ML110070503

From kanterella
Revision as of 05:46, 15 August 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
2011/01/07 Diablo Canyon Lr - Draft Agenda for ACRS Subcomitte Meeting
ML110070503
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 01/07/2011
From:
Office of Nuclear Reactor Regulation
To:
Division of License Renewal
References
Download: ML110070503 (3)


Text

1 DiabloCanyonNPEm Resource From: Ferrer, Nathaniel Sent: Friday, January 07, 2011 1:43 PM To: Grebel, Terence Cc: DiabloCanyonNPEm Resource

Subject:

Draft Agenda for ACRS Subcomitte Meeting Attachments:

SC - Diablo Canyon Agenda_draft.docTerry, Attached is the draft of the Agenda for the ACRS Subcommittee Meeting for DCPP License Renwal. Please note the bulleted topics are just examples, being used as placeholders. Please provide feeback regarding you r proposed topics of discussion, and the list of speakers.

Thank you,

NathanielFerrerProjectManagerDivisionofLicenseRenewalOfficeofNuclearReactorRegulationU.S.NuclearRegulatoryCommission(301)415 1045 Hearing Identifier: DiabloCanyon_LicenseRenewal_NonPublic Email Number: 2401 Mail Envelope Properties (26E42474DB238C408C94990815A02F09270BFBF39B)

Subject:

Draft Agenda for ACRS Subcomitte Meeting Sent Date: 1/7/2011 1:42:37 PM Received Date: 1/7/2011 1:43:27 PM From: Ferrer, Nathaniel Created By: Nathaniel.Ferrer@nrc.gov Recipients: "DiabloCanyonNPEm Resource" <DiabloCanyonNPEm.Resource@nrc.gov>

Tracking Status: None "Grebel, Terence" <TLG1@pge.com>

Tracking Status: None Post Office: HQCLSTR01.nrc.gov

Files Size Date & Time MESSAGE 493 1/7/2011 1:43:27 PM SC - Diablo Canyon Agenda_draft.doc 50170 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received: ADVISORY COMMITTEE ON REACTOR SAFEGUARDS Plant License Renewal Subcommittee Meeting Diablo Canyon Power Plant February 9, 2011 Rockville, MD

- Proposed Agenda -

Cognizant Staff Engineer: Michael Benson, michael.benson@nrc.gov , (301) 415-6396 Topics Presenters Time Opening Remarks Dennis Bley, ACRS 1:30 pm - 1:35 pm Staff Introduction NRR 1:35 pm - 1:40 pm PG&E Company - Diablo Canyon Power Plant Introductions Description of Site and Plant Operating History License Renewal Application Overview Inaccessible Power Cables (Confirmatory Item) Buried Piping Program (Open Item) Mark 1 Containment PG&E 1:40 pm - 3:00 pm Break 3:00pm -3:15pm NRC Staff SER Overview Scoping and Screening Results Onsite Inspection Results Aging Management Review Time Limited Aging Analyses Nathaniel Ferrer, NRR Region IV 3:15 am - 4:35 pm Subcommittee Discussion Dennis Bley, ACRS 4:35 pm - 5:00 pm NOTE: During the meeting, 301-415-7360 should be used to contact anyone in the ACRS Office. Presentation time should not exceed 50 percent of the total time allocated for a given item. The remaining 50 percent of the time is reserved for discussion. Thirty five (35) hard copies of each presentation or handout should be provided to the Designated Federal Official 30 minutes before the meeting. One (1) electronic copy of each presentation should be emailed to the Designated Federal Official 1 day before the meeting. If an electronic copy cannot be provided within this timeframe, presenters should provide the Designated Federal Official with a CD containing each presentation at least 30 minutes before the meeting.