05000275/FIN-2013003-01
From kanterella
Jump to navigation
Jump to search
Finding | |
|---|---|
| Title | Failure to Effectively Implement the Fire Protection Program |
| Description | The inspectors identified a Green non-cited violation of the licensees approved fire protection program as defined in Diablo Canyon Facility Operating License Conditions 2.C(5) for Unit 1 and 2.C(4) for Unit 2 involving the failure to effectively implement the fire protection program. Specifically, the inspectors identified multiple examples where the licensee failed to maintain control and tracking of combustible materials, welding equipment, and oxygen/acetylene rigs in the plant. The licensee entered the condition into the corrective action program as Notifications 50510062, 50511864, 50561959, and 50537650. The failure to effectively implement all fire prevention controls and processes as required in the approved fire protection program was a performance deficiency. The performance deficiency was more than minor because it was associated with the protection against external events (fire) attribute of the Initiating Events Cornerstone and it adversely affected the cornerstone objective of limiting the likelihood of events that upset plant stability and challenge critical safety functions. Using Inspection Manual Chapter 0609, Appendix F, Fire Protection Significance Determination Process, the inspectors concluded that the finding was of very low safety significance (Green) because each deficiency was rated as Low degradation because for the violations of the hot work permitting program, all normally required fire prevention measures remained in place and for the violations of the transient combustibles control program, the materials involved did not significantly increase the fire frequency. This finding had a cross-cutting aspect in the area of human performance associated with the work practices component, because the cause of the performance deficiency involved the licensee not ensuring supervisory and management oversight of work activities, such that nuclear safety was supported. |
| Site: | Diablo Canyon |
|---|---|
| Report | IR 05000275/2013003 Section 1R05 |
| Date counted | Jun 30, 2013 (2013Q2) |
| Type: | NCV: Green |
| cornerstone | Initiating Events |
| Identified by: | NRC identified |
| Inspection Procedure: | IP 71111.05 |
| Inspectors (proximate) | C Osterholtz D Strickland L Micewski N O'Keefe T Farina T Hipschman |
| Violation of: | License Condition - Fire Protection License Condition |
| CCA | H.2, Field Presence |
| INPO aspect | LA.2 |
| ' | |
Finding - Diablo Canyon - IR 05000275/2013003 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Finding List (Diablo Canyon) @ 2013Q2
Self-Identified List (Diablo Canyon)
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||