Inspection / Activity Plan Page 1 of 2 09/01/2011 08:53:19 Report 22 09/01/2011 - 12/31/2012 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Watts Bar OL EXAM

- INITIAL EXAM PREP 5

1 WATTS BAR / OCTOBER 2011 EXAM AT POWER FACILITIES V23362 09/19/2011 09/23/2011 OL EXAM

- INITIAL EXAM - WEEK 1 5

1 WATTS BAR / OCTOBER 2011 EXAM AT POWER FACILITIES V23362 10/17/2011 10/21/2011 PSB1EP

- EMERGENCY PREPAREDNESS EXERCISE 2

1 IP Exercise Evaluation 7111401 10/17/2011 10/21/2011 1

IP Emergency Action Level and Emergency Plan Changes 7111404 10/17/2011 10/21/2011 1

IP Drill Evaluation 7111406 10/17/2011 10/21/2011 OL EXAM

- INITIAL EXAM - WEEK 2 4

1 WATTS BAR / OCTOBER 2011 EXAM AT POWER FACILITIES V23362 10/24/2011 10/28/2011 TI-177

- TI-177 GAS INTRUSION 3

1 IP Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System 2515/177 12/12/2011 12/16/2011 CDBI

- COMPONENT DESIGN BASES INSPECTION 6

1 IP Component Design Bases Inspection 7111121 01/09/2012 01/13/2012 1

IP Component Design Bases Inspection 7111121 01/30/2012 02/03/2012 1

IP Component Design Bases Inspection 7111121 02/13/2012 02/17/2012 1

IP Component Design Bases Inspection 7111121 02/27/2012 03/02/2012 MODS

- MODIFICATIONS INSPECTION 3

1 IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 05/21/2012 05/25/2012 1

IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 06/04/2012 06/08/2012 EB3 HS

- TRIENNIAL HEAT SINK INSPECTION 1

1 IP Heat Sink Performance 7111107T 06/04/2012 06/08/2012 PSB1-RP

- PUBLIC RADIATION SAFETY BASELINE 3

1 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 09/10/2012 09/14/2012 1

IP Radiological Environmental Monitoring Program 71124.07 09/10/2012 09/14/2012 1

IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 09/10/2012 09/14/2012 1

IP Performance Indicator Verification 71151 09/10/2012 09/14/2012 PSB1-RP

- RADIOLOGICAL HAZARD ANALYSIS 1

1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 09/10/2012 09/14/2012 PI&R

- PROBLEM IDENTIFICATION AND RESOLUTION 5

1 IP Problem Identification and Resolution 71152B 10/09/2012 10/12/2012 1

IP Problem Identification and Resolution 71152B 10/22/2012 10/26/2012 PSB1EP

- EMERGENCY PREPAREDNESS INSPECTION 1

1 IP Alert and Notification System Testing 7111402 10/15/2012 10/19/2012 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Inspection / Activity Plan Page 2 of 2 09/01/2011 08:53:19 Report 22 09/01/2011 - 12/31/2012 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Watts Bar PSB1EP

- EMERGENCY PREPAREDNESS INSPECTION 1

1 IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 10/15/2012 10/19/2012 1

IP Emergency Action Level and Emergency Plan Changes 7111404 10/15/2012 10/19/2012 1

IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 10/15/2012 10/19/2012 1

IP Performance Indicator Verification 71151 10/15/2012 10/19/2012 OL RQ

- REQUAL INSPECTION 2

1 IP Licensed Operator Requalification Program 7111111B 11/19/2012 11/23/2012 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure