05000275/FIN-2013004-02

From kanterella
Revision as of 22:47, 27 September 2017 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
02
Site: Diablo Canyon Pacific Gas & Electric icon.png
Report IR 05000275/2013004 Section 4OA3
Date counted Sep 30, 2013 (2013Q3)
Type: NCV: Green
cornerstone Mitigating Systems
Identified by: Self-revealing
Inspection Procedure: IP 71153
Inspectors (proximate) L Carson
N O
'Keefe W
Sifre T
Hipschman J
Laughlin B
Parks I
Anchondo L
Micewski C
Hal
Violation of: 10 CFR 50 Appendix B Criterion V

Technical Specification

Technical Specification - Procedures
CCA H.12, Avoid Complacency
INPO aspect QA.4
'