MONTHYEARML23100A1072023-04-10010 April 2023 Framatome Part 21 Report Re Erroneous Change of State for Circuit Breaker ML22019A1762021-12-28028 December 2021 Lake Engineering Company - Interim Notification Per 10 CFR Part 21: Degraded Snubber SF1154 Hydraulic Fluid Batch No . 18CLVS431 ML21306A1802021-10-28028 October 2021 United Controls International - Part 21 Notification for York Pin: TCM-1 a Temperature Control Modules ML18078A5362018-01-31031 January 2018 Crane Nuclear, Inc. - Interim Report for 10 CFR Part 21 Investigation Report Notification of Xomox Plug Valve High Torsional Stress in Stem (Update) ML17173A1392017-06-0909 June 2017 Engine Systems, Inc. - Transmittal of 10CFR21 Reporting of Defects and Non-Compliance - Report No. 10CFR21-0117, Rev. 0 ML17165A4072017-06-0909 June 2017 Part 21 Report - Defective Motor Operated Potentiometer ML16278A4712016-09-22022 September 2016 Notification of 10 CFR Part 21 Condition, Masterpact Breaker Fail to Close ML16281A2702016-09-22022 September 2016 Part 21 - Initial Notification of Masterpact Breaker Fail to Close ML16252A2742016-08-29029 August 2016 Azz/Nli - Part 21 Report - Potential Allen Bradley Timing Relay ML16243A4742016-08-26026 August 2016 Potential Part 21 Unqualified Component in Certain Allen Bradley Timing Relays ML16232A6042016-08-15015 August 2016 Potentially Unqualified Component in Certain Allen Bradley Timing Relays ML16238A1862016-08-15015 August 2016 Update - Report of Potential l0CFR Part 21, Allen Bradley Timing Relay Model 700RTC-NRC Event Number 51030, Accession Number ML15134A016 ML16188A3742016-06-30030 June 2016 Part 21 - Inadequate Swaging and Adherence of Silicone O-Ring and Silicone PAD Soft Seat Main Disc and Pilot Disc Assemblies ML16154A2072016-05-26026 May 2016 Part 21, Azz/Nli Nuclear Logistics, Inc., Potentially Unqualified Component in Certain Allen Bradley Timing Relays Model 700RTC ML16194A1992016-05-25025 May 2016 Azz/Nli - Update - Report of Potential 10CFR Part 21, Allen Bradley Timing Relay Model 700RTC ML16139A8332016-05-13013 May 2016 Part 21 - Initial Notification of Masterpact Breaker Fail to Close ML16139A8322016-05-13013 May 2016 Part 21 - Initial Notification of Masterpact Breaker Fail to Close ML16111A4202016-04-0808 April 2016 Part 21 Report No. P21-04302015, Rev. 1 Regarding Potentially Unqualified Component in Certain Allen Bradley Timing Relays, Per Browns Ferry, Ginna, Millstone, Nine Mile Point, North Anna, Ft. Calhoun, Perry, River Bend, South Texas Project ML15134A0162015-05-0101 May 2015 Part 21 Report Regarding Potentially Unqualified Component in Certain Allen Bradley Timing Relays ML15159A5682015-04-30030 April 2015 Report of Potential 10CFR Part 21, Allen Bradley Timing Relay Model 700RTC ML15103A2442015-04-0606 April 2015 Part 21 Report - Deviation of Hk Circuit Breaker Close Latch Spring ML15049A4582015-02-0606 February 2015 Thermo Gamma-Metrics, LLC - Part 21 Report Regarding Shutdown Margin Monitor Environmental Qualification Noncompliance ML15022A6502015-01-20020 January 2015 Letter from Steven R. Eisenberg USNRC 10CFR Part 21 Notification ML13233A2852013-08-0606 August 2013 Final Report in Accordance with 10 CFR Part 21 Re Material Non-Conformance at South Texas Project ML13165A3422013-06-12012 June 2013 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML13116A3032013-04-23023 April 2013 Notification of Potential Part 21 Report Re ESI Refurbished Emergency Diesel Generator Cylinder Heads May Have Valve Keeper Seals Missing ML13079A3202013-03-18018 March 2013 Notification of Potential Part 21 Interim Report Re Possible Deviation or Defect in Nuclear Qualified High Efficiency Particulate Air Filters ML12352A1232012-12-13013 December 2012 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML12348A1362012-12-13013 December 2012 Part 21 60-Day Interim Report Notification: Adequacy of Design Change in Am Magne-Blast Circuit Breakers ML12094A3712012-04-0202 April 2012 Part 21 Report - Rosemount Pressure Transmitters with Nonzero Based Calibrations ML12075A1062012-03-14014 March 2012 Notification of Potential Part 21 Re Defect on Arvan Electrical Terminal Blocks ML12097A3162012-03-0202 March 2012 Part 21 Report - Rosemont Pressure Tranmitters Out of Tolerance Condition ML12066A1182012-03-0202 March 2012 Part 21 Report - Rosemount Pressure Transmitters with Nonzero Based Calibrations ML12058A1412012-02-23023 February 2012 Part 21 Report - Rosemount Nuclear Instruments, Inc., Pressure Transmitter with Nonzero Based Calibrations ML11363A1882011-12-0202 December 2011 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR21-0098, Rev. 3, Amot Thermostatic Valve Element P/N: 9760X ML11336A3692011-12-0101 December 2011 Notification of Potential Part 21 Interim Report on Thermostatic Valve Failure on Palo Verde EDG ML1109701512011-04-0101 April 2011 Interim Report on Thermostatic Valve Failure on Palo Verde EDG ML1029501912010-09-30030 September 2010 Abb Inc., 10CFR Part 21 Notification of Potential Defect, 27H Relay, 411R0175-DP-1E and 411R0175-1E ML1027704182010-09-30030 September 2010 Part 21 Report on Solid State Relays ML0934301402009-12-0202 December 2009 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 1OCFR21-0098, Rev. 0, Amot Thermostatic Valve Element, P/N: 9760X ML0926802462009-09-23023 September 2009 Notification of Potential Part 21 on Reportable Occurrence Under 10 CFR Part 21: Firmware Anomaly in the Model RM-80 Radiation Monitoring System ML0907611882009-03-11011 March 2009 Part 21 Notification - Defective Hk and K-Line Circuit Breaker Tension Springs ML0831900172008-11-12012 November 2008 Notification of Potential Part 21 on All Dimensionally Verified Commercial Grade Items Processed Per Fisher Manufacture Procedure Fmp 2K28 ML0823901062008-08-25025 August 2008 Notification of Potential Part 21 on Failure of F and G Switches NOC-AE-08002253, Report of Unsatisfactory Blind Testing Results in Fitness for Duty Program2008-01-0909 January 2008 Report of Unsatisfactory Blind Testing Results in Fitness for Duty Program ML0734402112007-12-0707 December 2007 Deficiency Report Part 21 Potential Insufficient Thread Engagement for Certain Pressure Transmitters ML0732000862007-11-0909 November 2007 Notification of Potential Part 21 Report Conval Valves Weld Qualifications ML0504503912005-02-10010 February 2005 Event Report from Framatome Anp, Defective Component, SIS Control Wire 2023-04-10
[Table view] |
Text
A8BBB September 30, 2010 Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 FAX 301-816-5151
Subject:
10CFR Part 21 Notification of Potential Defect, 27H Relay, 41 1R0175-DP-1E and 411R0175-1E
Dear Sir or Madam:
This letter is submitted in accordance with 10 C.F.R § 21.21(d)(3)(ii) with respect to a failure to comply with the specifications associated with the Type 27H 411 R0175-DP-1E and 411 R0175-1E relays.The notifying individual is Mr. Pat Wilkinson, General Manager, ABB Inc. (Distribution Automation), 4300 Coral Ridge Rd, Coral Springs FL, 33065.The identification of the subject relay is as follows: 27H 411R0175-DP-lE and 411R0175-IE relays. The failure to comply centers around the improper installation of a jumper installed at location R38 (H) on the relay's main printed circuit board ("PCB"). The jumper leads did not extend far enough beyond the plane of the board to ensure proper connection.
The jumper enables the relay to provide a high-speed, instantaneous trip. If there is an improperly installed jumper, the input value of an operational amplifier is unpredictable and may possibly cause unexpected target and trip.North Central Electric notified ABB on August 23, 2010 and stated that the 27H relay (catalog number 411 RO 175) trip indication flags were set on the relays after they were powered up for some time. After return of the relays to ABB, our inspection indicated that eleven of the twelve relays exhibited improper jumper installation.
On September 9, 2010, the ABB technician concluded that the failures were likely due to the improper installation of the jumper leads. The manufacturing timeframe of these suspect relays occurred between October 1, 2009 to September 9, 2010. The timeframe was determined based on when the jumpers were installed at ABB's Coral Springs facility.
The installation of suspect jumpers did not follow the guidelines set forth in IPC-A-610, paragraph 7.5.3, which requires the lead to protrude beyond the land within the specified minimum and maximum length. The printed circuit board assemblies
("PCBAs")
were manufactured for ABB by an outside supplier; however, those PCBAs did not include any jumpers. The root cause of this issue was determined to result from inadequate guidance on the part of the ABB assemblers for the position of the jumper, insufficient direction on the PCB drawing for the location of the jumper, and inadequate guidance for inspectors with respect to the inspection of jumpers. ABB has completed a draft of an Engineering Change Request ECR 2010-1624 to aid our supplier on the correct positioning of the jumpers. The jumpers will be installed by our supplier in accordance with ECR 2010-1624 once it is approved by our Engineering Manager.ABB Inc.4300 Coral Ridge Drive Coral Springs, FL 33065 Distribution Automation PHONE (954) 752-6700 FACSIMILE (954) 345-5329 ABB is taking, or has taken, the following corrective actions: e Notification of the potential existence of this deviation to affected customers (to complete by October 1, 2010).* Reviewed all shop floor open orders to ensure product was inspected prior to shipment. (completed on September 9, 2010)* Revise production testing form to include inspection of leads per IPC-A-610 paragraph 7.5.3. (complete by September 30, 2010)9 Provide training to inspectors and testers on the additional inspection requirements (to be complete by October 4, 2010)* The two solder operators for the solid state product line will complete the J-STD-001 solder training. (to be completed by October 4, 2010)* Receiving inspection test plans updated to inspect jumpers (completed on September 13, 2010)e Conduct training with entire shop floor personnel on PC Board Assembly Standards (to complete on September 29, 2010)o Work Instruction to be generated on how to inspect for correct installation of the jumper (to be complete by October 1, 2010)The customers and their affected purchase orders affected are listed below: ABB Inc. Florence, SC -Purchase orders 4500180141 (1 each, serial number: 19458) and 4500183444 (1 each, serial number: 19427)e End User: STP Nuclear Operating Company ABB Korea, 513 Sungsung Dong -Purchase Order 4500112151 (9 each, serial numbers 19382, 19388, 19389, 19392 Thru 19397)0 End User: KHNP Shinwolsung NPP ABB will provide written guidance on how to inspect for a properly installed jumper with the customer notification.
If defects are found, the units can be returned to ABB Coral Springs for repair and recertification.
If you have any questions regarding this notice, please contact the Quality Manager, Mr. Chad Buchwalter, directly at (954) 825-0604.Very truly yours, Pat Wilkinson General Manager ABB Inc.4300Coral Ridoe Drive Distribution Automation PHONE (954) 752-6700 Coral Springs, FL 33065 FACSIMILE (954) 345-5329