewed and approved by NRC management. Grades provided by the facility licensee are preliminary until approved by the NRC. You will be informed of the official examination results about 30 days after all examinations are complete.

ART B-W ITT N XAMIN N ID E

1. After you complete the examination, sign the statement on the cover sheet indicating that the work was your own and you have not received or given assistance in completing the examination.

To pass the examination, you must achieve a grade of 80 percent or greater. Every question is worth one point.

r For initial examinations, the time, limit for completing the examination is FOUR hours.

You may bring pens, calculators or slide rules into the examination room. Use only black ink to ensure legible copies.

5. Print your name in the blank provided on the examination cover sheet and answer sheet. You may be asked to provide the examiner with some form of positive identification.

Mark your answers on the answer sheet provided and do not leave any question blank.

Use only the answer sheet provided and do not write on the back side of the pages. If you decide to change your original answer, draw a single line through the error, enter the desired answer, and initial the change.

0 0

7. If the intent of the question is unclear, ask questions, of the examiner only.
8. Restroom trips are permitted, but only one applicant at a time will be permitted to leave.

Avoid all contact with anyone outside the examination room to eliminate the appearance or possibility of cheating.

9. When you complete the examination, assemble a package including the examination questions, examination aids, answer sheets and scrap paper and give it to the proctor.

Remember to sign the statement on the cover sheet indicating that the work was your own and you have not received or given'assistance in completing the examination. The scrap paper will be disposed of immediately after the examination.

10. After you have turned in your examination, leave the examination area as defined by the proctor. If you are found in this area while the examination is still in progress, your

'icense may be denied or revoked.

, 11. Do you have any questions'

USNRC SENIOR REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 1 Unit 1 is in mode 6. The NPS has suspended fuel movement due to a Tech Spec LCO violation. Which of the following conditions has caused fuel movement to be suspended?

Less than two (2):

a. - Wide Range Log Safety Channels operable.
b. Appendix R Neutron monitors operable.
c. Linear Range Safety Channels operable.

d.. Startup Range Neutron monitors operable.

USNRC SENIOR REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 2 The following conditions exist:

Unit 2 has tripped from 100% power due to a LOOP 2A Emergency Diesel has failed to start CEAs 42 and 39 aie indicating UEL The ANPS directs the RO to perform an emergency boration 2B charging pump is running Which one of the following statements describes the correct operator actions?

a. Start 2B BAMT Pump, open V2514 (Emergency Borate Valve).
b. Hold close V2501(VCT Outlet Valve), hold open V2504 (RWT Makeup Valve).
c. Start 2B BAMT Pump, open V2508 or V2509 (Gravity Feed Valves):
d. Open V2508 or V2509 (Gravity Feed Valves), ensure closed V2501(VCT Outlet Valve).

USNRC SENIOR REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 3 While operating in MODE 5 with the pressurizer solid and the RCS in an isothermal condition at 150', RCS pressure rapidly increases. Which one of the following could cause this pressure increase?

a. Letdown pressure control valve diaphragm ruptures
b. Pressurizer heaters energize
c. Shutdown cooling flow is increased
d. Letdown level control valve setpoint is increased

USNRC SENIOR REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 4 The following conditions. exist:

A total loss of feedwater event has occurred on Unit 1 S/G levels are 14% on wide range indication The control room crew has exited EOP-6 and entered EOP-15,"RCS and Core Heat Removal", Success Path 4, "Once through Cooling" After Once through Cooling has been initiated, which one of the following is the correct action by the control room crew?

a. Implement EOP-6 and continue with feedwater restoration.
b. Implement in EOP-15 starting at step 1.
c. Remain in Success Path 4 until feed is recovered.
d. Implement EOP-3, RCS inventory is now decreasing.

USNRC SENIOR REACTOR OPERATOR INITIALLICENSE EXAILIIINATION QUESTION 5 The following conditions exist:

1B Steam Generator has been diagnosed with a tube rupture An RCS cooldown to 523'F Thot is completed 1B Steam Generator has been isolated per 1-EOP-99, Appendix R All RCPs are off With cooldown in progress for an additional 30 minutes, which one of the following RCS Thot temperatures is correct if the maximum recommended cooldown rate is utilized?

a. 473 'F
b. 485.5 'F
c. 498 'F
d. 508 'F

USNRC SENIOR REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 6 Due to a condenser tube leak, The ANPS has directed entry into 1-0NP-22.01, "Rapid Downpower", and has directed the ROs to commence a downpower at 30 MW/minute, and maintain Tavg within 6.6'F of Tref. Which one of the following is the procedurally

~

correct method of reducing RCS Tavg.? (Assume one BAM pump running)

a. Open Boric Acid Load Control Valve V2525; cycle the running BAM pump.
b. Open Emergency Borate Valve V2514; cycle V-2514.

P

c. Open Boric Acid Load Control Valve V2525; cycle V2525.
d. Open Emergency Borate Valve V2514; cycle the running BAM pump.

USNRC SENIOR REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 7 A large instrument air leak has occurred on Unit 1. As PCV-1 8-5 (Unit 2 to Unit 1 Instrument Air Crosstie) is stroking open, it becomes mechanically bound in the, full open position. Assuming no'operator action, which one of the following statements correctly describes the system response?

a. Unit 1 (PCV-18-6) crosstie will automatically close at 85 psig decreasing,

.isolating instrument air to Unit 2.

b. Unit 2 instrument air depressurization is prevented by a check valve located in the crosstie line.
c. Unit 1 station to instrument air crosstie will automatically open at 85 psig decreasing to supply compressed air to Unit 1.
d. Unit 2'instrument air system will depressurize as Unit 1 instrument air system depressurizes.

USNRC SENIOR REACTOR'OPERATOR INITIALLICENSE EXAMINATION QUESTION 8'nit 2 is at 100% power, 2A charging pump was running with 2B charging pump selected as backup. 2A charging pump tripped due to a faulty breaker. The following conditions now exist:

2B charging pump was started to replace 2A charging pump 2A charging pump control switch was placed in the "OFF" position No other switch manipulations were made If pressurizer level setpoint is increased to 69%, which of the following is a correct description of the current CVCS configuration?

a. 2B charging pump running with no change in letdown flow.
b. 2B and 2C charging pumps running with minimum letdown flow.
c. 2B charging pump running with minimum letdown flow.
d. 2B and 2C charging pumps running with no change in letdown flow.

USNRC SENIOR REACTOR'OPERATOR INITIALLICENSE EXAMINATION QUESTION 9 Unit 2 ROs have just performed a shutdown of the reactor and turbine due to lower and middle seal failures on the 2B1 Reactor Coolant Pump. After the 2B1 RCP was stopped, the upper seal also failed. Which of the following describes the flowpath of controlled bteedotf from the 211 RCP ~eth'e 'me?

2B1 RCP controlled bleedoff:

a. has been directed to the floor drains.
b. is being directed to the Volume Control Tank.
c. is being directed to the Quench Tank.
d. has been isolated.

USNRC SENIOR REACTOR OPERATOR INITIALLICENSE EXAMINATION QUEST(ON 10 2-EOP-6, "Total Loss of Feed" addresses the use of a Condensate pump to establish feed to the steam generators if certain conditions are met. Which one of the following situations would warrant the use of a Condensate pump?

a. A loss of both non-vital 4160 KV busses has occurred and steam generator pressures are 600 psig.
b. A trip from 80% power has occurred and Steam Generator levels are 45%

wide range.

c. A trip from 30% power has occurred and Steam Generator levels are 35%

narrow range.

d. Steam Generator levels are 25% wide range and steam generator pressures are 650 psig.

10

VSNRC SENIOR REACTOR OPERATOR INITIALLICENSE EXAMINATION QVESTION 11 Unit 2 is performing a rapid unit shutdown due to a Steam Generator tube leak on the 2A Steam Generator. According to ONOP 2-0800030, "Steam Generator Tube Leak",

under what conditions would the ROs be required to trip the reactor and turbine?

a. Three of four TM/LP pretrips are in alarm on the RPS.
b. Pressurizer level cannot be maintained with 28 gpm letdown and all available charging pumps running.

c The difference between actual Pressurizer level and Pressurizer level setpoint exceeds 6.6%.

d. Pressurizer level cannot be maintained with V-2522 closed and all available charging pumps running.

11

USNRC SENIOR REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 12 The Unit 2 CCW Radiation Monitor has gone into an alarm condition. Further investigation revealed the solenoid flow control valve closed and isolated flow. Which of the following has occurred at the CCW Radiation Monitor and is the probable cause of this condition?

a. Low CCW flow.
b. High CCW radiation.
c. Low CCW pressure.
d. High CCW temperature.

12

USNRC SENIOR REACTOR OPERATOR INITIALLICENSE EXAMINATION QUEST(ON 13 Unit 1 is at 100% power, steady state. 1A and 1B steam generator pressures are at 890 psig. If a main steam leak inside containment were to occur, which of the following is the minimum value that 1A steam generator pressure would have to change to cause a reactor trip strictly on steam generator parameters?

a. 13%

b 15%

c. 30%

d 33%

13

USNRC SENIOR REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 14 The following Unit 2 conditions exist CCW surge tank Lo-Lo level switch (LS-14-6A) is valved out for replacement All "N" header valves are OPEN 2A CCW pump develops a large discharge flange leak The leak exceeds the capacity of makeup flow Assuming no operator action, which of the following correctly describes FIRST response of the system?

r

a. "A" side N header valves (HCV-14-8A and HCV-14-9) close.
b. 2A CCW pump trips on low suction pressure.
c. "B" side N header valves (HCV-14-8B and HCV-14-10) close.

r

d. 2A CCW pump cavitates.

14

USNRC SENIOR REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 15 The following conditions exist:

Unit 2 is at 100% power Charging and letdown are in normal configuration Regen HX inlet pressure is 2250 Regen HX outlet pressure is 2200 If a 10 gpm leak occurs in the letdown line downstream of the regenerative heat exchanger, which one of the following indications will occur as a result of the leak?

(assume system in auto)

Indicated letdown flow:

a. will decrease due to LCV-2110P closing.
b. will isolate due to V-2516 closing.
c. will increase due to LCV-2110P opening.
d. will isolate due to V-2515 closing.

15

USNRC SENIOR REACTOR OPERATOR INITIALLICENSE EXAMINATION

,, QUESTION 16 The following conditions exist:

Unit 1 is at 100% power

¹ Linear Range Control Channel 9 is out of service for IRC repair

¹ Linear Range Channel 10 is supplying the RPS Power Ratio Calculator Which of the following would be the system response if Channel 10 upper detector failed high?

a. ASI as indicated on the Power Ratio Recorder would violate the negative setpoint, an alarm would be generated.
b. The lower setpoint for ASI as indicated on the Power Ratio Recorder would become more negative, no alarm'would be generated.
c. ASI as indicated on the Power Ratio Recorder would violate the positive.

setpoint, an alarm would be generated.

d. The upper setpoint for ASI as indicated on the Power Ratio Recorder would become more positive, no alarm would be generated.

16

USNRC SENIOR REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 17 The 1B 125 VDC bus has been (ost due to a wiring fault. The control room crew is carrying out the actions of ONOP 1-0030136, "Loss of a Safety Related D.C. Bus". The ANPS has directed the ROs to align the 1B 125 VDC bus to the 1D 125 VDC non-safety bus. Which of the following statements correctly describes the process of bus alignment?

a. The 18 125 VDC bus can be faded'rec from the 1D 125 VDC bus by aligning the keyswitches on RTGB 101.
b. The 1B 125 VDC bus can be fed from the 1D 125 VDC bus ~ouch the 1AB 125 VDC bus only by unlocking and aligning local breakers.
c. The18125VDC buscanbefed~directt fromthe1D125VDC bus by unlocking and aligning local breakers.

.d. The 1B 125 VDC bus can be fed from the 1D 125 VDC bus ptlou~ the 1AB 125 VDC bus only by aligning the keyswitches on RTGB 101.

USNRC SENIOR REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 18 Unit 2 is at 100% steady state power. Annunciator B-13, "2A2 4.16 KV b, Current Trip" has just gone into alarm., Which one of the following correctly describes the effect of this condition on the 2A Emergency Diesel Generator?

The 2A Emergency Diesel Generator:

a. starts, but does not load on the 2A3 bus.
b. does not start. It will only start on 2A3 bus undervoltage.
c. starts and loads on the 2A3 bus.
d. does not start, but will start and load on the 2A3 bus when the bus lockout relay is reset.

USNRC SENIOR REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 19 The following conditions exist:

Unit 1 is at 20% power, returning from a refueling outage, turbine on hold MTC is+1 pcmPF The RO places steam generator blowdown in service at 120 gpm/SG Which of the following describes the immediate plant response to this evolution?

Assume no operator action.

a. Reactor power increases, letdown flow increases, feedwater flow increasesY
b. Reactor power decreases, letdown flow increases, feedwater flow decreases Reactor power increases, letdown flow decreases, feedwater flow decreases
d. Reactor power decreases, letdown flow decreases, feedwater flow increases 19

0 USNRC SENIOR REACTOR OPERATOR INITIALLICENSE EXANIINATION QUESTION 20 Unit 1 is in Mode 1, 100% power. The SNPO is preparing the 18 Containment Spray Pump for its quarterly surveillance run. Which of the following correctly describes an additional manipulation that the SNPO must perform on Unit 1 but not on Unit 2?

a. Open the CCW isolation valve to the 18 Containment Spray pump seal heat exchanger.
b. Open 18 Containment Spray pump manual recirc valves.
c. Close MV-07-38, 8 CS Header Isolation.
d. Close the Sodium Hydroxide tank vent to atmosphere.

F 20

USNRC SENIOR REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 21 The following conditions exist:

A large break LOCA has occurred on Unit 1 1-EOP-03, "Loss of Coolant Accident" is being implemente'd'ydrogen Analyzers initially indicated 0.7%

Hydrogen concentration has increased another 2.6% since the initial reading No equipment is out of service Which of the following actions are required to satify the Containment Combustible Gas Control safety function of 1-EOP-03?

a. Ensure both Hydrogen Recombiners and Containment Spray in service.

,b. Ensure the Hydrogen Purge System in service.

c. Ensure both Hydrogen Recombiners and Hydrogen Purge System in service.
d. Ensure both Hydrogen Recombiners in service.

21

0 USNRC SENIOR REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 22 Unit 1 has tripped from 100% power due to a feedwater problem. According to AP-0010120, "Conduct of Operations", which of the following is the approved method of.

chronological log entries during this event?

a.. The events can be reconstructed at a later time using all available references, but must be made in chronological order when making an entry.

b. The desk RO will record all events in the RCO chronological log as they occur, after performing SPTAs.
c. The events can be reconstructed at a later time using all available references, chronological order is desired but not necessary when making an entry.
d. A designated person, preferably the STA, will record all events in the .

RCO chronological log as they occur.

22

P USNRC SENIOR REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 23 The Unit 1 SNPO was in the process of performing a valve lineup when he discovered an incorrect valve number and valve position. To correct this condition, he generated a temporary change (TC) to the procedure IAW ADM-11.03, "Temporary Change to Procedures". Which of the following describes the status of the TC, ninety five days later, assuming no action was taken by the originator?

The Temporary Change:

a. was automatically canceled after 90 days.
b. still exists in the TC log.
c. was canceled after the valve lineup was performed.
d. was automatically incorporated into the procedure.

23

USNRC SENIOR REACTOR. OPERATOR INITIALLICENSE EXAMINATION QUEST(ON 24 The 1B CVCS lon Exchanger has been placed in service following resin replacement.

Although the RO rinsed the ion exchanger for 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, after 10 minutes of in-service time, the following conditions exist:

RCS Tcold 548.9 Reactor Power 100.6%

According to AP 0010120, Conduct of Operations", which of the following is the correct action to be taken by the control room crew?

a. Immediately implement ONOP 1-0250030, "Emergency Boration".
b. Reduce reactor power to < 100% within 15 minutes.
c. ~

Reduce reactor power to < 100% within 30 minutes.

d. Trip the Reactor and Turbine.

24

USNRC SENIOR REACTOR OPERATOR INITIALLICENSE EXAMINATION QUEST(ON 25 For entry into a VERY HIGH RADIATIONAREA, which of the following correctly describes all requirements that must be met?

a. Continuous HP coverage, a high range dosimeter, HP department head approval, NPS approval: .
b. A specific RWP, continuous HP coverage, HP department head approval, NPS. approval.
c. A specific RWP, a hand held survey instrument, a high range dosimeter, HP department head approval.
d. Continuous HP coverage, a hand held survey instrument, HP department head approval, NPS approval.

25

USNRC SENIOR REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 26 Unit 2 tripped from 100% power. Reactor power is 5X1 0~% as indicated on Wide Range Instrumentation. Which of the following correctly describes the status of the Nuclear Startup Channels at this time?

The Startup Channels:

a. are energized. They automatically energize at 10~% power.
b. are not energized. They will energize if the switches are placed in "on".
c. are energized. They automatically energize on the reactor trip signal.
d. are not energized. They will not energize if the switches are placed in Ilonll 26

USNRC SENIOR REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 27 The following conditions exist:

Unit 2 is at 100% power An electrician, performing a surveillance, de-energizes the 283 4.16 KV bus The 28 EDG successfully starts and toads All plant equipment is operable Assuming no operator action aside from resetting individual pressurizer heater banks on RTGB 203, which of the following correctly describes the TOTAL pressurizer heater availability at this time?

a. Two proportional banks, six backup banks
b. One proportional bank, three backup banks
c. One proportional bank, four backup banks
d. Two proportional banks, four backup banks 27

- USNRC SENIOR REACTOR OPERATOR INITIALLICENSE EXAMINATION QUEST(ON 28 2A steam generator pressure safety channel A has failed low. 2B steam generator pressure safety channel A is normal. Which of the following correctly describes plant response if 2B steam generator pressure safety channel D were to fail low?

a. RPS reactor trip only
b. RPS reactor trip and ESFAS actuation
c. ESFAS actuation only
d. No RPS reactor trip or ESFAS actuation 28

USNRC SENIOR REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 29 The bistable for RCS Low Flow reactor trip has been removed from RPS channel "D" for 18C work. Which one of the following conditions would cause a reactor trip on RCS Low Flow with the RPS in its current configuration?

~ .

a. "A" channel Reactor Coolant Pump differential pressure (PDT 1110 8 1112) de-energizes.
b. "A channel Steam Generator differential pressure (PDT 1111 8 1121) fails low.
c. "A" channel Reactor Coolant Pump differential pressure (PDT 1110 8 1112) instrument tap develops a leak.
d. "A" channel Core differential pressure (PDT 1124W 8 1124Z) de-energizes.

'9

SENIOR REACTOR OPERATOR INITIALLICENSE EXAMINATION I'SNRC QUESTION 30 Unit 2 was at 100% power when a Loss of Offsite Power/SIAS occurred. Which of the following correctly describes the configuration of the Containment Cooling System after both Emergency Diesel Generators start and load on their respective busses?

(Assume all plant equipment in normal configuration prior to the LOOP/SIAS)

a. Four coolers running in fast speed.
b. Three coolers running in slow speed.
c. Four coolers running in slow speed.

Three coolers running in fast speed.

30

USNRC SENIOR REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 31 The following conditions exist:

Unit 2 tripped from 100% power B steam generator narrow range level channel A has faiied tow Auxiliary Feedwater was throttled to 150 gpm / steam generator after AFAS actuation Both steam generator levels are currently 10% narrow range and increasing Which of the following correctly describes the response of the "B" train AFW system if the MB 120 V Instrument Inverter is de-energized and no operator action is taken?

a. At 29% NR indication, AFW flow to the 2B S/G automatically isolates, the header valves must be manually opened to reestablish flow.
b. AFW flow to the 2B S/G remains in service and will continue to fill the 2B S/G.
c. AFW flow to the 2B S/G automatically isolates on Rupture ID due to the failure, AFAS-1 must be manually actuated to reestablish flow.
d. At 29% NR indication, AFW.flow to the 2B S/G automatically Isolates, the header valves automatically re-open at 19.5% NR.

USNRC SENIOR REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 32 Unit 2 was performing a rapid power reduction due to an RCS leak inside containment when the reactor was manually tripped. SIAS actuated 1 minute following the manual trip. SPTAs are in progress and the following conditions exist 12 minutes after trip:

RCS pressure 1200 psia RCS Thot 476'F Pressurizer level 0%

Containment Pressure 2 psig SG levels 43% WR with feed available Which of the following is the correct RCP trip'strategy for the current conditions?

a. Trip all four RCPs
b. Trip one RCP in each loop
c. Leave all four RCPs running
d. Trip one RCP 32

0 USNRC SENIOR REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 33 SE-07-1A, (Iodine Removal System eductor valve) is closed and de-energized for solenoid replacement. Which of the following correctly describes the flowpath of Sodium Hydroxide if a full CSAS occurred with the system in its current configuration'?

Sodium Hydroxide would flow:

a. through+ eductor solenoid valves to the discharge of the 1B Containment Spray Pump.
b. through 1 eductor solenoid valve to the discharge of 1A and 1B Containment Spray Pumps.
c. through 2 eductor solenoid valves to the suction of 1A and! B Containment Spray Pumps.
d. through.1 eductor solenoid valve to the suction of the 1B Containment Spray Pump.

33

r USNRC SENIOR REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 34 The following conditions exist:

Unit 2 is at 100% power The 2A HPSI is being used to fill the 2A2 SIT An electrical fault has caused the 2A3 4.16 KV bus to de-energize r

Which one of the following will occur when the 2A EDG starts and loads on the bus?

The 2A HPSI will:

a. auto sequence onto the bus six seconds after the EDG output breaker closes.

auto sequence onto the bus thirty seconds after the EDG output breaker closes.

c. will not sequence onto the bus and will have to be manually started.
d. loads onto the bus immediately after the EDG output breaker closes.

34

USNRC SENIOR REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 35 Unit 2 is in Mode 6, refueling in progress. A leak has developed in the suction line of the in service Fuel Pool Cooling pump, upstream of the suction isolation valve . Which of the following correctly describes the status of fuel pool water level if no action is taken to isolate the leak?

Fuel pool water level will decrease:

a. to 23 feet above the top of the fuel assemblies.

b, to the bottom of the fuel transfer canal gate.

c. to the bottom of the skimmer suction.
d. to approximately 52 feet.

35

I USNRC SENIOR REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 36 A large ESDE has occurred on Unit 2. The RO, performing safety function status checks for 2-EOP-05, reports that RCS temperature is 350'F and RCS pressure is 1290 psia. The crew should:

a.. secure all running RCPs, initiate seal injection.

b. 'tabilize RCS temperature, depressurize the RCS.
c. reduce RCS temperature to establish 20'F subcooling.
d. stabilize RCS pressure and temperature at current values.

36

USNRC SENIOR REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 37 Which one of the following actions would be permissible according to AP 0010120, "Conduct of Operations" ? (assume all equipment operable)

P

a. Manual initiation of AFAS post reactor trip with SIG levels at 22% NR.
b. Blocking SIAS during a plant shutdown due to a 100 gpm RCS leak inside containment.
c. Blocking MSIS during a plant cooldown due to a 100 gpm SGTR.
d. Manual actuation of SIAS prior to auto actuation due to a 200 gpm LOCA.

/

37

USNRC SENIOR REACTOR OPERATOR INITIALLICENSE EXAMINATION QOESTION 38 Unit 1 is at 100% power, steady state. The 1C 120 VAC Instrument bus becomes de-energized due to an electrical fault. Which of the following correctly describes the status of the Diverse Scram System (DSS) at this time?

a. The MG set input breaker will open if ONE DSS channel becomes actuated.
b. A line contactor will open if TWO DSS channels become actuated.
c. The MG set input breaker will open if TWO DSS channels become actuated.
d. A line contactor will open if ONE DSS channel becomes actuated.

38

0 USNRC SENIOR REACTOR OPERATOR INITIALLICENSE EXAIttIINATION QUESTION 39 The following conditions exist:

Unit 2 is at 100% power, NOP / NOT A steam leak has developed on the 2A main steam line outside containment An RCS leak has developed on the 2A hot leg Which of the following correctly describes the the condition of the steam exiting each leak? (Assume containment pressure is atmospheric)

a. The primary side steam is saturated, the secondary steam is saturated.
b. The secondary steam is superheated, the primary steam is saturated.

f

c. The primary steam is superheated, the secondary steam is superheated:
d. The secondary steam is saturated, the primary steam is superheated.

39

USNRC SENIOR REACTOR'OPERATOR INITIALLICENSE EXAMINATION QUESTION 40 Unit 2 is at 50% power, turbine startup in progress; Which one of the following de-energized CEDM components is the FIRST component to be energized when the RO places the CEA control switch to WITHDRAW?

a. Lift Coil
b. Upper Gripper Coil
c. Load Transfer Coil
d. Lower Gripper Coil 40

USNRC SENIOR REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 41 Which of the following is the method of level indication/annunciation of the Unit 2 reactor cavity sump?

a. Indication is provided by reed switches, annunciation is provided by a bubbler system.
b. Annunciation is provided by a float device, indication is provided by reed switches.
c. Indication is provided by a bubbler system, annunciation is provided by a float device.
d. Annunciation is provided by reed switches, indication is provided by a float device.

41'

USNRC SENIOR REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 42 The following conditions exist:

Unit 2 is in the process of a turbine startup Reactor power is at 10%

The RO is preparing to latch the turbine Valve position limits have been set to "0" Which of the following correctly describes the response of the system when the RO depresses and holds the "Latch" pushbutton on RTGB 201?

h

a. Auto stop oil pressure increases to approximately 100 psig, governor and intercept valves stroke open.
b. DEH supply header pressure increases to approximately 1800 psig, intercept and reheat stop valves stroke open.
c. Auto stop oil pressure increases to approximately 100 psig, intercept.and reheat stop valves stroke open.
d. DEH supply header pressure increases to approximately 1800 and intercept valves stroke open. psig,'overnor 42

USNRC SENIOR REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 43 Unit 1 turbine startup is in progress. The RO is in the process of placing the MSRs in service. Which. of the following describes the system response when the "Ramp" pushbutton on the reheat control panel is depressed?

a. The four MSR TCVs open over a four hour period.
b. The four smaller MSR TCVs open over a two hour period, the four large MSR TCVs open after an additional half hour.

. c. The four MSR TGVs open over a two hour period.

d. The four smaller MSR TCVs open over a four hour period, the four large MSR TCVs open after an additional half hour.

43

USNRC SENIOR REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 44 2A Emergency Diesel Generator has been started and is loaded to the grid for a periodic surveillance run. Which of the following describes the response of the 2A Emergency Diesel Generator if a loss of offsite power occurs during this evolution?

The 2A Emergency Diesel Generator:

a. remains running and carrying the 2A3 4160 V bus loads.
b. trips on overspeed.
c. output breaker opens and re-closes, normally running loads are sequenced on the 2A3 4160 V bus.
d. trips on overcurrent.

44

USNRC SENIOR REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 45 Which of the following plant conditions would present the most significant challenge to shutdown margin requirements during a main steam line rupture?

a. Hot full power, beginning of cycle.
b. Hot zero power, end of cycle.
c. Hot zero power, beginning of cycle.
d. Hot full power, end of cycle.

45

USNRC SENIOR REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 46 The following conditions exist:

A Station Blackout has occurred on Unit 1 2A and 2B Emergency Diesel Generators are available Which of the following describes the preferred method of supplying Unit 1 with 4160V power through the Station Blackout Crosstie?

Crosstie:

a. 2A3 4160V bus with 1B3 4160V bus.
b. 2B3 4160V bus with 183 4160V bus.
c. 2A3 4160V'bus with 1A3 4160V bus.
d. 2B3 4160V bus with 1A3 4160V bus.

46

USNRC SENIOR REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 47 The Unit 2 Fire and Security Sups has been de-energized due to an electrical fault and will remain out of service for 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />. According to 2-ONP-49.01, "Sups - Non Safety'ital AC or Fire and Security Inverter Malfunction", which of the following actions must be performed on Unit 2 that would NOT have to be performed in the same situation on Unit 1?

a. All vital access doors must be posted.
b. Local primary sampling for activity must be performed.
c. Fire watches must be posted.
d. Local secondary sampling for activity must be performed.

47

USNRC SENIOR REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 48 Unit 2 generator output is 485 MW. According to ONOP 2-0610031, "Loss of Condenser Vacuum", which of the following conditions would require an immediate reactor/turbine trip?

a. Condenser backpressure is 2.85 psia.
b. Two circulating water pumps in the same discharge tunnel trip.
c. The differential pressure between A and B condenser is 1.13 psid.
d. Condenser air in leakage is 12 CFM.

48

USNRC SENIOR REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 49 Unit 2 is at 100% power. Due to a power'supply failure, ONE CEA has dropped to the bottom of the core. Which of the following components is de-energized?

(Assume system in normal configuration)

a. Coil Power Programmer
b. Power Switch
c. Hold Bus
d. ACTM module 49

USNRC SENIOR REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 60 Unit 1 was at 100% power when the control room %as evacuated due to a fire in the cable spreading room. Prior to exiting the control room, the operators had time to perform their initial actions. Assuming all appendices of 1-ONP-100.02, "Control Room Inaccessibility" were performed, which one of the following will be AVAILABLEto the RO when he arrives at the HSDCP?

a. Letdown
b. Main spray
c. PORV
d. Aux Spray 50

USNRC SENIOR REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 51 According to 2-EOP-1, "Standard Post Trip Actions", in which of the following situations would it gQT be permissible to initiate seal injection after RCPs are removed from service while in 2-EOP-1?

a. A cooldown has caused RCS Tcold to decrease to 495'f.
b. RCS pressure is at 1290 psia after SIAS with subcooling at 40'f.
c. Main and Auxiliaryfeedwater has been lost and cannot be restored.
d. A valid CCW to RCP trip has actuated and caused the reactor trip.

51

USNRC SENIOR REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 62 Which of the following Inadequate Gore Gooling Monitor (QSPDS) indications would be inaccurate if Reactor Coolant Pumps remained running with the Reactor Vessel Level Monitor reading less than 100'/o?

a. Upper head region level indication.
b. GET saturation margin indication.
c. Plenum region level indication.
d. RGS saturation margin indication.

52

USNRC SENIOR REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 53 The ANPS was in the process of reviewing the RO logs from the previous shift when he

'oticed the following trend on 2A1 RCP lower oil reservoir level:

0900 +3 I I 1200 +2 I I 1500 +1 II Assuming no system leakage, which of the following could be the cause of the 2A1 RCP lower oil reservoir level trend'?

a. Instrument air pressure to the transmitter is increased slightly.
b. A buildup of debris has occurred at the bubbler tube outlet.
c. An I/A leak has developed where the bubbler tube enters the reservoir.
d. Containment pressure has decreased.

I 53

USNRC SENlOR REACTOR OPERATOR lNITIALLlCENSE EXAiIJiiNATION QUEST(ON 54 Unit 1 has just come off line and is in Mode 3. The ANPS has directed the ROs to reduce Tavg to < 500'F. Which of the following parameters was exceeded and is the reason for this Tech Spec required evolution?

a. Primary Chemistry
b. Secondary Activity
c. Primary Activity
d. Secondary Chemistry 54

USNRC SENIOR REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 55 Unit 1 has tripped from 100% power due to a loss of offsite power. Two minutes after the trip, the 18 125 VDC bus becomes de-energized. Which of the following correctly .

describes the auxiliary feedwater configuration ten minutes post trip? (Assume no operator action)

I

a. 1A and 1C AFW pumps running and feeding the 1A steam generator.
b. No AFW pumps running.
c. Only 1A AFW pump running and feeding the 1A steam generator.
d. 1A AFW pump running and feeding the 1A steam generator, 1C AFW pump running and feeding both steam generators.

55

USNRC SENIOR REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 56 A large break LOCA has occurred on Unit 2. The ANPS has directed the RO to make the alignment to pump the safeguard sumps to containment IAW 2-EOP-3, "Loss of

'oolant Accident". Which of the following describes the flowpath of the safeguards sumps after the alignment is made?

The safeguard sump water will be pumped directly to the:

a. reactor drain tank
b. containment sump
c. reactor cavity sump
d. quench tank 56

USNRC SENIOR REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 57 The following conditions exist:

Unit 1 is currently at 80% power VCT level is currently at 42%

A 5 MW/MIN downpower is in progress due,to a 18 gpm RCS leak 2 charging pumps are running with letdown in automatic Due to a malfunction in the Boric Acid Makeup System, the downpower must be performed using 10 gpm of boric acid being supplied via the manual borate valve No other makeup is available VCT level = 33.8 gal./%

If the rate of power reduction and RCS leakage remain constant, at approximately what power level will the RWT, begin to supply the suction of the charging pumps? (assume 10% VCT level decrease due to RCS density change)

a. 5%
b. 16%

c 24%

d. 32%

57

USNRC SENIOR REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 58 The Unit 2 board RO had just assumed the shift and was taking his first set of hourly logs when he noticed Shield Building Exhaust fan HVE-6A running. Which of the following conditions could be the reason for HVE-6A running? (Assume all plant equipment operating properly)

a. High radiation in the fuel pool area.
b. A containment mini purge is in progress.
c. High shield building to containment DP.
d. Failure of the MA channel CIS monitor.

58

USNRC SENIOR REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 59 The following conditions exist:

Motor Generator (MG) set 1A and 1B are running Bus tie breaker (TCB ¹9) is open Reactor Trip breakers 3, 4, 7 and 8 are open (B side)

Reactor Trip breakers 1, 2, 5 and 6 are closed (A side)

Which of the following is correct concerning the closure of the reactor trip breakers 3, 4 7 and 8 by the RO?

The operator:

a. may close the reactor trip breakers in any combination at any time.
b. must close the bus tie breaker prior to closing the reactor trip breakers.
c. must ensure one MG set is taken out of service prior to closing the reactor trip breakers.
d. must synchronize 1A and 1B MG sets with the. bus tie breaker open prior to closure of the reactor trip breakers.

59

USNRC SENIOR REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 60 According to ONOP 2-0530030, "Waste Gas System", which of the following correctly describes the immediate operator actions concerning the combination of hydrogen and oxygen in the waste gas decay tanks?

If the in-service gas decay tank:

a. hydrogen concentration exceeds 4% and the oxygen concentration exceeds 2%, immediately admit nitrogen to reduce the oxygen concentration to within limits.

b oxygen concentration exceeds 4% and the hydrogen concentration exceeds 2%, immediately admit nitrogen to reduce the oxygen concentration to within limits.

c. hydrogen concentration exceeds 4% and the oxygen concentration exceeds 2%, immediately admit nitrogen to reduce the hydrogen concentration to within limits.
d. oxygen concentration exceeds 4% and the hydrogen concentration exceeds 2%, immediately admit nitrogen to reduce the hydrogen concentration to within limits.

60

USNRC SENIOR REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 61 The following conditions exist:

Unit 2 is at 50% power, all equipment operable A targe, unisolable instrument air leak occur The operators manually trip the reactor when I/A pressure reaches 50 pslg Which of the following correctly describes Steam Generator water level trends and the reason for the trends immediately following the tnp? (Assume no operator action)

Steam Generator levels will increase to approximately 80% NR, then decrease atter the main feed reg valves close.

0 decrease due to ain feed isolation valves failing closed.

c. increase~ o solid conditions due to no response from the main feedwater control~system.
d. decrease to normal post trip values as 15% bypass valves establish 5%

feed flow to each Steam Generator.

61

\

USNRC SENIOR REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 62 The following conditions exist:

The Unit 1 reactor was manually tripped by the operators due to a rupture of the CCW N header Prior to stopping all RCPs, the 1A 125 VDC bus became de-energized Which of the following states the location where the RCPs can be most expeditiously tripped?

a. Trip 1A2 and 1B1'CPs from the RTGB, trip 1A1 and 1B2 RCPs locally at their respective breakers.
b. Trip 1B1 and 1B2 RCPs from the RTGB, trip 1A1 and 1A2 RCPs locally at their respective breakers.
c. 'rip 1A1 and 1B2 RCPs from the RTGB, trip 1A2 and 1B1 RCPs locally at their respective breakers.
d. Trip 1A1 and 1A2 RCPs from the RTGB, trip 1B1 and 1B2 RCPs locally at their respective breakers.

62

USNRC SENIOR REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 63 Unit 2 is at 100% power. PIS-07-2A, containment pressure safety channel has failed high. Assuming no operator action, which one of the following conditions would cause Containment Spray pump(s) to start and borated water to be admitted into containment?

a. The 120 VAC MC Instrument Inverter trips due to an electrical fault.
b. The 2B 125 VDC bus de-energizes.

/

c. PIS-07-2C containment pressure safety channel drifts to 6 psig.
d. An l&C tech inadvertently injects a high containment pressure signal into

~

the MB CSAS ESFAS channel.

63

USNRC SENIOR REACTOR OPERATOR INITIALLICENSE EXAMINATION r

QUESTION 64 The following conditions exist:

A plant shutdown was commenced1 hour ago due to a power supply failure Operators have been monitoring containment temperature The ANPS has instructed the operators to trip the reactor when containment temperature exceeds 120'F Which of the following is the power supply that has failed? (Assume all other plant equipment operable, consider each case separately)

a. 2A5 480V Load Center
b. 1A2 480V Load Center
c. 1AB 480V Load Center
d. 2A9 480V Load Center 64

USNRC SENIOR REACTOR'OPERATOR INITIALLICENSE EXAMINATION QUEST(ON 65 A category 4 hurricane has caused an extended loss of offsite power at St. Lucie Plant.

One minute after the Emergency Diesel Generators started and loaded, the 28 125VDC bus was lost. Which of the following correctly describe the status of the 28 Emergency Diesel Generator fuel oil system?

The 28 Emergency Diesel Generator will continue to run as fuel is supplied to the day tanks through the:

a. normally open bypass valve.
b. failed open inlet valves.
c. energized inlet valves.
d. inlet valves if manually pinned open.

65

USNRC SENIOR REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 66 The following conditions exist:

Unit 2 is at 100% power An instrument air leak has occurred at the instrument air accumulator on the 19.5'levation of the turbine building The leak has been isolated by a single isolation valve Service air and Instrument air have been crosstied Mechanical Maintenance is standing by to repair the leak Which of the following describes the ttttntmum administrative requirements in this case that will allow Mechanical Maintenance to begin work?

a. A full Equipment Clearance Order must be issued prior to Mechanical Maintenance commencing work.
b. A Human Clearance can be put in place to allow Mechanical Maintenance to commence work.
c. A Caution tag must be placed on the isolation valve prior to Mechanical Maintenance commencing work.
d. A deviation tag can be placed on the isolation valve and instrument air crosstie to allow Mechanical Maintenance to commence work.

66

USNRC SENlOR REACTOR OPERATOR tNlTIALL(CENSE EXAMlNATlON QUESTlON 67 A Vnit 2 refueling outage was scheduled to begin on October 16th. The following are the sequence of events as they took place:

10-16 / 0900 Turbine tripped, breaker open 10-16 / 1030 Mode 2 entered 10-16 / 1200 Mode 3 entered 10-16 / 1400 ARI 10-1 7 / 0300 Mode 4 entered Which of the following is the earliest time the movement of fuel in the reactor vessel can commence?

10-19 / 0900

b. 10-1 8 / 1030
c. 10-19 / 1200 10-20 / 0300 67

0 USNRC SENIOR REACTOR'OPERATOR INITIALLICENSE EXAMINATION QUESTION 68 Which of the following operator actions would require ANPS concurrence prior to taking the action? (Assume 100% power operation)

a. The desk RO manually. trips the reactor because 2A steam generator level is 41% NR and decreasing.
b. The boar'd RO performs an emergency boration due to two stuck out CEAs post trip.
c. The board RO takes manual control of the selected pressurizer pressure controller because it has failed high.
d. The desk RO stops the 2A CCW pump during a surveillance run because the ammeter indicates full scale and flow is decreasing.

68

USNRC SENIOR REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 69 The following is the dose record for an individual:

Committed Dose Equivalent (CDE) is 2525 mr Deep Dose Equivalent (DDE) is 2335 mr Lens Dose Equivalent (LDE) is 744 mr Committed Effective Dose Equivalent (CEDE) is 405 mr Total Organ Dose Equivalent (TODE) is 4865 mr Shallow Dose Equivalent (SDE) is 435 mr Maximum Extremity Dose (ME) is 6565 mr Which of the following is the individual's dose margin if the ~MR limit is used?

The individual:

a. has a margin of 2260 mr
b. has a margin of 2475 mr
c. has a margin of 2665 mr
d. has exceeded the NRC limit 69

USNRC SENIOR REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 70 Which of the following conditions would require a Total Effective Dose Equivalent ALARAreview prior to issuing an RWP?

On any job that:

a. is to be performed in a Hot Particle Area.
b. requires a full face air purifying respirator.
c. neutron radiation is present.
d. noble gas is present and respirators will not be used.

70

USNRC SENIOR REACTOR OPERATOR INITIALLICENSE EXAMINATION QVESTION 71 A steam generator tube rupture has occurred on Unit 2 and the Emergency Plan is being implemented. The NPS (Emergency Coordinator) has declared a Site Area Emergency and is about to announce the evacuation of the owner controlled area.

Which of the following is the correct assembly area considering the wind direction given?

Wind direction from:

a. 135', evacuate to JayCee Park.
b. 278', evacuate to Jensen Beach Causway.
c. 175', evacuate to Jensen Beach Causway.
d. 225', evacuate to JayCee Park.

71

USNRC SENIOR REACTOR OPERATOR INITIALLICENSE EXAMINATION QUEST(ON 72 An unexpected annunciator has alarmed in the Control Room. According to AP-0010120, "Conduct of Operations", which of the following correctly describes the correct response of the RQ in the vicinity of the control board?

Acknowledge the annunciator:

a. reset the annunciator, visually scan the annunciator panels to verify no other alarms were received simultaneously.
b. visually scan the annunciator panels to verify no other alarms were received simultaneously, reset the annunciator.
c. reset the annunciator, notify the ANPS, NPS or other senior licensed individual fulfillingthe control room command function of the alarm received.-
d. notify the ANPS, NPS or other senior licensed individual fulfillingthe control room command function of the alarm received, reset the annunciator.

72

USNRC SENIOR REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 73 According to 1-ONP-100.01, "Response to Fire", which of the following describes the procedural guidance in the event of a fire in the cable spreading room?

a. Use ~onl A train equipment, B train equipment is considered unreliable during this event.
b. Use ~bot B and A train equipment, but A train equipment may be unreliable during this event.
c. Use ~onl B train equipment, A train equipment is considered unreliable during this event.
d. Use ~bot A and B train equipment, but B train equipment may be unreliable during this event.

73

USNRC SENIOR REACTOR OPERATOR INITIALLICENSE EXAMINATION QUEST(ON 74 Unit 1 is in the process of a reactor startup. Which of the following conditions correctly describes the point in the startup where a continuous CEA withdrawal accident would result in the highest peak power?

a. BOC, lead group CEA continuously withdraws after reaching 2% power.
b. EOC, lead group CEA continuously withdraws at a point 2" prior to criticality.

c.. EOC, lead group CEA continuously withdraws after reaching 2% power.

d. BOC, lead group CEA continuously withdraws at a point 2" prior to criticality.

74

USNRC SENIOR REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 75 Unit 2 is in mode'5 returning from a refueling outage. The RCS has been filled and vented IAW OP 2-0120020, "RCS Fill and Vent". Pressurizer level is 32%. Which of the following conditions must also exist to meet the "Loops Filled~'ondition concerning Shutdown Cooling requirements?

a. Steam Generator wide range levels >10% and the RCS is capable of being pressurized to greater than or equal to 50 psia.
b. The RCS is capable of being pressurized to greater than or equal to 70 psia and Steam Generator wide range levels are >15%.
c. Steam Generator narrow range levels >10% and the RCS is capable of being pressurized to greater than or equal to 70 psia.
d. The RCS is capable of being pressurized to greater than or equal to 50 psia and Steam Generator narrow range levels are >15%.

75

USNRC SENIOR REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 76 Unit 2 was at 100% power when an RCS leak of 12 gpm occurred. The plant was in the process of being shutdown when the leak was isolated. Reactor power has been stabilized at 75%. The NPS did not have time to make an E-plan call prior to isolation of the leak. Which of the following describes the responsibility of the NPS concerning E-plan'lassification with the plant in its present state?

The NPS must:

a. fully implement the E-plan.
b. notify the NRC only.
c. notify the State only.
d. notify plant management only.

76

I VSNRC SENIOR REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 77 The following conditions exist:

Unit 2 is at 40% power

. The RO withdraws group 5 CEAs CEAs ¹8 and ¹9 do not move IS C reports both CEAs are mechanically bound and will not insert or withdraw under any circumstances According to ONOP 2-0110030, "CEA Off Normal and Realignment", which of the following is the FIRST required response by the control room crew?

a. Trip the reactor and turbine.
b. Realign Group 5 CEAs and remain at 40% power.
c. Commence emergency boration per ONOP 2-0250030, "Emergency B oration".
d. Place CEAs ¹8 and ¹9 on the hold bus.

USNRC SENIOR REACTOR'OPERATOR INITIALLICENSE EXAMINATION QUESTION 78 While verifying incore detectors during the performance of Check Sheet 2 of his shiftly paperwork, the RO notices an asterisk indicated on channels 19, 20, 21 and 22. Which of the following describes the significance of the indications, and action that is required to be taken?

Each incore channel:

a. has one failed detector and each channel must be placed in the out of service log.
b. has one detector in alarm and no action is required to be taken.
c. has one failed detector and no action is required to be taken.
d. has one detector in alarm and action must be taken to reduce linear heat rate.

78

USNRC SENIOR REACTOR'OPERATOR INITIALLICENSE EXAMINATION QUEST(ON 79 The following conditions exist:

Unit 2 is at 60% power 2C Intake Cooling Water pump'is out of service 2B Intake Cooling Water pump trips on overcurrent Which of the following correctly describes a partial list of plant equipment that will be rendered inoperable due to this condition? (Assume no operator action, all plant equipment in normal configuration )

a. 2B Containment Spray Pump, 2B Waste Gas Compressor, 2C Containment Cooler, 3C Control Room Air Conditioner.
b. 2B LPSI Pump, 2B Instrument Air Compressor, 2B Containment Cooler, 2B Shutdown Cooling Heat Exchanger.
c. 2B HPSI Pump, 2B Fuel Pool heat Exchanger, 2C Containment Cooler, 3B Control Room Air Conditioner.
d. 2B CCW Pump, 2B Sample Heat Exchanger, 2D Containment Cooler, 2B Shutdown Cooling Heat Exchanger.

79

USNRC SENIOR REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 80 Unit 2 is in Mode 6, refueling operations in progress. According to St. Lucie Technical Specifications, which of the following conditions would require the Refueling Supervisor to suspend fuel movement?

a. The equipment hatch is found to not be fully bolted in place.
b. A main steam safety valve and secondary manway are found to be removed from 2B S/G.
c. An RPM cannot open the outer personnel airlock because the inner airlock is open.
d. A containment purge isolation valve is found in the pinned position.

80

USNRC SENIOR REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 81 The following conditions exist:

Unit 1 has tripped from 100% power The CCW N header has isolated on the trip No other malfunctions exist Which of the following 1-EOP-01 Safety Functions would require contingency actions to be taken?

a. RCS Pressure Control, Core Heat Removal
b. RCS Inventory Control, Containment Temperature Control
c. RCS Heat Removal, Containment Temperature Control
d. RCS Pressure Control, RCS Heat Removal 81

USNRC SENIOR REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 82 The following conditions exist:

A liquid release was in progress on Unit 1 A spike in activity has caused an alarm on Liquid waste monitor (channel 43)

Channel 43 is indicating normal values FCV-6627X (liquid release discharge valve) is closed According to OP 1-0510022, "Controlled Liquid Release to the Circulating Water Discharge", which of the following describes the status of the impending release?

The liquid release can be re-initiated:

a. at any time provided channel 43 decreases below the alarm setpoint.
b. if authorized by the Chemistry Department.
c. only if a new release permit is issued.
d. if authorized by the NPS/ANPS.

82

USNRC SENIOR REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 83 The following conditions exist:

Unit 2 is in Station Blackout Unit 1 has both Emergency Diesel Generators available The Station Blackout Crosstie is available The ANPS has directed the performance of 2-EOP-99, Table 7 arid AppendixV Which of the following describes the initial preparations that are required to be made on Unit 2 prior to receiving 4.16KV power from Unit 1?

a Rack out only vital 4.16 KV and 480 V load center breakers and throttle all ICW and CCW discharge valves to 10 turns open.

b. Open all 6.9 KV, 4.16 KV and 480 V load center breakers and place all ICW and CCW pump control switches in pull to lock.

c Open only vital 4.16 KV and 480 V load center breakers and place all ICW and CCW pump control switches in pull to lock.

d. Rack out all 6.9 KV, 4.16 KV and 480 V load center breakers and throttle all ICW and CCW discharge valves to 10 turns open.

83

USNRC SENIOR REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 84 Unit 1 is at 100% power. Due to an off-normal condition, the ANPS has conducted a shift brief and has directed the RO to place the pressurizer on recirc and ~rema't

'00% power. Which of the following conditions has warranted this procedurally directed action?

a. Main Steam Safety leak

.b. Pressurizer spray line leak

.c. Reactor Coolant Gas Vent System leak

d. Pressurizer Code Safety leak 84

~

USNRC SENIOR REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 85 Unit 1 is in mode 6, refueling in progress. According to St. Lucie Technical Specifications, which of the following describes the evolution that would allow the operating crew to secure shutdown cooling for an extended period of time?

a. Movement of fuel
b. CEA,latching
c. Movement refueling equipment
d. Core verification 85

USNRC SENIOR REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 86 The following conditions exist:

A SGTR has occurred on the 2A steam generator During the power reduction to remove the unit from service, the reactor tripped on TM/LP A MSSV on the 2B steam generator stuck open on the trip Immediately after MSIS occured, the MSSV reseated According to AP 0010120, "Conduct of Operations", which of. the following is the correct strategy concerning steam generator isolation?

a. Continue steaming both steam generators until RCS Thot is < 525'F, then isolate the 2A steam generator.
b. Steam only the 2B steam generator until isolation criteria is met for the 2A steam generator, then isolate the 2A steam generator.
c. Steam only the 2A steam generator until the failed safety on the 2B steam generator is gagged, then isolate the 2A steam generator.
d. Continue steaming both steam generators until RCS Thot is < 525'F, then isolate the 2B steam generator.

86

USNRC SENIOR REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 87 The following conditions exist:

Unit 2 is in 2-EOP-15 due to a LOCNESDE RAS has just initiated The RO reports 2A HPSI flow is 105 gpm, 2B HPSI flow is 110 gpm Which of the following correctly describes the first action that is required to be taken as specified in 2-EOP-15, "Functional Recovery" ? (assume.all equipment operable)

a. Stop both HPSI pumps, minimum flow requirements are not being met.,
b. Stop one LPSI pump at a time until minimum flow requirements are met.
c. Stop one charging pump at a time until minimum flow requirements are met.
d. Stop the HPSI pump with the lowest flow and verify minimum flow requirements are met.

87

USNRC SENIOR REACTOR OPERATOR INITIALLICENSE EXAMINATION

'QUESTION 88 Unit 2 is at 100% power. Due to a malfunction of the Linear Range Nl channel 2C, the Channel C Variable High Power reactor trip bistable has been removed. Which of the following conditions will cause a reactor trip with the RPS in its present condition?

a. Channel A Thot RPS input fails low.
b. Channel B Linear Nl drawer "Average Control to Upper" switch placed in the "Upper" position.
c. Channel A Tcold RPS input fails high.
d. Channel B Linear Nl drawer "PR TEST" switch taken out of "operate" position.

88

USNRC SENIOR REACTOR'OPERATOR INITIALLICENSE EXAMINATION QUESTION 89 The following conditions exist:

Unit 2 is at 100% power Pressurizer level control channel X is selected for level control LT-1110X has failed low Which of the following correctly describes the Tech Spec LCO that will be violated if no operator action is taken. (Assume no reactor trip)

a. Maximum pressurizer level
b. DNB requirements
c. Low pressurizer pressure
d. Minimum pressurizer level 89

USNRC SENIOR REACTOR OPERATOR INITIALLiCENSE EXAMINATION QUESTION 90 The following conditions exist:

A loss of offsite power occurred on Unit 2 four hours ago Unit 2 is in a stable, Mode 3 condition All 2-EOP-9 Safety Functions are being met The TSC has recommended transition into NOP-2-0030127, "Reactor Plant Cooldown-Hot Standby to Cold Shutdown" According to 2-EOP-9, "Loss of Offsite Power", which of the following are the minimum conditions that must exist in order for this transition to take place?

a. At least one vital 4160V bus is poweredfrom either a Unit1 or Unit 2 startup transformer.
b. Both vital 4160V busses are powered from a Unit 2 startup transformer.
c. At least one vital 4160V bus is powered from a Unit 2 startup transformer.
d. Both vital 4160V busses are powered from either a Unit 1 or Unit 2 startup transformer.

90

USNRC SENIOR REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 91 The following conditions exist:

Unit1 is in mode 3 RCS cooldown for a refueling outage in progress RCS temperature is 512'F RCS pressure is 1720 psia A 140 gpm RCS leak inside containment occurs Which of the following correctly describes the required procedure selection for the current plant conditions?

The control room crew must use Excessive Reactor Coolant System Leakage ONOP in conjunction with:

a. RCS Cooldown Procedure
b. Low Mode ONOP, Plant Condition 1
c. 1-EOP-01 arrd 1-EOP-03
d. 1-EOP-03 91

USNRC SENIOR REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 92 Which of the following describes the Tech Spec bases for the minimum water volume in the Unit 2 Condensate Storage Tank?

To ensure sufficient water volume available to maintain hot standby conditions for:

a. four (4) hours, followed by an orderly cooldown to 325'F.
b. eight (8) hours, followed by an orderly cooldown to 350'F.
c. four (4) hours, followed by an orderly cooldown to 350'F.
d. eight (8) hours, followed by an orderly cooldown to 325'F.

92

USNRC SENIOR REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 93 Unit 1 is at 100% power when the 1B MSR develops a 2000 Ibm/hr leak to atmosphere in the shell side relief valve. Which of the following correctly describes the plant response to this transient?

a. Reactor power increases, main generator output remains constant.
b. Reactor power remains constant, main generator output increases.
c. Reactor power decreases, main generator output decreases.
d. Reactor power'remains constant, main generator output decreases.

93

USNRC SENIOR REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 94 Which of the following correctly describes the Tech Spec bases for the Unit 2 tgg power operations?

I ttt I qt ttdig~ldddd tg The Unit 2 Containment Purge:

a. isolation valves are not capable of being closed during an ESDE/LOCA.

'. filter train is not environmentally qualified for accident conditions.

c. isolation valves could inadvertantly leak to atmosphere during an ESDE/LOCA.
d. filter train is not monitored and would exceed ODCM limits if used.

94

USNRC SENIOR REACTOR OPERATOR INITIALLICENSE EXAMINATION 96 'UESTION Unit 2 is at 100% power, all equipment is in normal configuration. Which of the fll hagi t ig~RI k ~ itih ~ ht k.

a. >1 gpm requires a plant shutdown, >1 gpm requires entry into the Emergency Plan.

.b. >10 gpm requires a plant shutdown, >1 gpm requires entry into the Emergency Plan.

c. >1gpm requires a plant shutdown, >10 gpm requires entry into the Emergency Plan.
d. >10 gpm requires a plant shutdown, >10 gpm requires entry into the Emergency Plan.

95

USNRC SENIOR REACTOR'OPERATOR INITIALLICENSE EXAMINATION QUESTION 96 Unit 1 is at 100% power. The 1B Emergency Diesel Generator has been taken out of service for belt replacement. Which of the following equipment, if also taken out of service would challenge a Technical Specification LCO? (Assume all plant equipment in normal configuration)

a. 1C Charging Pump
b. 1-HVS-1 B Containment Cooler
c. 1A Boric Acid Makeup pump
d. HVE 7A Hydrogen Purge fan 96

"USNRC SENIOR REACTOR OPERATOR INITIALLICENSE EXAMINATION QUEST(ON 97 Which of the following conditions would constitute the shortest period of time in which action must be taken to comply with a Tech Spec Action Statement?

a. Unit 2, Mode 2, RCS Tavg 512'F
b. Unit 1, RCS Tavg 195'F, shutdown margin 2200 pcm I
c. Unit 2, 100% power, both trains of ECCS declared inoperable
d. Unit 1, Mode 6, RCS boron concentration 1700 ppm 97

USNRC SENIOR REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 98 Unit 2 is in mode 6. The containment purge system has been in service for the last three days, and must be secured for 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> due to maintenance work. Which of the following describes the batch release permit requirements concerning the restart of the containment purge system?

a. The original batch release permit will be used for the upcoming restart of the containment purge system.
b. A batch release permit is no longer needed for the upcoming restart of the containment purge system; the release in now considered continuous.
c. The original batch release permit can be used provided new ODCM limits are entered prior to restart of the containment purge system.
d. A new batch release permit must be issued prior to restart of the containment purge system.

98

USNRC SENIOR REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 99 An event has occurred at St. Lucie Plant and the NPS, who is now the Emergency Coordinator, has made the following protective action recommendations:

0-2 miles E(CR) 2-5 miles E(DW)+S(RS) 5-10 miles S(CR) 10 miles-TBD None Which of the following events is taking place at St. Lucie Plant?

a. A General Emergency with no projected core damage.
b. A confirmed hurricane warning with winds expected to reach 200 mph.
c. A terrorist group has taken over the Unit 1 control room.
d. A major tornado has hit the plant and caused massive damage to plant systems.

USNRC SENIOR REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 100 Which of the following correctly describes the St. Lucie Unit 2 Technical Specification Bases for MAXIMUMPressurizer water level?

To ensure:

a. the pressurizer heaters are not uncovered following a full power reactor trip.
b. the pressurizer level instrumentation remains within normal operating range.
c. the RCS is not operated in a solid condition and prevent water intrusion in the code safety valves.
d. RCS pressure limits are not exceeded following a loss of load event at full power.

100

U.S. Nuclear Regulatory Commission St. Lucie Nuclear Plant Senior Reactor Operator Examination Answer Key

1. A 2; D 3.'
4. B
5. D 6, D
9. D
10. C
11. D
12. C
13. B
14. C
15. A
16. A
17. B
18. C

0 U.S. Nuclear RegulatorJJ Commission St. Lucie Nuclear Plant Senior Reactor Operator Examination Answer Key

20. B
23. D
24. B
25. B
26. D 27.

B'9.

B

30. C
32. A
33. C
34. D
35. D

O.S. Nuclear Regulatory Commission St. Lucie Nuclear Plant.

.Senior Reactor Operator Examination Answer Key

38. B
39. B
40. A 41 C
42. C
43. A
44. D
45. B 46.6
47. D
48. A
49. D
50. D
51. D
52. C
53. C
54. C
55. C
56. C

U.S. Nuclear Regulatory Commission St. Lucie Nuclear Plant Senior Reactor Operator Examination Answer Key

57. B
58. A
59. C
60. B
62. A
63. C
64. B 65.D
66. A
67. C
68. A
69. A
70. B
72. B
73. B
74. D
75. C

U.S. Nuclear Regulatory Commission St. Lucie Nuclear Plant Senior Reactor Operator Examination Answer Key

76. A
77. C
78. D
79. C
80. B
82. C
83. B
94. D
86. C
87. C
88. B
89. A
93. D

U.S. Nuclear Regulatory Commission St. Lucie Nuclear Plant .

Senior Reactor Operator Examination Answer Key

96. B
97. D

=01 -21 3 c4 c53 c63 c71 c83 29= 0 I' uj 4$ 3 4 >>>>>> d<<

coj r <<1$ c3$ c4<< c5$ cec c7$ c8$

cps c2s c3s c4s c53 c7s cgs rgs WRITE

$ 0$ ~ 2$ <<3$ ~ <<5$ <<5$ c7$ cej <<9$ WtjitE ta cps cfs c23 33 c43 c5" c<<73 c73 cgs c93 <<2$ c3$ <<4$ c5$ cec c7$ cac c9 9'ft c >> HUIIBEB I.D. 0$ c1$ <<2$ $ 3$ c4$ 5$ >>4 7$ cej 9" cps rfs c2C c3s C4s c5s cgs C7s cgs cgs HEBE NUMBER <<0$ <<1$ <<2$ <<3$ <<4$ <<5$ <<5$ <<7$ >>e>> <<9 n ps cf s c23 c3 c43 c5s c63 c73 cgs cgs HERE coj <<1$ 2$ c3$ c4$ M <<5$ c7$ cac co.

<<0$ c'1$ <<2$ >>e>> <<4$ <<5$ <<5$ <<7$ <<ac <<9<< MARK R cPs cfs c2s c3s C4s,c5s c6s c7s cgs c9s '4s 0$ c 1'j >>4>> 3$ <<4$ 5$ <<8$ <<7$ <<8$

t0.

<<9$ ritrjrBBt "0" c1 3 c23 "3 c53 c6" C7- cgs cgs <<0$ >>4>> <<2$ <<3$ <<4$ <<5$ cec <<7$ <<8$ <<9 HERE

-"ps efs c2s c3s c4s c5s c63 c7s r8s c9s MARK PART 1 I.O. CODE I.D. NUMBER AT LEFT BY FILUNG IN cps cf 3 c23 3 c43 C53 c63 c73 r.g c93 THE APPROPRIATE BOXES ACCORDING TO NUMBER'ERE cps c2s c3s C4s C5s C6s c7s rgs cgs 0 THE EXAMPLE.

NKS SP NE z

0 e

2 'cAs cgs cQs CQs D" cfs cfs 51 cAs cgs cQ" cas cgs

~ .cfcfst cps s r<<3 ns Q

Q 3 ~

4 CAs CB cBs CQs cps cCs cps cfs cEs 52 53 54 cas gs cAs cBs

~

qQsr r~

cps;.CENTI cps cf s

>> ~ >>

Q cAs egs cQ- cfs 55 cAs eBs W cps cfs USE iNO. 2 PEiNCll, ONLY cas cgs ps c'As cgs g&s cDs CEs>,

~~

6 cQs 56 7 cas cgs rQC cEs 57 cAs cQs cps cps MAKF DARK MARKS 8 CAs cgs ~Qp cps cfs 58 cgs cQs cps cfs> ~ EXAMPLE: e As e 9s dh,c D s cEs jW cAC cgs cEs 9

10 cAs cgs cQs <<<<B8

.cps cfs 5g 6p cAs ~

CAS CBS ccfwE cQs CPS c'Qs.cf sr CES

~ ERASE COMPLETELY TO CHANGE 11 12 CAs 13 cAs cBs CQ3 cAs cgs ~ Qgs cps cCC -0" CEs cEs cEs 62 63

~ ~

eas cgs cgs CQs cPs, cEs'Ps cfs cAs cgs eCs cQs cfs NAME 14 64 CAs 16 ~

15 sA cgs C cps cEs cBs cQs cps cf s 17 cA" 4RÃh cQs p>> cE3 66 ~

65 cas egs 67 cAs cgs cgs cQs Qy cEs cQs cPs >> icfs eps

~

cfs SUBJECT 18 cAs cgs cps cf s 19 cAC cgs CQs esKts'ps cEs 68 69

~

~ c9s c9-cQs cps cEs; "Qs cPs cEs HOUR DATE 7P cas CCs 70 cas %Its cCs cps

~

cfs'Ds 21 CAC cgs cCs cps 71 cAs cgs cEs cps fs 72 cas iwgaj cQs cPs cfs 22 23 cAC cBs cas cQs cC" cps cEs cEs 73 cAs ~

74 CAs cgs cQs cCs cPs cEs cEs KEY MARKING INSTRUCTIONS fhts form is used for.

24 25 75 CAC cAs cgs CQs cps cCs Es cEs 75 cas cgs 76

~ cQs cfs oatrc cgs cQs cQs cfs a) Program Key b) Test Answer Sheet 27 28 2g

~

cAs cAs gs

>>KSfb CCC CQs cCs cDC cQs cDC cEs "E

77 78 79 cAs cgs rQs ~

cAs cgs wrcljc cPs cfs cAs c g 3 <<ccB<<c cDs cEs cPs When used as Program Key, you can control the results depending on which Key Boxes are marked.

cccu<<er 1 ccctaer 2 C2 3p cas c9s cDs cfs 80 cas epJ cQs cps cEs

~

c c $ XEY BOXES KEY I<<ac cec <<C<< cO<< <<Ec St<<ac cac <<Cc <<O<< <<KVWSVIEBBOXES cCs cps cEs cgs cQs cQs cfs 31 32 ~

cAs cgs cCs 33 cAC cBs ~ ct>>je cDc rQs E"

81 Befgtj 82 cAs cgs sllssc cps cfs 83 cAs <<EELY<<cCC cQs cEs Marking a Key Box or Combination of Key Boxes produces the tollowing scoring and error marking results:

34 ras c9s cQs 84, cas cgs cQs rjdhm cEs 35 eas cg" cCs 36 ras cCs cDs cEs cfs's 85 ~ c93 cQs cPs cfs 86 cAs cgs agye cQs cfs NKS C1 KEY No score p;inted on Key Prints score and error marks tor cohmn 1.

j C1

<< 37 cAC cg cD= cEs 87 cas cgs wes cps cEs KEY NE Prints score for cotlrnn 1 with no error marks.

88 eAs cjesj cQs cps cf 3 1

tj lj 38 cAs 4CQRE cCs cDs

~

3Q CAC cQs eps cfs cfs 89 ~ cgs cCs cps cfs cgs C2 KEY C2 Prints score and error marks for cohmn 2.

cAs

~

<<ll jl 4p cBs cQs cDC 90 cDs cEs KEY NE Prints scle for cohmn 2 with no error marks.

1$

41 cAC cgs "D E 91 CAs ego cCs CEs C1 C2 cgs cfs

~

cas cgs cAs altkn cQs CQs KEY KEY Prints to',al score and error marks for cohrres 1 and 2.

47 g2 43 cBC ccs cp= cfs 93 cas cBs cCs cfs C1 C2 KKv KEY NE prints total score tor cohmrjs 1 and 2 we no error marks.

cgs cCs 94 awls c'9 s cCs CQs cfs C1 C2 ccs cps cfs 95 cAs cgs cCs cEC KKY KEY SP Prints senarate ScOreS tor Cehrnw 1 and 2 with no error marks.

~ cen r.Q CQC cEs 96 cAs a4e cQs cps rfs After marking the appropriate Key Boxes, mark correct answers on

~<<

~ >> c >>9 cC3 cfs 97 cas cgs C cfs your program key.

cBs eQs cD-" "fs 98 CAs cCs cQs CEs

~I CBs C cEC 99 CAC cgs Qs ef-50 cAs cgs cQs "-Es 100 cA cgs CPs cf 3 (T) (F) (T) (F)

0 1 c3" 4 a52 e6 c72 a82 a92 Oj j

1>> 2>> <<2>> 4>> <<5>> Cd) <<<<>>>> jd>> 9 c2>> cs>> <<4>> >>$ >> cda c7a cd>>

cps cps a2s c3s c4s c5s c7s ags c9s WRITE

<<O

<<O>> >>2>> cdj ~ c5>> cd>> c7>> cdj cQ>> WRITE lh 4 cPs cps c22 3 c4s 5s cps c7s ags cg" I.D.

c2>> csa c4>> cs>>-cd>> c7a cd>> cQ NIRIEER o

<<Oj C'lj <<2>> <<2>> <<4>> <<5>> <<9<< <<7>> <<8>> <<Q cps res.c2s c3s c4s c5s cgs c7s cgs c9s NUMBER <<O>>. c'1>> <<2>><<csa. <<4>> <> <<8>> c74 <<9 c9 .e cps cps c2s 3s c4s c5s cgs c7s gs cgs HERE cdj c 1>> <<2>> c3>>

cO>> cjvcsa>>da cc>>

'<<4>>

~ cdj c7>> c8>> cQ cd>.cda>>47>>>>cda c9 MARK 5

cps, c.gs c2s a3s a4s c5s cgs c7s cBs cgs 9~ c1>> <<4>>>> cs>> <<4>> cS>> <<d>> c7>> cd>> c9 UA l4MSER 2 cps cps c2s c3s c42 "5 cgs a7s ags c9s <<O>> ale <<2>> <<3>>>><<4>> <<Sa'<<d>> <<7>>'<<8>> <<9 SERE cps. cps r2s a3s c4s a5s cgs c7s cgs cgs MARK PART 2 3" "4s c5s I.D. CODE I.D. NUMBER AT LEFT BY FILUNG IN cps eg c2 c6s c7s cgs c9s NUMBER THE APPROPRIATE BOXES ACCORDING TO cps cps c2s c3s c4s a5s ~ 'cgs cjs ags ags HERE THE EXAMPLE.

NKS Cl s c CZ C cs c KEY

)P) cAs OBs cCO cps afs )5) cAs c82 cQs cps cf s

) 02,cAs cBs cCs cps cfs )52 cAs cBs cQs cps;cfsg

)P3 cAs cBs cCs cps cfs 153 cAs aB" cQ cps cfs

)p4~rAs,'aB~s,"cCs aps cfs3 )54 cAs cBs cQs aps'c+'55

)P5 .As .Bs .C. .p. cfs cAs cBs cQs ps cf 2

)P6<cAsa aBs.,cd. cps"'r fs )56 cAs cBs cQs rps agog lp7 cAs cgs cQs cps cfs 157 eAs cgs cQs cps cfs

)pg:cAs. cBs cCs cps 'afs, cAs cBs ~ cQs cps" e f ~

lpg cAs cBs eQ. cps .Es )59 cAs cBs cQs cps cfs 1)p.aAs>>cBs rQs cps- cf s. )60>>CAs cBs cQs cps'f'sj

1) 1 aAO aBs cQs cps cf 2 161 cAs cBs cQs cps cEs

)12 cAs,.cBs cQs cPs cfs 162 cAs cBs rCs cps'"afs-;

1)3 cAs cBs cQs cps cf s )63 cAs cBs cCs cps cfs

)14'c'A0 cBs cQs cDs cEs 164 cAs cBs cCs cps~efs.

))5 cAs cBs cCs aps cEs ){j5 aAs aBs cQs aPs cfs

)1{j.cAs-cBs-cCs cps-cEs. 16{j cAs cBs cQs cPs>>'cfs)

))7 cAs aBs cQs "ps eEs )67 cAs eBs cQO aPs cfs 1)g cAs cBs-~cCs cps af s )gg=cAs cBs cQs rps>> cf's"

))g cAO cBs cQ cps cfs ){jg cAs cBs cQs rps cf s

)20 cAs cBs cQs rDs cfs 170 cAs cBs eCs cDs."cfs, cAs cBs cE" )7) cAs cBs cQs aDs afs

)22 rAs, rBs "cQs .cps'".af s )72 cAs cBs cCs cDs rEs,:

)23 cAs eBs cQs eps afs )73 cAS cBs cQO a[)s cf s 124 cAs cBs cQs aps r.Es 174 'rAs aBs .cQs cps- cfs:

)25 cAs cBs cQs cps afs 175 cAs cBs cC- cDs cEs

)2{j cAs cBs cQs aps cfs 176 aAs cBs eCs cDs aEs

)27 cAs eBs 'cQs cps cEs )77 cAs cBs cCs ODs cEs

)2g cAs cBs cQs cPs cfs 17g =As cBs cCs cps cfs.

12g cAs c82 aCs cps cfs )79 cAs cBs cCs cps cEs 13p cAs cBs cQs cps cfs )gp "cAE~Bs cCs ='ps 131 cAs cgs cCs cps cEO lgl cAs cBs cQs cps cfs

)32 cAs cBs cCs cps cEs )g2 aAs cBs cCs cps.cfs ~

)33 cAs cBs .cCs cps cEs lg3 cAs cBs cCs cDs cEs 134 cAs cBs cQs cps rEs ) g4 cAs cBs cQs cP's. cf s Please refer to key

)35 cAs cBs cCs cps cES )g5 cAs cBS aCs cps cEs

) 36 c'.As c:Bs cQs cps fs lg6 cAs eBs cQs rps cfs, marking instructions

)37 cAs cBs cQs

)3g cAs cBs cQs ps cEs cDs cEs

)g7 OAs cBO lgg cAs cBs aCs cQs cDs cEs cps cfs on front.

139 cAs OBs aCs ps cf" lgg cAs cBO cQs cps cfs 14p cAs ;Bs cQs cps cEs )gp cAs cBs cCs cDs cEs ~

141 cAs cBs cQs cps cEs )91 cAs c82 cQs aps cfs 142 cAs aBs cQs ps cEs )g2 cAs cBs aCs cDs aEs 143 cAs c82 cQs ps cEs )93 cA- cBs cQs cps cfs 144 cAs cBs cQs aDs cEs )g4 cAs aBs cQs rps afs

)45 cA" cBs cQs ps Es )95 OAs cBs cCs cps cfs

)4{j cAs cBs cC" r.ps aEs 196 aAs cBs acs cps aEs

)47 cAs cBs 2QS cps cEs )97 cAs cB" aQs cps afs

)4g cAs cBs cQs cps cfs )gg cAs cBs rQs eps cfs 149 cAs aBs ccs "Ds cEs )9g aAs cgs Cs ODO eEs 150 cAs eBs cQs aps '200 aAs cBs cQs cps cfs (T) (F) (T) (F)

U.S. Nuclear Regulatory Commission Site-Specific Written Examination A licant information Name: Re ion: II Date: Facilit /Unit: St. I ucie 1/2 License Level: RO Reactor T e: CE Start Time: . Finish Time:

Instructions Use the answer sheets provided to document your answers. Staple this cover sheet on top of the answer sheets. The passing grade requires a final grade of at least 80.00 percent. Examination papers will be collected four hours after the examination starts.

Applicant Certification All work done on this examination is my own. I have neither given nor received aid.

A licant's Si nature Results Examination Value Points Applicant's Score Points Applicant's Grade Percent

NRC RULES AND GUIDELINES FOR WRITTEN EXAM(NATIONS During the administration of this exam, the following rules apply:

N AL LIN 1 ~ 'heating on any part of the examination will result in a denial of your application and/or action against your license.

2. If you have any questions concerning the administration of any part of the examination, do not hesitate asking them prior to starting that part of the test.
3. SRO applicants will be tested at the level of responsibility of the senior shift position (Ie.

NPS, ANPS)

4. You must pass every part of the examination to receive a license or to continue performing license duties.

The NRC examiner is not allowed to reveal the results of any part of the examination until they have been reviewed and approved by NRC management. Grades provided by the facility licensee are preliminary until approved by the NRC. You will be informed of the official examination results about 30 days after all examinations are complete.

P TB-W ITTENE MINATI N IDE IN

1. After you complete the examination, sign the statement on the cover sheet indicating that the work was your own and you have not received or given assistance in completing the examination.
2. To pass the examination, you must achieve a grade of 80 percent or greater. Every question is worth'one point.
3. For initial examinations, the time limit for completing the examination is FOUR hours.
4. You may bring pens, calculators or slide rules into the examination room. Use only black ink to ensure legible copies.
5. Print your name in the blank provided on the examination cover sheet and answer sheet. You may be asked to provide the examiner with some form of positive identification.
6. Mark your answers on the answer sheet provided and do not leave any question blank.

Use only the answer sheet provided and do not write on the back side of the pages. If you decide to change your original answer, draw a single line through the error, enter the desired answer, and initial the change.

7. If the intent of the question is unclear, ask questions of the examiner only.
8. Restroom trips are permitted, but only one applicant at a time will be permitted to leave.

Avoid all contact with anyone outside the examination room to eliminate the appearance or possibility of cheating.

When you complete the examination, assemble a package including the examination questions, examination aids, answer'sheets and scrap paper and give it to the proctor.

Remember to sign the statement on the cover sheet indicating that the work was your own and you have not received or given assistance in completing the examination. The scrap paper will be disposed of immediately after the examination.

10. After you have tumed in your examination, leave the examination area as defined by the proctor. If you are found in this area while the examination is still in progress, your license may be. denied or revoked.
11. Do you have any questions?

USNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 1 Unit 1 is in mode 6. The NPS has suspended fuel movement due to a Tech Spec LGO violation. Which of the following conditions has caused fuel movement to be suspended?

Less than two (2):

a. Wide Range Log Safety Channels operable.
b. Appendix R Neutron monitors operable.
c. Linear Range Safety Channels operable.
d. Startup Range Neutron monitors operable.

VSNRC REACTOR OPERATOR INlTIALLICENSE EXAMINATION QUESTION 2 The following conditions'exist:

Unit 2 has tripped from 100% power due to a LOOP 2A Emergency Diesel has failed to start CEAs 42 and 39 are indicating UEL The ANPS directs the RO to perform an emergency boration 2B charging pump is running Which one of the following statements describes the correct operator actions?

a. Start 2B BAMT Pump, open V2514 (Emergency Borate Valve).
b. Hold close V2501(VCT Outlet Valve), hold open V2504 (RWT Makeup Valve).
c. Start 2B BAMT Pump, open V2508 or V2509 (Gravity Feed Valves).
d. Open V2508 or V2509 (Gravity Feed Valves), ensure closed V2501(VCT Outlet Valve).

USNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 3 N

While operating in MODE 5 with the pressurizer solid and the RCS in an isothermal condition at 150', RCS pressure rapidly increases. Which one of the following could cause this pressure increase?

a. Letdown pressure control valve diaphragm ruptures
b. Pressurizer heaters energize
c. Shutdown cooling flow is increased
d. Letdown level control valve setpoint is increased

USNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 4 The following conditions exist:

A total loss of feedwater event has occurred on Unit 1 S/G levels are 14% on wide range indication The control room crew has exited EOP-6 and entered EOP.-15,"RCS and Core Heat Removal", Success Path 4, "Once through Cooling"

  • AfterOnce through Cooling has been initiated, which one of the following is the correct action by the control room crew?
a. Implement EOP-6 and continue with feedwater restoration.
b. Implement in EOP-15 starting at step 1.
c. Remain in Success Path 4 until feed is recovered.
d. Implement EOP-3, RCS inventory is now decreasing.

USNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 6 The following conditions exist:

1B Steam Generator has been diagnosed with a tube rupture An RCS cooldown to 523'F Thot is completed 1B Steam Generator has been isolated per 1-EOP-99, Appendix R AII RCPs are off With cooldown in progress for an additional 30 minutes, which one of the following RCS Thot temperatures is correct if the maximum recommended cooldown rate is utilized?

a. 473 'F
b. 485.5 'F
c. 498 'F
d. 508 'F

USNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 6 Due to a condenser tube leak, The ANPS has directed entry into 1-ONP-22.01, "Rapid Downpower", and has directed the ROs to commence a downpower at'30 MW/minute, and maintain Tavg within 6.6'F of Tref. Which one of the following is the procedurally correct method of reducing RCS Tavg.? (Assume one BAM pump running)

a. Open Boric Acid Load Control Valve V2525; cycle the running BAM pump.
b. Open Emergency Borate Valve V2514; cycle V-2514.
c. Open Boric Acid Load Control Valve V2525; cycle V2525.
d. Open Emergency Borate Valve V2514; cycle the running BAM pump.

e VSNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 7 A large instrument air teak has occurred on Unit 1: As PCV-18-5 (Unit 2 to Unit 1 Instrument Air Crosstie) is stroking open, it becomes mechanically bound in the full open position. Assuming no operator action, which one of the following statements correctly describes the system response?

a. Unit 1 (PCV-18-6) crosstie will automatically close at 85 psig decreasing, isolating instrument air to Unit 2.
b. Unit 2 instrument air depressurization is prevented by a check valve located in the crosstie line.
c. Unit 1 station to instrument air crosstie will automatically open at 85 psig decreasing to supply compressed air to Unit 1.
d. Unit 2 instrument air system will depressurize as Unit 1 instrument air system depressurizes.

USNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 8 Unit 2 is at 100% power, 2A charging pump was running with 28 charging pump selected as backup. 2A charging pump tripped due to a faulty breaker. The following conditions now exist:

2B charging pump was started to replace 2A charging pump 2A charging pump control switch was placed in the "OFF" position No other switch manipulations were made If pressurizer level setpoint is increased to 69%, which of the following is a correct description of the current CVCS configuration?

a. 2B charging pump running with no change in letdown flow.
b. 2B and 2C charging pumps running with minimum letdown flow.
c. 2B charging pump running with minimum letdown flow.
d. 2B and 2C charging pumps running with no change in letdown flow.

USNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 9 Unit 2 ROs have just performed a shutdown of the reactor and turbine due to lower and middle seal failures on the 2B1 Reactor Coolant Pump. After the 2B1 RCP was stopped, the upper seal also failed, Which of the following describes the flowpath.of controlled bteedotf from the 281 RCP ~ehte time?

281 RCP controlled bleedoff:

a. has been directed to the floor drains.
b. is being directed to the Volume Control Tank.
c. is being directed to the Quench Tank.
d. has been isolated.

VSNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 10 2-EOP-6, "Total Loss of Feed" addresses the use of a Condensate pump to establish feed to the steam generators if certain conditions are met. Which one of the following situations would warrant the use of a Condensate pump?

a. A loss of both non-vital 4160 KV busses has occurred and,steam generator pressures are 600 psig.
b. A trip from 80% power has occurred and Steam Generator levels are 45%

wide range.

c. A trip from 30% power has occurred and Steam Generator levels are 35%

narrow range.

d. Steam Generator levels are 25% wide range and steam generator pressures are 650 psig.

10

I USNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 11 Unit 2 is performing a rapid unit shutdown due to a Steam Generator tube leak on the .

2A Steam Generator. According to ONOP 2-0800030, "Steam Generator Tube Leak",

under what conditions would the ROs be required to trip the reactor and turbine?

a. Three of four TM/LP pretrips are in'alarm on the RPS.
b. Pressurizer level cannot be maintained with 28 gpm letdown and all available charging pumps running.

'c The difference between actual Pressurizer level and Pressurizer level setpoint exceeds 6.6%.

d. Pressurizer level cannot be maintained with V-2522 closed and all available charging pumps running.

USNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION

'QUESTION 12-The Unit 2 CCW Radiation Monitor has gone into an alarm condition. Further investigation revealed the solenoid flow.control valve closed and isolated flow. Which of the following has occurred at the CCW Radiation Monitor and is the probable cause of this condition? N

a. Low CCW flow.
b. High CCW radiation.
c. Low CCW pressure.
d. High CCW temperature.

12

USNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 13 Unit 1 is at 100% power, steady state. 1A and 1B steam generator pressures are at 890 psig. If a main steam leak inside containment were to occur, which of the following is the minimum value that 1A steam generator pressure would have to change to cause a reactor trip strictly on steam generator parameters?

a. 13%

b 15%

c. 30%
d. 33%

13

USNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION QUEST(ON l4 The following Unit 2 conditions exist:

CCW surge tank Lo-Lo level switch (LS-14-6A) is valved out for replacement All "N" header valves are OPEN 2A CCW pump develops a large discharge flange leak The leak exceeds the capacity of makeup flow Assuming no operator action, which of the following correctly describes FIRST response of the system?

a. "A" side N header valves (HCV-14-8A and HCV-14-9) close.
b. 2A CCW pump trips on low suction pressure.
c. "B" side N header valves (HCV-14-8B and HCV-14-10} cl'ose.
d. 2A CCW pump cavitates.

14

USNRC REACTOR OPERATOR INITIALLICENSE EXAlNINATION QUEST(ON 15 The following conditions exist:

Unit 2 is at 100% power Charging and letdown are in normal configuration Regen HX inlet pressure is 2250 Regen HX outlet pressure is 2200 If a 10 gpm leak occurs in the letdown line downstream of the regenerative heat exchanger, which one of the following indications will occur as a result of the leak?

(assume system in auto)

Indicated letdown flow:

a. will decrease due to LCV-2110P closing.
b. will isolate due to V-2516 closing.
c. will increase due to LCV-2110P opening.
d. will isolate due to V-2615 closing.

15

vP USNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 16 The following conditions exist:

Vnit 1 is at 100% power

¹ Linear Range Control Channel 9 is out of service for I8 C repair

¹ Linear Range Channel 10 is supplying the RPS Power Ratio Calculator Which of the following would be the system response if Channel 10 upper detector failed high?

.a. ASI as indicated on the Power Ratio Recorder would violate the negative setpoint, an alarm would be generated.

b. The lower setpoint for ASI as indicated on the Power Ratio Recorder would become more negative, no alarm would be generated.
c. ASI as indicated on the Power Ratio Recorder would violate the positive setpoint, an alarm would be generated.
d. The upper setpoint for ASI as indicated on the Power Ratio Recorder would become more positive, no alarm would be generated.

16

USNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 17 The 1B 125 VDC bus has been lost due to a wiring fault. The control room crew is carrying out the actions of ONOP 1-0030136, "Loss of a Safety Related D.C. Bus". The ANPS has directed the ROs to align the 1B 125 VDC bus to the 1D 125 VDC non-safety bus. Which of the followin*g statements correctly describes the process of bus alignment?

a. The.1B 125 VDC bus can befed~directt from the 1D 125 VDC bus by aligning the keyswitches on RTGB 101.
b. The 1B 125 VDC bus canbefedfromthe1D125VDC bus~throu h the 1AB 125 VDC bus only by unlocking and aligning local breakers.

The 1B 125 VDC bus can be fed ~dirac i from the 1D 125 VDC bus by unlocking and aligning local breakers.

d. The,1B 125 VDC bus can be fed from the 1D 125 VDC bus ~throu h the 1AB 125 VDC bus only by aligning'the keyswitches on RTGB 101.

17

USNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 'I8 Unit 2 is at 100% steady state power. Annunciator B-1 3, "2A2 4.16 KV 6 Current Trip" has just gone into alarm. Which one of the following correctly describes the effect of this condition on the 2A Emergency Diesel Generator?

The 2A Emergen'cy Diesel Generator:

a. starts, but does not load on the 2A3 bus.
b. does not start. It will only start on 2A3 bus undervoltage.

c., starts and loads on the 2A3 bus.

d. does not start, but will start and load on the 2A3 bus when the bus lockout relay is reset.

18

USNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 19 The following conditions exist:

Unit I is at 20% power, returning from a refueling outage, turbine on hold MTC is+1 pcmPF The RO places steam generator blowdown in service at 120 gpm/SG Which of the following describes the immediate plant response to this evolution?

Assume no operator action.

a. Reactor power increases, letdown flow increases, feedwater flow increases
b. Reactor power decreases, letdown flow increases, feedwater flow decreases
c. Reactor power increases, letdown flow decreases, feedwater flow decreases
d. Reactor power decreases, letdown flow decreases, feedwater flow increases 19

USNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION QUEST(ON 20 Unit 1 is in Mode 1, 100% power. The SNPO is preparing the 1B Containment Spray Pump for its quarterly surveillance run. Which of the following correctly describes an additional manipulation that the SNPO must perform on Unit 1 but not on Unit 2?

a. Open the CCW isolation valve to the 1B Containment Spray pump seal heat exchanger.
b. Open 1B Containment Spray pump manual recirc valves.
c. Close MV-07-3B, B CS Header Isolation.
d. Close the Sodium Hydroxide tank vent to atmosphere.

20

USNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 21 The following conditions exist:

A large break LOCA has occurred on Unit 1 1-EOP-03, "Loss of Coolant Accident" is being implemented Hydrogen Analyzers initially indicated 0.7%

Hydrogen concentration has increased another 2.6% since the initial

. reading No equipment is out of service Which of the following actions are required to satisfy the Containment Combustible Gas Control safety function of 1-EOP-03?

a. Ensure both Hydrogen Recombiners and Containment Spray in service.
b. Ensure the Hydrogen Purge System in service.
c. Ensure both Hydrogen Recombiners and Hydrogen Purge System in service.
d. Ensure both Hydrogen Recombiners in service.

21

USNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 22 Unit 1 has tripped from 100% power due to a feedwater problem. According to AP-0010120, "Conduct of Operations", which of the following is the approved method of chronological log entries during this event?

1

a. The events can be reconstructed at a later time using all available references, but must be made in chronological order when making an entry.

t

b. The desk RO will record all events in the RCO chronological log as they occur, after performing SPTAs.
c. The events can be reconstructed at a later time using all available references, chronological order is desired but not necessary when making an entry.
d. 'A designated person, preferably the STA, will record all events in the RCO chronological log as they occur.

22

USNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION QUEST(ON 23 The Unit 1 SNPO was in the process of performing a valve lineup when he discovered an incorrect valve number and valve oosition. To correct this condition, he generated a temporary change (TC) to the procedure IAW ADM-11.03, "Temporary Change to.

Procedures". Which of the following describes the status of the TC, ninety five days later, assuming no action was taken by the originator?

The Temporary Change:

a. was automatically canceled after 90 days.
b. still exists in the TC log.
c. was canceled after the valve lineup was performed.
d. was automatically incorporated into the procedure.

23

USNRC REACTOR O'PERATOR INITIALLICENSE EXAMINATION QUEST(ON 24 The 1B CVCS lon Exchanger has been placed in service following resin replacement.'.

Although the RO rinsed the ion exchanger for 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, after 10 minutes of in-.service .

time, the following conditions exist:

RCS Tcold 548.9 Reactor Power 100.6%

According to AP 0010120, "Conduct of Operations", which of the following is the correct action to be taken by the control room crew?

a. Immediately implement ONOP 1-0250030, "Emergency Boration".
b. Reduce reactor power to < 100% within 15 minutes.
c. Reduce reactor power to < 100% within 30 minutes.
d. Trip the Reactor and Turbine.

24

USNRC REACTOR OPERATOR INITIALLICENSE EXAlNINATION QUESTION 25 For entry into a VERY HIGH RADIATIONAREA, which of the following correctly describes all requirements that must be met?:

a. Continuous HP coverage, a high range dosimeter, HP department head approval, NPS approval.
b. A specific RWP, continuous HP coverage, HP department head approval, NPS approval.
c. A specific RWP, a hand held survey instrument, a high range dosimeter, HP department head approval.

Continuous HP coverage, a hand held survey instrument, HP department head approval, NPS approval.

25

USNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 26 Unit 2 tripped from 100% power. Reactor power is 5X10~% as indicated on Wide Range Instrumentation. Which of the following correctly describes the status of the Nuclear Startup Channels ~ahts tme?

The Startup Channels:

a. are energized. They automatically energize at 10'%ower.
b. are not energized. They will energize if the switches are placed in "on".
c. are energized. They automatically energize on the reactor trip signal.

d.. are not energized. They will not energize if the switches are placed in 26

USNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 27 The following conditions exist:

Unit 2 is at 100% power An electrician, performing-a surveillance, de-energizes the 283 4.16 KV bus The 28 EDG successfully starts and loads All plant equipment is operable Assuming no operator action aside from resetting individual pressurizer heater

,banks on RTGB 203, which of the following correctly describes the TOTAL

. pressurizer heater availability at this time?

a. Two proportional banks, six backup banks
b. One proportional bank, three backup banks J
c. One proportional bank, four backup banks
d. Two proportional banks, four backup banks 27

USNRC REA'CTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 28 2A steam generator pressure safety channel A has failed low. 2B steam generator pressure safety channel A is normal. Which of the following correctly describes plant response if 2B steam generator pressure safety channel D were to fail low?

a. RPS reactor trip only
b. RPS reactor trip and ESFAS actuation
c. ESFAS actuation only
d. No RPS reactor trip or ESFAS actuation 28

USNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 29 The bistable for RCS Low Flow reactor trip has been removed from RPS channel "D" for I&C work. Which one of the following conditions would cause a reactor trip on RCS.

Low Flow with the RPS in its current configuration?

a. "A" channel Reactor Coolant Pump differential pressure (PDT 1110 8 1112) de-energizes.
b. "A channel Steam Generator differential pressure (PDT 1111 & 1121) fails low.
c. "A" channel Reactor Coolant Pump differential pressure (PDT 1110 &

1112) instrument tap develops a leak.

d. "A" channel'Core differential pressure (PDT 1124W & 1124Z) de-energizes..

29

USNRC REACTOR OPERATOR lNlTIALLlCENSE EXAMlNATlON QUEST(ON 30 Unit 2 was at 100% power when a Loss of Offsite Power/SIAS occurred. Which of the following correctly describes the configuration of the Containment Cooling System after both Emergency Diesel Generators start and load on their respective busses?

(Assume all plant equipment in normal configuration prior to the LOOP/SlAS)'.

Four coolers running in fast speed..

b. Three coolers running in slow speed.
c. Four coolers running in slow speed.
d. Three coolers ruhning in fast speed.

30

USNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION QUEST(ON 31 The following conditions exist:

Unit 2 tripped from 100% power B steam generator narrow range level channel A has failed low Auxiliary Feedwater was throttled to 150 gpm / steam generator after AFAS actuation Both steam generator levels are currently 10% narrow range and increasing Which of the following correctly describes the response of the "B" train AFW system if the MB 120 V Instrument lnverter is de-energized and no operator action is taken?

a. At 29% NR indication,'FW flow to the 2B S/G automatically isolates, the header valves must be manually opened to reestablish flow.
b. AFW flow to the 2B S/G remains in service and will continue to fill the 28 S/G. 4

'c. AFW flow to the 2B S/G automatically isolates on Rupture ID due to the failure, AFAS-1 must be manually actuated to reestablish flow'.

d. At 29% NR indication, AFW flow to the 2B S/G automatically isolates, the header. valves automatically re-open at 19.5% NR.

31

USNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 32 Unit 2 was performing a rapid power reduction due to an RCS leak inside containment when the reactor was manually tripped. SIAS actuated 1 minute following the manual trip. SPTAs are in progress and the following conditions exist 12 minutes after trip:

RCS pressure 1200 psia RCS Thot 476'F Pressurizer level 0%

Containment Pressure 2 psig SG levels 43% WR with feed available Which of the following is the correct RCP trip strategy for the current conditions?

a. Trip all four RCPs
b. Trip one RCP in each loop
c. Leave all four RCPs running
d. Trip one RCP

USNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 33 SE-07-1A, (iodine Removal System eductor valve) is closed and de'-energized for solenoid replacement. Which of the following correctly describes the flowpath of Sodium Hydroxide if a full CSAS occurred with the system in its current configuration?

Sodium Hydroxide would flow:

a. through 2 eductor solenoid valves to the discharge of the 1B Containment Spray Pump.
b. through 1 eductor solenoid valve to the discharge of 1A and 1B Containment Spray Pumps.
c. through 2 eductor solenoid valves to the'suction of 1A and! B Containment Spray Pumps.
d. through 1 eductor solenoid valve to the suction of the 1B Containment Spray Pump.

0 USNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 34 The following conditions exist:

Unit 2 is at 100% power The 2A HPSI is being used to fillthe 2A2 SIT An electrical fault has caused the 2A3 4.16 KV bus to de-energize Which one of the following will occur when the 2A EDG starts and loads on the bus?

The 2A HPSI will:

a. auto sequence onto the bus six seconds after the EDG output breaker closes.
b. auto sequence onto the bus thirty seconds after the EDG output breaker.

closes.

c. will not sequence onto the bus and will have to be manually started.
d. loads onto the bus immediately after the EDG output breaker closes.

VSNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 35 Unit 2 is in Mode 6, refueling in progress. A leak has developed in the suction line of ..

the in service Fuel Pool Cooling pump, upstream of the suction isolation valve . Which of the following correctly describes the status of fuel pool water level if no action is taken to isolate the leak?

Fuel pool water level will decrease:

a. to 23 feet above the top of the fuel assemblies.

b, to the bottom of the fuel transfer canal gate.

c. to the bottom of the skimmer suction.
d. to approximately 52 feet.

35

USNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION QUEST(ON 36 A large ESDE has occurred on Unit 2. The RO, performing safety function status checks for 2-EOP-05, reports that RCS temperature is 350'F and RCS pressure is 1290 psia. The crew should:

a. secure,all running RCPs, initiate seal injection.
b. stabilize RCS temperature, depressurize the RCS.
c. reduce RCS temperature to establish 20'F subcooling.
d. stabilize RCS pressure and temperature'at current values.

USNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 37 Which one of the following actions would be permissible according to AP 0010120, "Conduct of Operations" ? (assume all equipment operable)

a. Manual initiation of AFAS post reactor trip with S/G levels at 22% NR.
b. Blocking SIAS during a plant shutdown due to a 100 gpm RCS leak inside containment.
c. Blocking MSIS during a plant cooldown due to a 100 gpm SGTR.,
d. Manual actuation of SIAS prior to auto actuation due to a 200 gpm LOCA.

a

, USNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 38 Unit 1 is at 100% power, steady state. The 1C 120 VAC Instrument bus becomes de-'.

energized due to an electrical fault. Which of the following correctly describes the status of the Diverse Scram System (DSS) at this time?

a., The MG set input breaker will open if ONE DSS channel becomes actuated.

b. A line contactor will open if TWO DSS channels become actuated.
c. The MG set input breaker will open if TWO DSS channels become actuated.
d. A line contactor will open if ONE DSS channel becomes actuated.

USNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 39 The following conditions exist:

Unit 2 is at 100% power, NOP / NOT A steam leak has developed on the 2A main steam line outside containment An RCS leak has developed on the 2A hot leg Which of the following correctly describes the the condition of the steam exiting each leak? (Assume containment pressure is atmospheric)

a. The primary side steam is saturated, the secondary steam is saturated.
b. The secondary steam is superheated, the primary steam is saturated.
c. The primary steam is superheated, the secondary steam's superheated.
d. The secondary steam is saturated, the primary steam is superheated.

39

USNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION QUEST(ON 40 Unit 2 is at 50% power, turbine startup in progress. Which one of the following de--

energized CEDM components'is the FIRST component to be energized when the RO places the CEA control switch to WITHDRAW?

a. Lift Coil
b. Upper Gripper Coil
c. Load Transfer Coil
d. Lower Gripper Coil 40

r USNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 41 Which of the following is the method of level indication/annunciation of the Unit 2 reactor cavity sump?

I a'. Indication is provided by reed switches, annunciation is provided by a bubbler system.

b.. Annunciation is provided by a float device, indication is provided by reed switches.

c. Indication is provided by a bubbler system, annunciation is provided'by a float device.
d. Annunciation is provided by reed switches, indication is provided by a float device.

USNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 42 The following conditions exist:

Unit 2 is in the process of a turbine startup Reactor power is at 10%

The RO is preparing to latch the turbine Valve position limits have been set to "0" Which of the following correctly describes the response of the system when the RO depresses and holds the "Latch" pushbutton on RTGB 201?

a. Auto stop oil pressure increases to approximately 100 psig, governor and intercept valves stroke open.
b. DEH supply header pressure increases to approximately 1800 psig, intercept and reheat stop valves stroke open.
c. Auto stop oil pressure increases to approximately 100 psig, intercept and reheat stop valves stroke. open.

I'.

DEH supply header pressure increases to approximately 1800 psig, governor and intercept valves stroke open.

42

USNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 43 Unit 1 turbine startup is in progress. The RO is in the process of placing the MSRs in service. Which of the following describes the system response when the "Ramp" pushbutton on the reheat control panel is depressed?

a. The four MSR TCVs open over a four hour period.
b. The four smaller MSR TCVs open over a two hour period, the four large MSR TCVs open after an additional half hour.
c. The four MSR TCVs open over a two hour period.
d. The four smaller MSR TCVs open over a four hour period, the four large MSR TCVs open after an additional half hour.

USNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 44 2A Emergency Diesel Generator has been started and is loaded to the grid for a periodic surveillance run. Which of the following describes the response of the 2A Emergency Diesel Generator if a loss of offsite power occurs during this evolution?

The 2A Emergency Diesel Generator:

a. remains running and carrying the 2A3 4160 V bus loads.
b. trips on overspeed.
c. output breaker opens and re-closes, normally running loads are sequenced on the 2A3 4160 V bus.
d. trips on overcurrent.

44

USNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 45 Which of the following plant conditions would present the most significant challenge to shutdown margin requirements during a main steam line rupture?

a. Hot full power, beginning of cycle.
b. Hot zero power, end of cycle.
c. Hot zero power, beginning of cycle.
d. Hot full power, end of cycle.

45

USNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 46 The following conditions exist:

A Station Blackout has occurred on Unit 1 2A and 28 Emergency Diesel Generators are available Which of the following describes the preferred method of supplying Unit 1 with 4160V power through the Station Blackout Crosstie?

Crosstie:

a 2A3 4160V bus with 183 4160V bus.

b. 283 4160V bus with 183 4160V bus.

J

c. 2A3 4160V bus with 1A3 4160V bus.

d 283 4160V bus with 1A3 4160V bus.

46

USNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 47 The Unit 2 Fire and Security Sups has been de-energized due to an electrical fault and will remain out of service for 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />. According to 2-ONP-49.01, "Sups - Non Safety Vital AC or Fire and Security Inverter Malfunction", which of the following actions must

, be performed on Unit 2 that would NOT have to be performed in the same situation on Unit 1?

a. All vital access doors must be posted.

.b. Local primary sampling for activity must be performed.

c. Fire watches must be posted.

. d. Local secondary sampling for activity must be performed.

47

USNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 48 Unit 2 generator output is 4B5 MW. According to ONOP 2-0610031, "Loss of Condenser Vacuum", which of the following conditions would require an immediate

.reactor/turbine trip?

a. Condenser backpressure is 2.B5 psia.
b. Two circulating water pumps in the same discharge tunnel trip.
c. The differential pressure between A and 8 condenser is 1.13 psid.
d. Condenser air in leakage is 12 CFM.

48

USNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 49 Unit 2 is at 100% power. Due to a power supply failure, ONE CEA has dropped to the.

bottom of the core. Which of the following components is de-energized?

(Assume system in normal configuration)

a. Coil Power Programmer
b. Power Switch
c. Hold Bus
d. ACTM module 49

USNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 50 Unit 1 was at 100% power when the control room was evacuated due to a fire in the cable spreading room. Prior to exiting the control room, the operators had time to perform their initial actions. Assuming all appendices of 1-ONP-100.02, "Control Room Inaccessibility" were performed, which one of the following will be AVAILABLEto the RO when he arrives at the HSDCP?

a. Letdown
b. Main spray
c. PORV
d. Aux Spray 50

VSNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION QUEST(ON 61 According to 2-EOP-1, "Standard Post Trip Actions", in which of the following situations would it ~NT be permissible to initiate seal injection after RCPs are removed from.

service while in 2-EOP-1?

a. A cooldown has caused RCS Tcold to decrease to 495'F.

RCS pressure is at 1290 psia after SIAS with subcooling at 40'F.

c. Main and Auxiliaryfeedwater has been lost and cannot be restored.

d.' valid CCW to RCP trip has actuated and caused the reactor trip.

51

USNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 52 I

Which of the following Inadequate Core Cooling Monitor (QSPDS) indications would be inaccurate if Reactor Coolant Pumps remained running with the Reactor Vessel Level Monitor reading less than 100%?

a. Upper head region level indication.
b. CET saturation margin indication.
c. Plenum region level indication.
d. RCS saturation margin indication.

52

USNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION'53 The ANPS was in the process of reviewing the RO logs from the previous shift when he noticed the following trend on 2A1 RCP lower oil reservoir level:

0900 +3 I I 1200 +2 I 1

1500 +1 ll Assuming no system leakage, which of the following could be the cause of the 2A1 RCP lower oil reservoir level trend?

a. Instrument air pressure to the transmitter is increased slightly.
b. A buildup of debris has occurred at the bubbler tube outlet.
c. An I/A leak has developed where the bubbler tube enters'the reservoir.
d. Containment pressure has decreased.

0- QUESTION 54 USNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION Unit 1 has just come off line and is in Mode 3. The ANPS has directed the ROs to reduce Tavg to < 500'F. Which of the following parameters was exceeded and is,the reason for this Tech Spec required evolution?

a. Primary Chemistry
b. Secondary Activity
c. Primary Activity
d. Secondary Chemistry 54

USNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 55 Unit 1 has tripped from 100% power due to a loss of offsite power. Two minutes after the trip, the 1B 125 VDC bus becomes de-energized. Which of the following correctly describes the auxiliary feedwater configuration ten minutes post trip? (Assume no operator action)

a. 1A and 1C AFW pumps running and feeding the 1A steam generator.
b. No AFW pumps running.
c. Only 1A AFW pump running and feeding th'e 1A steam generator.
d. 1A AFW pump running and feeding the 1A steam generator, 1C AFW pump running and feeding both steam generators.

55

0 USNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION '56 A large break LOCA has occurred on Unit 2. The ANPS has directed the RO to make the alignment to pump the safeguard sumps tb containment IAW 2-EOP-3, "Loss of Coolant Accident". Which of the following describes the flowpath of the safeguards sumps after the alignment is made?

The safeguard sump water will be pumped directly to the:

a. reactor drain tank
b. containment sump
c. reactor cavity sump
d. quench tank 56

USNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 57 The following conditions exist:

Unit 1 is currently at 80% power VCT level is currently at 42%

A 5 MW/MIN downpower is in progress due to a 18 gpm RCS leak 2 charging pumps are running with letdown in automatic Due to a malfunction in the Boric Acid Makeup System, the downpower must be performed using 10 gpm of boric acid being supplied via the manual borate valve No other makeup is available VCT level = 33.8 gal./%

lf the rate of power reduction and RCS leakage remain constant, at approximately what power level will the RWT begin to supply the suction of the charging pumps? (assume 10% VCT level decrease due to RCS density change)

a. 5%
b. 16%

c 24%

d 32%

57

USNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION QVESTION 58 The Unit 2 board RO had just assumed the shift and was.taking his first set of hourly

-logs when he noticed Shield Building Exhaust fan HVE-6A running. Which of the following conditions could be the reason for HVE-6A running? (Assume all plant equipment operating properly)

a. High radiation in the fuel pool area.
b. A containment mini purge is in progress.
c. High shield building to containment DP.

d., Failure of the MA channel CIS monitor.

58

USNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 59 The following conditions exist:

Motor Generator (MG) set 1A and 1B are running Bus tie breaker (TCB ¹9) is open Reactor Trip breakers 3, 4, 7 and 8 are open (B side)

Reactor Trip breakers 1, 2, 5 and 6 are closed (A side)

Which of the following is correct concerning the closure of the reactor trip breakers 3, 4 7 and 8 by the RO?

The operator:

a. may close the reactor trip breakers in any combination at any time.

must close the bus tie breaker prior to closing the reactor trip breakers.

c. must ensure one MG set is taken out of service prior to closing the reactor trip breakers.
d. must synchronize 1A and 1B MG sets with the bus tie breaker open prior to closure of the reactor trip breakers.

59

USNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 60 According to ONOP 2-0530030, ".Waste Gas System", which of the following correctly

'escribes the immediate operator actions concerning the combination of hydrogen and.

oxygen in the waste gas decay tanks?

. If the in-service gas decay tank:

a. hydrogen concentration exceeds 4% and the oxygen concentration exceeds 2%, immediately admit nitrogen to reduce the oxygen concentration to within limits.

b oxygen concentration exceeds 4% and the hydrogen concentration exceeds 2%, immediately admit nitrogen to reduce the oxygen concentration to within limits.

c. hydrogen concentration exceeds 4% and the oxygen concentration exceeds 2%, immediately admit riitrogen to reduce the hydrogen concentration to within limits.
d. oxygen concentration exceeds 4% and the hydrogen concentration exceeds 2%, immediately admit nitrogen to reduce the hydrogen concentration to within limits.

60

USNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 6'I The following conditions exist:

Unit 2 is at 50% power, all equipment operable A large, unisolable instrument air leak occurs The operators manually trip the reactor when I/A ressure.reaches 50 ps19 Which of the following correctly describes Steam Generator water level trends and the reason for the trends immediately following the trip? Assume no operator action)

Steam Generator levels will:

increase to approximately BQ% NR, then decrease after the main feed reg valves close.

c/

6/

decrease due to main feed isolation valves failing closed.

c. increase to solid conditions due to no response from the main feedwater control syste
d. decrea e to normal post trip values as 15% bypass valves establish 5%

feed f(ow to each Steam Generator..

61

USNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 62 The following conditions exist: .

The Unit 1 reactor was manually tripped by the operators due to a rupture of the CCW N header Prior to stopping all RCPs, the 1A 125 VDC bus became de-energized Which of the following states the location where the RCPs can be most expeditiously tripped?

a. Trip 1A2 and 181 RCPs from the RTGB, trip 1A1 and182 RCPs locally at their respective breakers.
b. Trip 181 and 182 RCPs from the RTGB, trip 1A1 and 1A2 RCPs locally at their respective breakers.
c. Trip 1A1 and 182 RCPs from the RTGB, trip 1A2 and 181 RCPs locally at their respective breakers.
d. Trip "IA1 and 1A2 RCPs from fhe RTGB, trip 181 and 182 RCPs locally at their respective breakers.

62

USNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION QUEST(ON 63 Unit 2 is at 100% power. PIS-07-2A, containment pressure safety channel has failed high. Assuming no operator action, which one of the following conditions would cause Containment Spray pump(s) to start and borated water to be admitted into containment?

/

a. The 120 VAC MC Instrument Inverter trips due to an electrical fault.
b. The 2B 125 VDC bus de-energizes.
c. PIS-07-2C containment pressure safety channel drifts to 6 psig.
d. An IRC tech inadvertently injects a high containment pressure signal into the MB CSAS ESFAS channel.

63

0 E

USNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 64 The following conditions exist:

A plant shutdown was commenced 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> ago due to a power supply failure Operators are monitoring containment temperature The ANPS has instructed the operators to trip the reactor when containment temperature exceeds 120'F Which of the following is the power supply that has failed? (Assume all other plant equipment operable, consider each case separately)

a. 2A5 480V Load Center
b. 1A2 480V Load Center
c. 1AB 480V Load Center
d. 2A9 480V Load Center 64

USNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 65 A category 4 hurricane has caused an extended loss of offsite power at St. Lucie Plant.

One minute after the Emergency Diesel Generators started and loaded, the 2B 125VDC bus was lost. Which of the following correctly describe the status of the 2B Emergency Diesel Generator fuel oil system?

The 2B Emergency Diesel Generator will continue to run as fuel is supplied to the day tanks through the:

'I

a. normally open bypass valve.
b. failed open inlet valves.
c. energized inlet valves.
d. inlet valves if manually pinned open.

65

USNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 66 The following conditions exist:

. Unit 2 is at 100% power An instrument air leak has occurred at the instrument air accumulator on the 19.5'levation of the turbine building The leak has been isolated by a single isolation valve Service air and Instrument air have been crosstied Mechanical Maintenance is standing by to repair the leak Which of the following describes the minimum administrative requirements in this case that will allow Mechanical Maintenance to begin work?

a. A full Equipment Clearance Order must be issued prior to Mechanical Maintenance commencing work.
b. A Human Clearance can be put in place to allow Mechanical Maintenance to commence work.
c. A Cautio'n tag must be placed on the isolation valve prior to Mechanical Maintenance commencing work.
d. A deviation tag can be placed on the isolation valve and instrument air crosstie to allow Mechanical Maintenance to commence work.

66

USNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 67 A Unit 2 refueling outage was scheduled to begin on October 16th. The following are the sequence of events as they took place:

10-16 / 0900 Turbine tripped, breaker open 10-16 / 1030 Mode 2 entered 10-16 / 1200 Mode 3 entered 10-1 6 / 1400 ARI 10-17 / 0300 Mode 4 entered Which of the following is the earliest time the movement of fuel in the reactor vessel can commence?

a. I 0-19 / 0900
b. 10-18 / 1030
c. 10-1 9 / 1200
d. 10-20 / 0300 67

USNRC REACTOR OPERATOR INITIAL.LICENSE EXAMINATION QUESTION 68 Which of the following operator actions ~woo d require ANPS concurrence prior to taking the action? (Assume 100% power operation)

a. The desk RO manually trips the reactor because 2A steam generator level is 41% NR and decreasing.
b. The board RO performs an emergency boration due to two stuck out CEAs post trip.
c. The board RO takes manual control of the selected pressurizer pressure controller because it has failed high.

d.. The desk RO stops the 2A CCW pump during'a surveillance run because the ammeter indicates full scale and flow is decreasing.

6S

USNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 69 The following is the annual dose record for an individual:

. Committed Dose Equivalent (CDE) is 2525 mr Deep Dose Equivalent (DDE) is 2335 mr Lens Dose Equivalent (LDE) is 744 mr Committed Effective Dose Equivalent (CEDE) is 405 mr idlest Total Organ Dose Equivalent (TODE) is 4865 mr Shallow Dose Equivalent (SDE) is 435 mr Maximum Extremity Dose (ME) is 6565 mr.

itd itt i ~ i tt i Chid I' di iitd ~tti it d.

The individual:

a. has a margin of 2260 mr
b. has a margin of 2475 mr
c. has a margin of 2665 mr
d. has exceeded the NRC limit 69

USNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 70 Which, of the following conditions would require a Total Effective Dose Equivalent ALARAreview prior to issuing an RWP?

On any job that:

a. is to be performed in a Hot Particle Area.
b. requires a full face air purifying respirator.
c. neutron radiation is present.
d. noble gas is present and respirators will not be used.

70

USNRC REACTOR OPERATOR INITIALLICENSE EXAM(NATION QUESTION 71 A steam generator tube rupture has occurred on Unit 2 and the Emergency Plan is being implemented. The NPS (Emergency Coordinator) has declared a Site Area Emergency and is about to announce the evacuation of the owner controlled area.

Which of the following is the correct assembly area considering the wind direction given?

Wind direction from:

a. 135', evacuate to JayCee Park.
b. '78', evacuate to Jensen Beach Causway.
c. 175', evacuate to Jensen Beach Causway.
d. 225', evacuate to JayCee Park.

71

USNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 72 An unexpected annunciator has alarmed in the Control Room. According to AP-0010120, "Conduct of Operations", which of the following correctly describes the correct response of the RO in the vicinity of the control board?

Acknowledge the annunciator:

a. reset the annunciator, visually scan the annunciator panels to verify no othe'r alarms were received simultaneously.

V

b. visually scan the annunciator panels to verify no other alarms were received simultaneously, reset the annunciator.
c. reset the annunciator, notify the ANPS, NPS or other senior licensed individual fulfillingthe control room command function of the alarm received.
d. notify the ANPS, NPS or other senior licensed individual fulfillingthe control room command function of the alarm received, reset the annunciator.

72

USNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 73 According to 1-ONP-100.01, "Response to Fire", which of the following describes the procedural guidance in the event of a fire in the cable spreading room?'.

Use ~on1 A train equipment, B train equipment is considered unreliable during this event.

b. Use ~bo B and A train equipment, but A train equipment may be unreliable during this event.
c. Use ~on B train equipment, A train equipment is considered unreliable during this event.
d. Use ~bo A and B train equipment, but B train equipment may be unreliable during this event.

73

USNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 74 The following conditions exist:

Unit 2 is in the process of a power ascension following a refueling outage.

Generator output is 170 MW The transfer from single to sequential valve has just been completed The impulse feedback loop is IN SERVICE While withdrawing control rods for ASI control, a 30 second continuous rod withdrawal occurs until the RO places the CEDMCS panel in "Oft" No other operator action is taken and no reactor trip occurs Which one of the following parameters will return to essentially the same value as it was prior to the event?

a. RCS Tavg
b. Reactor Power
c. Pressurizer level
d. Steam Generator Pressure 74

VSNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 75 Unit 2 is in Mode 6, returning from a refueling outage. The RO is performing a valve stroke test on HCV-15-1, primary makeup water to containment isolation valve. After stroking the valve closed, it fails to reopen. Which of the following is an immediate concern if HCV-15-1 cannot be opened?

RMW is the source of water for:

a. pressurization of nozzle dams.
b. the fire protection system in containment.
c. makeup to the Quench Tank.
d. RCS makeup for fill and vent.

75

USNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION QUEST(ON 76 Comparing a B train CCW header rupture on BOTH units, which of the following components would be rendered inoperable?

a. B Containment Cooler
b. B LPSI pump
c. B Sample Heat Exchanger
d. B HPSI pump 76

USN RC REACTOR OPERATOR lNlTIALLlCENSE EXA'MINATlON QUESTION 77 The Unit 2 reactor has tripped from 50% power and SPTAs are in progress. The RO reports that RCS Heat Removal safety function is not being met. Which of the following conditions is the reason for the ROs report? (Assume no contingency actions have been taken. Consider each case independently)

a. RCS hot leg temperatures are 562'F, RCS cold leg temperatures are 527'F
b. Steam Generator pressures 935 psia.
c. RCS average temperature is 527'F.
d. Steam Generator levels are 37% WR with 1 Main Feedwater pump, supplying feed.

77

VSNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION

'll QUESTION 78 The Unit 1 RO is preparing to release the contents of the 1B waste'monitor tank. The Unit 1 Liquid Rad Waste Monitor (channel R-6627) appears to be failed low. Which of the following is a correct statement concerning the status of a pending liquid release?

a. The Plant General Manager must approve the release permit.
b. Two independent samples and release rate calculations must be performed prior to the release.
c. The liquid release can be performed using Unit 2 Liquid Rad Waste Monitor.
d. The liquid release cannot be performed until channel R-6627 is determined to be operable.

USNRC REACTOR OPERATOR INlTIALLlCENSE EXAMINATlON QUEST(ON 79 The following conditions exist; Unit 1 is at 100% power RCS pressure is 2250 psia Pressurizer Code Safety V-1201 develops a seat leak Quench tank pressure is 15 psig Assuming the leak increases until the quench tank pressure is discharged into containment, which of the following is approximately the highest indicated tailpipe temperature for V-1201 that will be seen by the RO? (Assume all equipment functions as designed)

a. 251'F
b. 316'F
c. 328'F
d. 338'F .

79

USNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 80 The following conditions exist:

Unit 1 is in Mode 5 RCS temperature is 190'F Shutdown Cooling is in service A large instrument air leak has occurred where the instrument air header enters the RAB Which of the following correctly describes the response of RCS.temperature as instrument air pressure degrades to 0 psig? (Assume no operator action)

RCS temperature will:

a. decrease as full SDC flow is passed through the SDC heat exchangers.
b. increase as CCW flow is isolated from the SDC heat exchangers.
c. decrease as full CCW flow is passed through the SDC heat exchangers.
d. increase as SDC flow is isolated from the SDC heat exchangers.

80

USNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION QUEST(ON 81 Unit 2 is implementing 2-EOP-4. Both Steam Generators have been identified as being faulted. Which of the following parameters will be the deciding factor as to which steam generator will be isolated?

a. Steam generator activity
b. Steam generator pressure c Steam generator level
d. Main steam line monitor activity 81

USNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 82 The following conditions exist:

Unit 1 is at 100% power Pressurizer level control channel X is selected for level control The low level cutout switch is selected to "Both" LT-1110X has failed low Which of the following correctly describes the response of the system if no operator action is taken?

Actual pressurizer level will:

a. increase, all heaters will de-energize and pressurizer pressure will be controlled by the main sprays.
b. decrease, all heaters will energize and pressurizer pressure will be controlled by the heaters.
c. increase, all heaters will energize and pressurizer pressure will be controlled by the heaters.
d. decrease, all heaters will de-energize and pressurizer pressure will be controlled by the main sprays.

82

USNRC REACTOR OPERATOR INITIALLICENSE EXAM!NATION QLIESTION 83 The following conditions exist:

Unit 2 is at 100% power The RO has just filled 281 SIT 2% using the 28 HPSI pump Chemistry has been notified to sample 281 SIT Performance Group has been notified to perform Data Sheet 25 of OP 2-0010125A, "Surveillance Data Sheets" Which of the following correctly describes the reason Data Sheet 25 is performed after filling 281 Safety Injection Tank?

To ensure no leakage leakage from the:

a. 281 SIT to the RWT
b. ECCS to the 281 SIT
c. RCS to the 281 S1T
d. RCS to the ECCS 83

USNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 84 The following conditions exist:

Unit 2 is in Hot Standby A loss of offsite power occurred two hours ago System reports that power could be unavailable for up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> The TSC has recommended a cooldown to shutdown cooling entry conditions If the procedurally recommended cooldown rate is used during this evolution, which of the following is'the approximate amount of condensate that will be used from time of trip to shutdown cooling entry conditions?

a. 73,000 gallons
b. 78,000 gallons 96,000 gallons d: 120,000 gallons 84

USNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 85 The following conditions exist:

Unit 2 tripped from 100'/o power due to a LOOP The 2A Emergency Diesel Generator tripped on overspeed SPTAs are complete Which one of the following is the method the board RO would use to maintain RCS heat removal from the PACB?

F

a. "A" atmospheric steam dump in Auto/Manual, "B" atmospheric steam dump in Auto/Manual.
b. "A" atmospheric steam dump in Manual/Manual, "B" atmospheric ste'am dump in Auto/Auto.
c. "A" atmospheric steam dump in Auto/Auto, "B" atmospheric steam dump in Manual/Manual.
d. "A" atmospheric steam dump in Auto/Auto, "B" atmospheric steam dump in Auto/Auto.

85

USNRC REACTOR OPERATOR IN1TIAL LICENSE EXAMINATION QUEST(ON 86 Which of the following describes the Unit 2-lncore Neutron Monitoring System?

The Unit 2 lncore Neutron Monitoring System consists of:

a. 225 Rhodium detectors and 45 Core Exit Thermocouples which both provide values that are printed out on the DDPS.
b. 280 Rhodium detectors and 56 Core Exit Thermocouples, only the Rhodium detectors provide values that are printed out on the DDPS.

I

c. 180 Rhodium detectors and 45 Core Exit Thermocouples which both provide values that are printed out on the DDPS.
d. 224 Rhodium detectors and 56 Core Exit Thermocouples, only the Rhodium detectors provide values that are printed out on the DDPS.

86

USNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 87 fgdil fig ill gfl gf ll I fl Area Radiation Monitor(s) went into high alarm?

fd~dfl if i ld a.. Fuel Pool Ventilation System

b. Control Room Ventilation System
c. Containment Purge Ventilation System
d. Reactor Auxiliary Building Ventilation System

USNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 88 Which of the following EOP directed evolutions would warrant the use of the "AB" bypass switch on the Unit 1'Auxiliary Feedwater System (AFW) portion of RTGB 102?

(Assume all plant equipment operable)

a. 'esetting AFW after steam generator levels have reached the AFAS reset level.
b. Manual initiation of AFAS after lockout when cooling down with an isolated steam generator.
c. Isolation of a steam generator when performing 1-EOP-99, Appendix R.
d. Placing the AFW system in service manually after a trip from low power and steam generator levels did not reach AFAS actuation setpoint. -.

USNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 89 The following conditions exist:

All feedwater on Unit 1 has been lost Both steam generators are dry Once through cooling is being implemented 1A Main Feedwater pump has been started and a flowpath to both steam generators is available Neither steam generator is faulted Which of the following correctly describes the action required to be taken by the control room crew rior o terminatin once throu h coolin ?

a. Feed both steam generators to 15% narrow range level.
b. Feed one steam generator to 15% narrow range level.
c. Feed both steam generators to 40% wide range level.
d. Feed one steam generator to 40% wide range level.

89

USNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 90 Unit 2 is at 100% power, steady state. Instrument air has been isolated to the CCW to letdown heat exchanger, temperature control valve (TCV-2223). Assuming no automatic or operator action, which of the following correctly describes the response of RCS temperature and the reason for the response?

RCS temperature will:

a. increase.due to higher CVCS temperature entering the CVCS ion exchangers.
b. decrease due to lower CVCS temperature entering the CVCS ion exchangers.
c. increase due to lower CVCS temperature entering the CVCS ion exchangers.
d. decrease due to higher CVCS temperature entering the CVCS ion exch angers.

90

USNRC REACTOR OPERATOR INITIALLICENSE EXA'MINATION QUESTION 91 l

Unit 2 is returning from a refueling outage and is in the process of a plant heatup. The.

RO has been instructed by the ANPS to start 2A1 RCP. The RO notifies the ANPS that yellow permissive light on the 2A1 RCP is not illuminated. Other than power to the

'he breaker, which of the following parameters are gteasured to ensure the RCP start permissive is enabled?

The 2A1 RCP must have sufficient:

a. oil lift pump flow and component cooling water flow.
b. component cooling water pressure and oil lift pump flow.
c. oil lift pump pressure and component cooling water pressure.
d. component cooling water flow and oil lift pump pressure.

91

\

USNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 92 The following conditions exist:

Unit 1 is at 85% power 181 Circulating Water pump (CWP) has tripped for an unknown reason The RO places the 181, Circulating Water pump control switch in the "pull-to;drain" position Which of the following describes the configuration of the 181 Circulating Water train after the "pull-to-drain" shutdown is complete?

a. 181 CWP discharge valve full open, 181 waterbox outlet valve closed.
b. 181 waterbox outlet valve open, 181 CWP discharge valve closed.
c. 181 CWP discharge valve full open, 181 waterbox outlet valve open.
d. 181 waterbox outlet valve closed, 181 CWP discharge valve 30% open.

92

VSNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 93 Unit 1 is in the process of a plant heatup. A bubble is being drawn in the pressurizer and level has just come on scale (98%). Which one of the following components is procedurally operated/manipulated and will dictate the rate of level decrease in the pressurizer during this evolution?

~

a. pressurizer spray

't

b. letdown level control valves
c. letdown backpressure control valves
d. charging pumps 93

VSNRC REACTOR OPERATOR INlTlALLlCENSE EXAMINATiON QVESTION 84 The following conditions exist:

Unit 1 is at 98% power, returning from a SNO The RO is withdrawing CEAs in manual individual from 133" to UEL The upper electrical limit reed switch for CEA ¹1 0 has failed Which of the following correctly describes the mechanism/signal in place to stop motion and prevent equipment damage as CEA ¹10 is fully withdrawn?

CEA ¹1 0 motion will be stopped by a:

a. back-up stop signal from the DDPS.
b. mechanical stop installed on the CEDM.
c. back-up stop signal from the CEAPDS.
d. second upper electrical limit reed switch.

USNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION QUEST(ON 95 Which of the following ventilation systems, if placed out of service for an extended period of time, would prohibit entry into containment at power?

a. Unit 1 Radioactivity Removal System (HVE 1 R 2)
b. Unit 2 Containment Purge System (2-HVE 8A K 8B)
c. Unit 1 Containment Purge System (1-HVE 8A K 8B)
d. Unit 2 Hydrogen Purge System (HVE 7A R 7B) 95

USNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION 0 QUESTION 96 The following conditions exist:

2B ICW pump has tripped from an electrical fault The ANPO has aligned the 2C ICW pump to the 2B ICW header 2C ICW pump has been started and is running 2B ICW pump control switch is in the pull-to-lock position No other operator actions have been performed If a Loss of Offsite Power were to occur with the ICW system in the present configuration, which of the following correctly describes the status of the 2C ICW pump after the Emergency Diesel Generators start and load on their respective busses?

2C ICW pump:

a. has automatically started and is being powered by the 2A Emergency Diesel Generator.
b. has not automatically started, and should not be manually started due to diesel loading concerns.
c. has automatically started and is being powered by the 2B Emergency Diesel Generator.
d. has not automatically started, and cannot be manually started until the AB power supply is realigned.

96

0 USNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 97 Unit 2 is in mode 5 preparing to drain the RCS for nozzle dam installation. According to 2-NOP-03.05, "Shutdown Cooling Normal Operation", shutdown cooling flow must be maintained at a MINIMUMof 3000 gpm to:

a. prevent shutdown cooling suction vortexing in the RCS hot legs.
b. ensure that both LPSI pumps flows are > 800 gpm.
c. prevent an RCS.dilution event.
d. ensure adequate. heat removal with minimum RCS inventory.

97

USNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 98 Which of the following conditions would cause FCV-15-7 and FC 8 (containment vacuum relief valves) to open? (Assume all plant equipment operating properly)

a. During a surveillance run of the Shield Building Ventilation System, annulus to containment QP reaches'4" H 0.

Instrument air to FCV-1 5-7 and~r CV-1 5-8 accumulators has been isolatecf.

c. An inadvertent Containment Spray actuation during normal operations has occurred and containment to annulus b,P reaches 3" H20.

r

d. 125 V DC power to to FCV-15-7 and FCV-15-8 solenoid valves has been

/

de-energized.

98

USNRC REACTOR OPERATOR lNITIALLtCENSE EXAMINATlON QUEST(ON 99 Unit1 is in Mode 6, core reloadin progress. Due to an Equipment Clearance Order error, instrument air to containment has been isolated. Which of the following would be, an immediate concern if instrument air is not restored?

a. Shutdown Cooling operation
b. Steam Generator nozzle dam integrity
c. Containment sump level indication
d. Fuel Movement 99

USNRC REACTOR OPERATOR INITIALLICENSE EXAMINATION QUESTION 100 The Site has been placed under a Hurricane Warning, and the NPS has declared an Unusual Event. He has tasked you, the Unit 1 RO, with making the State notification call. ALL phone lines are down due to high winds. White using the Hot Ring Down Phone, you get no response from State Warning Point (SWP). Which of the following is the next proper course of action in accordance with EPIP-02, "Duties and Responsibilities of the Emergency Coordinator" ?

Contact SWP via the:

a. Hot Ringdown Phone in the Unit 2 control room.
b. ENS phone in the Unit 1 control room.
c. ESATCOM system in the Unit 1 control room.
d. Local Government Radio in the Unit 1 control room.

100

~ ~

~

~ ~

~ ~

~ ~ I I Q  %

g ~

0 0 l l 1 k

~ 0 ~ ~ ~ ~ ~ ~ ~ ~ ~

~ 0 ~ ~ ~ 0 ~ ~ ~ ~ ~ ~ ~ ~ ~

~ ~

.m

~ ~

~ ~

~ ~ t ~ ~

I

~ ~ ~ ~ ~ ~

~ I 4 0 ~ ~ ~ ~ ~ ~

o II

U.S. Nuclear Regulatory Commission St. Lucie Nuclear Plant Reactor Operator Answer Key

1. A
2. D "3 A 4.'
5. D
6. D
7. D
8. C
10. C
11. D
12. C
13. B
14. C l5. A
16. A
17. B
18. C
19. D

U.S. Nuclear Regulatory Commission St. Lucie Nuclear Plant Reactor Operator Answer Key

20. B
23. D
24. B
25. B
26. D
27. B 28,A
29. B
30. C
32. A
33. C
34. D
35. D
36. B 8.
37. C 38

U.S. Nuclear Regulatory Co'mmission St. Lucie Nuclear Plant Reactor Operator Answer Key

39. B
40. A
42. C
43. A
47. D
48. A
49. D
50. D
52. C
53. C
54. C
55. C
56. C
57. B 58.A .

C h U.S. Nuclear Regulatory Commission St. Lucie Nuclear Plant Reactor Operator Answer Key

59. C
60. B 6J-C
62. A
63. C
64. B
65. D
66. A
69. A
70. B
71. C
72. B
73. B
74. B
75. B
76. D 77D ~
78. i'.

U.S. Nuclear Regulatory Commission St. Lucie Nuclear Plant Reactor Operator Answer Key

79. D
80. D
81. A
82. A 83.

D'4.

C (Reference needed for exam)

85. C
86. D
89. D
90. D
91. C
92. A
93. C
94. D
95. D
96. B
97. C y>rS 98, C ~~ g v~4c

U.S.'Nuclear Regulatory Commission St. Lucie Nuclear Plant Reactor Operator Answer Key

=p"- C15 25 3 545 553 cB- C7 8 9- 0

)0)

)1) )2) 3

'2) ca)

)4) $ ) 8- ~

)41 cs) ce) c7) ce)

8) 9) cp5 c45 C25 C45 C55 c75 c95 cg5 WRITE

)0) c

~ 1) 3) ~ cS) )8) ct) ca) c4) cs>> cd>> ctr c8>>

)P) cp5 c15 C25 C35 c45 c55 ct)3 c75 cB5 eg" c) c2) cs>> cp

)4) cs) M cp5 C$ 5 C25 C35 c45 C55 c55 c7 C95 cg" pe C$ 5 C2 5 "3 C45 e5" c5" c7" 585 cg-I.D.

NUMBER

)c

0) c 1) c2>> cs) ce) cl>> ca) cs)

)0) cl) c2) 3 c4) cS) ce>> c'7>>

)4) ~ ce) ct) ca)

~ )9)

)7) ca) cp c9) cp5 C I 5 C25 C35 c45 c55 c55 c75 095 cg5 HERE co>> clr

)0) cl) c2)

M

~

)3) c4>> ce) ce>> ct>> car cp c4) cS) ce) ct) c8) c9) wp5 C25 c35 c45 c55 c5 575 CB5 095 co) ca4w ca) )3) c4>> CS) ce) c7) ca) cp cp5 C$ 5 C25 C35 45 c55 555 c75 c85 cg5 MARK PART 1 I.D. CODE I.D. NUMBER AT LEFT BY FILLING IN cp C15 C'2 5 c3 45 a5 C55 c75 585 cg5 NUMBER THE APPROPRIATE BOXES ACCORDING TO cp5 C I 5 C25 C35 c45 c55 c55 C75 595 cg5 0

'ERE THE EXAMPLE.

Z Q I~

NKS c85 cC5 cP5 cf 5 c

SP e

NE c45 cB" CQ5 ygss CE5 51 0 CA5 c85 cC5 cE5 c45 c95 Bs)80 cQ5 cE5 5))

~

~

)7 ro no O 3 c85 cQ5 ep5 cE5 53 CA5 c85 cP5 cE5 O c45 cQ5 cp5 cf5 c45 c95 gd>>8) cP5 -cE5) r ~ e O 4 54 5 cA5 c85 cQ5 cE5 55 c45 c95 8)tcgt cP5 ef5 USE NO. 2 PENCII. ONLY 6 eA5 C95 cQ5 ~ eat cf 5 56 c45 c95 e)BI) cp5 CE51 cA5 c95 CQ5 CE5 57 c45 4)95>> cc5 cP5 CF5 ~ MAKE DARK MARKS cf 5 tadil>> c95 cQ5 CP5 cf5.

~

~~

8 c45 c85 ~ 5+ cP5 58 cf" ~ EXAMPLE: C45 CB. ep5 cf5 9 cA5 c85 cQ5 5g CA5 c85 cQ5 cf5 10 c45 c85 cQ5 cf5 6p cA5 cC5 cp5 cf5 I

~ ERASE COMPLETELY TO CHANGE I))

cA5 cA5 13 CA5 c85 cQ5 c85 ~ Cp CQ5 adgsr cC5 cp5 cE5 cf cE5 62 63

~ C95 CC5 CP5 'cf5 cA5 c85 ca@a cQ5 cE5 NAME 15 16~

~

14 CA5 095 585 cC5 cpc C95 cQ5 cp5 CP5 CE5 ef5 cE5 64 65 66 ~

045 <<gDa cQ5 cp5 CE5 cA5 c95 cQ" i

c95 cQ5 CQ5 cE5 cf5 SUBJECT c45 cf 5 cA5 CB5 CEpn ep5 -f5 17 18 1g c45 c95 CQ5 CP5 cp5 c f5 cA5 585 cQ5 ~ sgsa c E5 67 68 69~

~ C85 cQ5 cQ5 CE5*

e95 cQ5 Q5 cE5 HOUR DATE cf5 i

20 cA5

)I1 cA5 C9- CC5 cQ5 cQ5 CE5 22 4ctsn CB)5~ cD5 cf 5 cf 5 7P c45 71 eA5 C95 7)) c45

)898>>

~

cQ5 cp5 CQ5 cQ5 cQ5 cE5 cf5 KEY MARKING INSTRUCTIONS O 23 CA5 085 cQ5 73 cA5 cCC cQ5 cf 5 24 cA5 cQ5 cp5 cf5 74 cA'5 cQ5 cQ5 cE5

'l This form is used for:

0 cp5 cE5 a) Program Key 25 C45 CQ5 CE5 75 eA5 )>>Bn CQ 5 b) Test Answer Sheet I)6 cA5 c95 CC5 cf5 76 C45 c85 cQ5 cE5 27 CA5 cp5 ep5 cf5 77 aj5 cC5 CE5 When used as Program Key, you can control the results depending c95 cQ5 cQ5 cf5 cA5 <<e)o CQ5 CQ5 cf5 on which Key Boxes are marked.

28 ebs 78

))g C45 cQ5 cp5 cE5 79 045 c85 cQ5 c f5 cottaor 1 Cot)as) 2 01 30 cA5 c85 8)+2>> cQ5 cE 80 cA5 cQ5 cE5 NKS KEY c>>

Sr) c

)re c

KEY

)J<EY 80XFS 31 CA5 cC5 cQ5 CE5 S1~ e85 cQ5 CQ5 CE5 lcA) cg) cC- cD>> cE>> sl A- cB>> cC>> cD cE)&Mit80XES 32 cce>>s c85 cQ5 CP5 cE5 82~ c95 cQ5 cp5 cE5 Marking 8 Key Box or Combination of Key Boxes produces the 33 CA5 c95 cp5 cf- 83 cA5 c85 cC5 Cfn fogowing scoring and error marking results:

34 CA5 c95 cQ5 eOe cf5 84 CA5 c95 cp5 cE5'E5 NKS tto score printed on Key 35 cA5 c95 CQ5 CE5 S5 CA5 e95 CQ5 Cl i} 36 CA5 cQ5 cp5 cE5 86 CA5 c95 CQ5 CE5 KEY Prints score and error marks lor column 1.

Cl ii'r

~ 37 cA5 c85 cp:. cE5 87 cA5 c285) c Q 5 cD5 cf5 KEY NE Prints score for column 1 whh no enor marks.

38 c45 cQ5 cP5 cE5 88 cA5 c85 cp5 cE5 C2 1)

)) 39 cA5 cQ5 cQ" cE5 89 cA5 c85 CQ5 cE5 KEY Prints score and error marks lor column 2.

1) i 40~ c95 cQ5 cp5 cf5 gQ cA5 C95 cQ5 eggar CE5 C2 41 c45 CB5 4)) cA5 c 85 A

85gcc cD3 ef5 cp5 91 92 cA5 c85

<<)fifa cp5 595 cQ5 CQ5 CE5'f5 cf5 KEY NE Cl KEY KEY C2 prirrts score for column 2 with no error marks.

Prints total score and error marks lor columns 1 and 2.

CQ5 ap5 c85 cp5 Cl C2 43 eg)58 cB g3 CA5 KEY KEY NE Prints total score tor ootumrls 1 and 2 with no error marks.

c95 CQ5 cf5 94 C45 cb5 cC5 JEST cE5 Cl C2 cC5 cQ5 cE5 95 345 c9" CQ5 cf5 KEY KEY sp Prirrts separate scores tor columns 1 and 2 with no error marks.

cC5 cp5 CF5 96 c45 cC5 cp5 c f5 Atter marking the appropriate Key Boxes, mark correct answers on 8 CQ5 cf" 97 CA5 c95 Iaf>>ic>> cp5 cE5 your program key.

C85 cC5 eQ5 cE5 K-'t c

9 CC5

~

~i 4t cE5 gg eA C85 CQ5 t>>9)S CE5 5Q 545 c95 cQ5 cE5 IPP cA" c95 CQ5 cf5 (T) (F) (T) (F)

CO>> c1>> 23 C33 e43 "5 c5 C7>> C83 9 )0) 1) 2) 3 4) 5) 5 We Cd) 9 1 c0), .G27 c3) C47 cd>> cd7 ct) cd) cps- cga C2>> c3s c4>> c52 c7>> CB>> cgs 0) 2) C3) ece C57 Cd) C'l7 CS) CQ>

WNE 4 WRITE Lh cps cps c22 c3>> 4>> C5>> c{)a c7>> c52 c9>> c27. c3>> c47 c5>>ccd>> ct>> cd)-cQ 000I{EER 0 1.0. c0) c 1) c2) c37 )4) c5) We ct) cd) CQ cps cps c2>> 'c3>>'42 HERE 6 t52 t52 c72, tgs cga NUMBER c07 cl>> c27 c37>>c4>> cd>>. cd>>'ct>>'>>>>Se cQ 6 ~

pa e'Ia c2>> c3>> c4 C5>> cgs c7" cga c9>> HERE

>c

{>> )0) c 1) c2) c3) c4) W cd) ct) cd) cQ)

MARK c07 cl>>lc2>> W ) C4).cd)wd>>lct>>,.CS>> cd cps. cgs C2>> .c3>> -c4>> c52 cgs c72 CB>> cga 0) Cl) W ILL C37 Cc) Cd) Cd' Ct)>>CS) CQ NUMB GER 2 cps cga c2>> c3>> c4>> c5>> cga c7>> egs cgs C07 .We'27 C3'7" C47 C5>> Cd>> Ct>> CS)'CQ HERS 1 cps: c]a. C2>>.C3s= C4s-C5>> C5>> C7a. Cga)cga MARK PART 2 c5" C7>> cga cga I.O. CODE I.D. NUMBER AT LEFT BY FILLING I cps cga cps e33 c43 c5>> NUMBER THE APPROPRIATE BOXES ACCORDING TO cps- c1>> '2>> c3a =c4>>- s5>> "CB>>'>s7>>. cga. Cg>> HERE THE EXAMPLE.

NKS C1 SP NE C2 C C c 3 c

>{El 1p1 caa CB>> cC>> cpa cfa 151 cA>> cB>> cQ>> rps cfa 1pp cA>> -cB>> cC>> cD>> cE>>. 152 CA>> cB>> cC>> cps,.cfgs 1p3 caa cB>> cC>> cps cfs 153 cA>> cB>> cC>> cps cfs 104 (cA'{F.B>>..C ':: D.:.i 7 154 ~CA>> CB>> eQa, cQ>>".cfs, 105 *A B G D E* .155 cas cB>> eQ>> cps cfs 186'.caa)'cB>>%cQ>> .Cp~ac 2{ f 156 C4>> cBa CQ>> ccfa]

1p7 caa cB>> CC>> cps cfs 157 cas cBa cQ>> cps cfa 188-.caa CB)s +CQ>>';tpa -'cf 2, 158'caa cB>> rC>> cpa~cp>>I 1pg cas cB>> cC>> cps cfs 159 eaa cB>> cQa cpa cE>>

11p (CA>>~cB>> CCs A)CD>>50CE>>l 16p {cas cB>> CC>> >cpa~sf>>'!

111 cA>> cB>> cC>> cpa cfs 161 cas cB>> cQ>> cpa cfs

~

112 cAa,cBa cC>> cD>> CE>> ]6) eaa cB>> cQ>> cpa, sf>>'I 113 cas cB>> cQ>> cpa cfs 163 cas cB>> cQa CDa cEa 114=caaecB>>-cC>> cD>>-cE>>'15 164 'caa cB>> clQ>> cps~re f>>>>

ca- cB>> cQ>> cQ>> cfa 165 caa CB>> cQ>> cP>> cE>>

116caa'cB>> .cQa,,cQ>> cf a. 166 1:Aa cBa cQa cp>> cfa) 117 cas cB>> cQ>> cpa cfs 167 cA" cBa cC>> cD>> cps 118'cA>> CB>>. CC>>\ 7 CD>> e CE>>

~

168 cA>> cB>> cQ>> CQa;. cE>>'69

{ll caa cB>> cC>> cps cfa O 119 cas cB>> cQ>> CP>> cfa V 12p.caa tB>> cQa cpa-.'cfs 17P caa cBa cQ>> cQa rfaj Ch cAa cBa cC>> cD>> CE>> 171 cas cB>> cC>> cpa cfa E>> 12) cA>> "CB>>,'CC>> cD>>, cEa ]7{0 caa cB>> cQ>> rps cfa{

3 cf 3 123 caa cB>> cQ>> CQ>> 173 cA>> CB>> cQ>> CQ>> cfs O

V 0

124-caa cB>> cQ>> cP>> cf 2 174 iaa cBa cQ>> cDa CE>>

1'{05 cas cB>> eQ>> cQ cfs 175 cA>> cB>> CQ>> CQs cfs 1I)6.caa cBa CQ>> cQ>> cf s 176 cAa cB>> cQ>> epa*cfsj 127 cA>> cB>> CC" cD>> cE>> 177 CA>> cB>> cQ>> cD>> cE>>

128 cA>> cB>> cC>> CD>> cE>>" 178 cA>>" cB>> cQa CD>> cEa; 129 caa cB>> cQ>> cP>> cfs 179 caa cB>> cQ>> cP>> cE>>

13P cas cB>> cC>> CP>> cE>> 18P caascB>> cQa cpa CEa!

131 cA>> cB>> CC>> CD>> CE>> 181 caa cBs cQ>> cD>> cfs 1340:saa .CB>> CC>> 'CD>> 'CE>> 182 saa CB>> cQ>> cQ>> -cf 2>

133 caa cB>> CC>> cD>> cE>> 183 cA>> cB>> cQ>> cQ>> CE>>

1341cAa cB>> cC>> CD>> cE>> 184 eaa cB>> cQa cD>>'E>>> Please refer to key 135 cas cB>> cQ>> cQ" cfa 185 caa cB>> cQ>> cPa cE>>

136 caa CB>> CC>>" CD>> CE>> cas cBa cQ>> cD>> 'CE>> marking instructions 137 CA>> CB>> CC>> cD>> cE>> 187 CA>> CB>> CC>> cP>> cf 3 on front.

138.tao~ CB>> tQa "CQ>> cfa= caa CB>> cQa cDa cfa, 139 caa cB>> cQ>> cpa cf>> 189 caa CB>> cC>> cP>> cE>>

14p .sas cB>> cQ>> cQ>> cps 1gp cas CB>> cQ>> cps sf>>

141 caa cB>> CQs cp>> cfs 191 cas cB>> cQ>> cPa cE>>

14)-ca>> CB>>-.

CQ>> cpa cpa ]92,caa cB>> cQ>> cD>> cE>>

143 cas cB>> cQ cp" cf>> 193 cA>> CB>> cQ>> cpa cfs 144~as-cB>> CC>> cp>> cps 1g4 CA>>,~s cC>> cD>> cE>>'P>>

145 eas B>> cQa cQa cfa 1g5 caa CB>> cQ>> cfa 146!cA>> cB>> cC>> cD>> cE>>. 196 cas cB>> cQs cP>> cf ac 147 cA" CB>> cC>> cD>> cEa 197 cas cB>> cC>> cps cE>>

148 caa CB>> cQ>> cQa cfa 1g8 caa CB>> cQ>> cDa cE>>

149 cA>> cB- cQs cps cf" 199 cA cB>> cQ" CPa c f3 15P caa cB>> CQ>> Qa cfa 2pp caa cB>> cQ>> cD>> cfa (T) (F) (T) (F)