ML112440204

From kanterella
Revision as of 09:08, 3 August 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Report 22 - Watts Bar
ML112440204
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 09/01/2011
From:
Reactor Projects Region 2 Branch 6
To:
Shared Package
ML112440204 List:
References
IR-11-006
Download: ML112440204 (2)


Text

Inspection / Activity PlanPage 1 of 209/01/201108:53:19Report 2209/01/2011

-12/31/2012UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteWatts BarOL EXAM-INITIAL EXAM PREP 51 WATTS BAR / OCTOBER 2011 EXAM AT POWER FACILITIESV2336209/19/201109/23/2011OL EXAM-INITIAL EXAM - WEEK 1 51 WATTS BAR / OCTOBER 2011 EXAM AT POWER FACILITIESV2336210/17/201110/21/2011PSB1EP-EMERGENCY PREPAREDNESS EXERCISE 21 IPExercise Evaluation711140110/17/201110/21/20111 IPEmergency Action Level and Emergency Plan Changes711140410/17/201110/21/20111 IPDrill Evaluation711140610/17/201110/21/2011OL EXAM-INITIAL EXAM - WEEK 2 41 WATTS BAR / OCTOBER 2011 EXAM AT POWER FACILITIESV2336210/24/201110/28/2011TI-177-TI-177 GAS INTRUSION 31 IPManaging Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System2515/17712/12/201112/16/2011CDBI-COMPONENT DESIGN BASES INSPECTION 61 IPComponent Design Bases Inspection711112101/09/201201/13/20121 IPComponent Design Bases Inspection711112101/30/201202/03/20121 IPComponent Design Bases Inspection711112102/13/201202/17/20121 IPComponent Design Bases Inspection711112102/27/201203/02/2012MODS-MODIFICATIONS INSPECTION 31 IPEvaluations of Changes, Tests, or Experiments and Permanent Plant Modifications7111117T05/21/201205/25/20121 IPEvaluations of Changes, Tests, or Experiments and Permanent Plant Modifications7111117T06/04/201206/08/2012EB3 HS-TRIENNIAL HEAT SINK INSPECTION 11 IPHeat Sink Performance7111107T06/04/201206/08/2012PSB1-RP-PUBLIC RADIATION SAFETY BASELINE 31 IPRadioactive Gaseous and Liquid Effluent Treatment71124.0609/10/201209/14/20121 IPRadiological Environmental Monitoring Program71124.0709/10/201209/14/20121 IPRadioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0809/10/201209/14/20121 IPPerformance Indicator Verification7115109/10/201209/14/2012PSB1-RP-RADIOLOGICAL HAZARD ANALYSIS 11 IPRadiological Hazard Assessment and Exposure Controls71124.0109/10/201209/14/2012PI&R-PROBLEM IDENTIFICATION AND RESOLUTION 51 IPProblem Identification and Resolution71152B10/09/201210/12/20121 IPProblem Identification and Resolution71152B10/22/201210/26/2012PSB1EP-EMERGENCY PREPAREDNESS INSPECTION 11 IPAlert and Notification System Testing711140210/15/201210/19/2012This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.

Inspection / Activity PlanPage 2 of 209/01/201108:53:19Report 2209/01/2011

-12/31/2012UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteWatts BarPSB1EP-EMERGENCY PREPAREDNESS INSPECTION 11 IPEmergency Preparedness Organization Staffing and Augmentation System711140310/15/201210/19/20121 IPEmergency Action Level and Emergency Plan Changes711140410/15/201210/19/20121 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140510/15/201210/19/20121 IPPerformance Indicator Verification7115110/15/201210/19/2012OL RQ-REQUAL INSPECTION 21 IPLicensed Operator Requalification Program7111111B11/19/201211/23/2012This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.