IR 05000275/2013404

From kanterella
Jump to navigation Jump to search
IR 05000275-13-404 and 05000323-13-404, on 12/02/2013, Diablo Canyon Power Plant, NRC Security Inspection Report
ML14008A073
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 01/07/2014
From: Mark Haire
Plant Support Branch-1
To: Halpin E
Pacific Gas & Electric Co
References
IR-13-404
Download: ML14008A073 (3)


Text

UNITE D S TATE S NUC LEAR RE GULATOR Y C OMMI S SI ON ary 7, 2014

SUBJECT:

DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NRC SECURITY INSPECTION REPORT 05000275/2013404 AND 05000323/2013404

Dear Mr. Halpin:

On December 2, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Diablo Canyon Power Plant, Units 1 and 2, and the NRC inspector discussed the results of this inspection with Mr. M. Priebe, Director, Security, and other members of your staff. The inspector documented the results of this inspection in the enclosed inspection report.

No NRC-identified or self-revealing findings were identified during this inspection.

However, the inspector documented two licensee-identified violations which were determined to be of very low safety significance. The NRC is treating these violations as non-cited violations consistent with Section 2.3.2 of the Enforcement Policy.

If you contest the violations or significance of the NCVs, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U. S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at Diablo Canyon Power Plant, Units 1 and 2.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information - Withhold from Public Disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1).

In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Sincerely,

/RA/

Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos.: 50-275; 50-323 License Nos.: DPR-80; DPR-82 Nonpublic Enclosure:

NRC Inspection Report 05000275/2013404 and 05000323/2013404 w/Attachment: Supplemental Information cc w/o enclosure:

Electronic Distribution for Diablo Canyon Power Plant, Units 1 and 2 ML14008A073 Cover Letter Only Non Sensitive Publicly Available SUNSI Review JLB Sensitive JLB Non-Publicly Available JLB KEYWORD: SUNSI Review Complete Entire Report Non Sensitive Publicly Available SUNSI Review JLB Sensitive JLB Non-Publicly Available JLB KEYWORD: MD 3.4 Non-Public A.3 PSI:PSB1 PSI:PSB1 C:PSB1 C:PBA C:PSB1 JBuchanan MBrooks MHaire NOkeefe MHaire

/RA/ /RA/ /RA/ /RA/ /RA/

1/6/14 1/6/14 1/7/14 1/7/14 1/7/14