| | Q | CCA | Title |
|---|
| 05000275/FIN-2012004-01 | 2012Q3 | H.14 | Inadequate Corrective Actions to Update the Final Safety Analysis Report Update with Required Information |
| 05000275/FIN-2012404-01 | 2012Q3 | H.2 | Security |
| 05000275/FIN-2012404-02 | 2012Q3 | | Security |
| 05000275/FIN-2012005-01 | 2012Q4 | P.2 | Failure to Perform Operability Evaluation |
| 05000275/FIN-2012005-02 | 2012Q4 | H.14 | Non-conservative Decision Making Resulted in a Violation of Technical Specification |
| 05000275/FIN-2012005-03 | 2012Q4 | H.7 | Failure to Update Emergency Operating Procedures |
| 05000275/FIN-2012008-01 | 2012Q4 | H.7 | Failure to Maintain Required Firewater System Configuration |
| 05000275/FIN-2012008-02 | 2012Q4 | | Inadequate Compensatory Measures for Fire Protection Program Deficiencies |
| 05000275/FIN-2012008-03 | 2012Q4 | | Review of Operational Implementation |
| 05000275/FIN-2012008-04 | 2012Q4 | | Failure to maintain the fire protection program design basis documents |
| 05000275/FIN-2013002-01 | 2013Q1 | H.8 | Failure to Provide Adequate Guidance to Address General Welding Standard Requirements |
| 05000275/FIN-2013002-02 | 2013Q1 | | Failure to Identify Existing Indications During Prior Ultrasonic Examinations of Pressurizer Structural Weld Overlays |
| 05000275/FIN-2013002-03 | 2013Q1 | H.14 | Failure to Effectively Evaluate Design Change for High Voltage Bushing |
| 05000275/FIN-2013003-01 | 2013Q2 | H.2 | Failure to Effectively Implement the Fire Protection Program |