ML102460152

From kanterella
Revision as of 07:23, 21 August 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
PV-2009-11-Draft SRO Operating Test Outlines
ML102460152
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 11/02/2009
From: Garchow S M
Operations Branch IV
To:
Arizona Public Service Co
References
Download: ML102460152 (3)


Text

ES-301, Page 22 of 27ES-301Administrative Topics OutlineForm ES-301-1Facility: _______________________________ Date of Examination: _____________Examination Level: RO SRO Operating Test Number: __________

Administrative Topic (see Note)

Type Code*Describe activity to be performed Conduct of Operations Conduct of Operations Equipment Control

Radiation Control

Emergency Procedures/Plan lNOTE:All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.* Type Codes & Criteria:(C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs & RO retakes)(N)ew or (M)odified from bank ( 1)(P)revious 2 exams ( 1; randomly selected)

ES-301, Page 23 of 27ES-301Control Room/In-Plant Systems OutlineForm ES-301-2Facility: _____________________________ Date of Examination: ______________Exam Level: RO SRO-I SRO-U Operating Test No.: _______________

Control Room Systems

@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF) System / JPM TitleType Code*Safety Function a.b.

c.

d.

e.

f.

g.

h.

In-Plant Systems

@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U) i.j.k.@All RO and SRO-I control room (and in-plant) syst ems must be different and serve different safetyfunctions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.* Type Codes lCriteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature l(L)ow-Power / Shutdown(N)ew or (M)odified from bank including 1(A)

(P)revious 2 exams (R)CA (S)imulator 4-6 / 4-6 / 2-3 9 / 8 / 4 1 / 1 / 1 - / - / 1 (control room system) l 1 / 1 / 1 2 / 2 / 1 3 / 3 / 2 (randomly selected) 1 / 1 / 1 ES-301, Page 23 of 27ES-301Control Room/In-Plant Systems OutlineForm ES-301-2Facility: _____________________________ Date of Examination: ______________Exam Level: RO SRO-I SRO-U Operating Test No.: _______________

Control Room Systems

@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF) System / JPM TitleType Code*Safety Function a.b.

c.

d.

e.

f.

g.

h.

In-Plant Systems

@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U) i.j.k.@All RO and SRO-I control room (and in-plant) syst ems must be different and serve different safetyfunctions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.* Type Codes lCriteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature l(L)ow-Power / Shutdown(N)ew or (M)odified from bank including 1(A)

(P)revious 2 exams (R)CA (S)imulator 4-6 / 4-6 / 2-3 9 / 8 / 4 1 / 1 / 1 - / - / 1 (control room system) l 1 / 1 / 1 2 / 2 / 1 3 / 3 / 2 (randomly selected) 1 / 1 / 1