ML100680062

From kanterella
Revision as of 21:32, 23 August 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Brunswick, Units 1 and 2 - Operating Test and Withdrawal Examination Reference Materials for Licensed Operator Initial Examinations 50-325-10-301 and 50-324-10-301
ML100680062
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 02/19/2010
From: Mentel P N
Progress Energy Carolinas
To:
Document Control Desk, NRC/RGN-II
References
BSEP 10-0025 IR-10-301
Download: ML100680062 (5)


See also: IR 05000324/2010301

Text

Progress Energy FEB 192010 SERIAL: BSEP 10-0025 U. S. Nuclear Regulatory

Commission

ATTN: Document Control Desk Washington, DC 20555-0001

Subject: Brunswick

Steam Electric Plant, Unit Nos. 1 and 2 Renewed Facility Operating

License Nos. DPR-71 and DPR-62 Docket Nos. 50-325 and 50-324 Operating

Test and Written Examination

Reference

Materials

for Licensed Operator Initial Examination

50-325/2010-301

and 50-324/2010-301

Reference:

Letterfrom

Malcolm T. Widmann (NRC) to Benjamin C. Waldrep (CP&L),"Brunswick

Steam Electric Plant -Notification

of Licensed Operator Initial Examination

05000325/2010301

and 05000324/2010301," dated December 4, 2009, ADAMS Accession

Number ML093380120

Dear Mr. Reyes: In accordance

with the guidelines

in Revision 9, Supplement

1, of NUREG-1021,"Operator

Licensing

Examination

Standards

for Power Reactors," Carolina Power & Light Company (CP&L), now doing business as Progress Energy Carolinas, Inc., is providing

the examination

reference

materials

supporting

the operating

test which is scheduled

to be administered

during the weeks of April 5 and April 12, 2010, and the written examination

scheduled

to be administered

during the week of April 19, 2010, respectively.

In accordance

with the schedule contained

in the NRC's letter datedDecember

4, 2009, a list of the examination

materials

and reference

materials

is provided in Enclosure

1.Copies of Examiner Standard Forms and Checklists

from ES-201 and ES-401 are provided in Enclosure

2. A copy of the written examination

is provided in Enclosure

3. Copies of the simulator

dynamic scenarios

and Job Performance

Measures (JPMs) are provided in Enclosure

4. Copies of the reference

materials

are provided in Enclosure

5 (i.e., on a CD-ROM).Enclosures

2, 3, 4, and 5 are being provided only to Mr. Richard Baldwin, the assigned NRC chief examiner, with his copy of this letter. In accordance

with Revision 9, Supplement

1, of NUREG- 1021, Section ES-20 1, "Initial Operator Licensing

Examination

Process," please ensure that the examination

materials

and reference

materials

are withheld from public disclosure

until after the examination

is complete.Progress Energy Carolinas, Inc.Brunswick

Nuclear Plant PO Box 10429 Southport, NC 28461

-q t.Mr. Luis A. Reyes, Regional Administrator

BSEP 10-0025 / Page 2 No regulatory

commitments

are contained

in this letter. Please refer any questions regarding

this submittal

to Mr. Bob Bolin, Nuclear Operations

Training Instructor, at (910) 457-3078, or Mr. Lenny Beller, Superintendent.-

Operations

Training, at (910) 457-2073.Sincerely, Phyllis N. Mentel Manager -Support Services Brunswick

Steam Electric Plant WRM/wrm Enclosures:

1. List of Examination

Materials

and Reference

Materials 2. Examiner Standard Forms and Checklists

3. Written Examination

Questions 4. Simulator

Scenarios

and Job Performance

Measures (JPMs)5. Reference

Materials (CD-ROM)

Mr. Luis.A. Reyes, Regional Administrator

BSEP 10-0025 / Page 3 cc (with Enclosures

1 through 5): U. S. Nuclear Regulatory

Commission, Region II ATTN: Mr. Rick Baldwin Senior Operations

Engineer Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, GA 30303-8931

cc (without Enclosure

1 Only): U. S. Nuclear Regulatory

Commission

ATTN: Document Control Desk Washington, DC 20555-0001

U. S. Nuclear Regulatory

Commission, Region II ATTN: Mr. Malcolm T. Widmann Chief, Operations

Branch Sam Nunn Atlanta Federal Center.61 Forsyth Street, SW, Suite 23T85 Atlanta, GA 30303-8931

U. S. Nuclear Regulatory

Commission

ATTN: Mr. Philip B. O'Bryan, NRC Senior Resident Inspector 8470 River Road Southport, NC 28461-8869

U. S. Nuclear Regulatory

Commission (Electronic

Copy Only)ATTN: Mrs. Farideh E. Saba (Mail Stop OWFN 8G9A)11555 Rockville

Pike Rockville, MD 20852-2738

Chair -North Carolina Utilities

Commission

P.O. Box 29510 Raleigh, NC 27626-0510

$ II BSEP 10-0025 Enclosure

1 Page 1 of 2 List of Examinations

Materials

and Reference

Materials The following

documents, developed

in accordance

with NUREG- 1021, Revision 9, Supplement

1, "Operator

Licensing

Examination

Standards

for Power Reactors," are provided in Enclosure

2: Form ES-301-1 Administrative

Topics Outline Form ES-301-2 Control Room/In-Plant

Systems Outline Form ES-301-3 Operating

Test Quality Checklist Form ES-301-4 Simulator

Scenario Quality Checklist Form ES-301-5 Transient

and Event Checklist Form ES-301-6 Competencies

Checklist Form ES-401-6 Written Examination

Quality Checklist Enclosure

3 provides the proposed written examination (i.e., 75 "common" questions, 25 senior reactor operator (SRO) questions).

Enclosure

4 provides the Simulator

Dynamic Scenarios

(5) and Job Performance

Measures (i.e., Administrative, In-plant, and Simulator).

Enclosure

5 provides the following

reference

materials

on two CD-ROMs: Index of Provided Procedures

Abnormal Operating

Procedures (AOP)Administrative

Instructions (Al)Administrative

Procedures (AP)Alternate

Safe Shutdown (ASSD)Annunciator

Procedures (APP)Brunswick

Big Notes Calibration

Procedures (CAL)Emergency

Procedures (EMG)Emergency

Operating

Procedures (EOP)Engineering

Procedures (ENP)Environmental

and Radiation

Control Procedures (E&RC and EVC)Fuel Handling Procedures (FH)Fire Protection

Procedures (FPP)General Plant Procedures (GP)Maintenance

Procedures (NMNT)Measuring

Test Equipment

Procedures (MTE)Nuclear Generation

Group Procedures (NGGC)Operating

Procedures (OP)Operating

Instructions

(01)Operating

Work Packages (OWP)Periodic Tests (PT)Plant Emergency

Procedures (PEP)Plant Surveillance

Test Procedures (PST)

BSEP 10-0025 Enclosure

1 Page 2 of 2 Pre-Fire Plans (PFP)Regulatory

Procedures (LIC and REG)Security Procedures (SEC)System Descriptions (SD)Training Procedures (TRN)Technical

Specifications

Technical

Specifications

Bases Technical

Requirements

Manual Offsite Dose Calculation

Manual (ODCM)