ML15357A203

From kanterella
Revision as of 17:14, 8 July 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Commission Memorandum and Order (CLI-15-27)
ML15357A203
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 12/23/2015
From: Vietti-Cook A L
NRC/SECY
To:
Beyond Nuclear
SECY RAS
References
50-341-LR, ASLBP 14-933-01-LR-BD01, CLI-15-27, RAS 28701
Download: ML15357A203 (4)


Text

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION

COMMISSIONERS:

Stephen G. Burns, Chairman Kristine L. Svinicki William C. Ostendorff

Jeff Baran In the Matter of DTE ELECTRIC COMPANY Docket No. 50-341-LR (Fermi Nuclear Power Plant, Unit 2)

CLI-15-27 MEMORANDUM AND ORDER Beyond Nuclear moves to reopen the record of this proceeding to admit a new contention challenging the adequacy of the draft supplemental environmental impact statement (SEIS) prepared in connection with the subject license renewal application. Beyond Nuclear seeks to lodge a "placeholder" contention that challenges the NRC's reliance, in the draft SEIS, on the 2014 Continued Storage Rule and associated Generic Environmental Impact Statement

for Continued Storage.

1 As Beyond Nuclear acknowledges, it s request is substantively identical 1 See Beyond Nuclear's Hearing Request and Petition to Intervene in License Renewal Proceeding for Fermi Unit 2 Nuclear Power Plant (Dec. 4, 2015); Beyond Nuclear's Motion to Reopen the Record of License Renewal Proceeding for Fermi Unit 2 Nuclear Power Plant (Dec. 4, 2015) (Motion). The Staff and DTE oppose Beyond Nuclear's request.

See NRC Staff Answer to Beyond Nuclear's Hearing Request and Petition to Intervene and Motion to Reopen the Record in the License Renewal Proceeding for Fermi Unit 2 Nuclear Power Plant (Dec. 11, to several motions that we have rejected in other reactor licensing proceedings.

2 For the reasons articulated in those decisions, we likewise deny Beyond Nuclear's motion. IT IS SO ORDERED.

For the Commission

NRC SEAL

/RA/

___________________________ Annette L. Vietti-Cook Secretary of the Commission

Dated at Rockville, Maryland, this 23rd day of December 2015.

2015); DTE Electric Company Answer Opposing Petition to Intervene and Motion to Reopen (Dec. 21, 2015).

2 Motion at 2; see Union Electric Co. (Callaway Plant, Unit 1), CLI-15-11, 81 NRC 546 (2015);

DTE Electric Co. (Fermi Nuclear Power Plant, Unit 3), CLI-15-12, 81 NRC 551 (2015);

see also Duke Energy Carolinas, LLC (William States Lee III Nuclear Station, Units 1 and 2), CLI-15-15, 81 NRC 803 (2015).

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of ) )

DTE ELECTRIC COMPANY ) Docket No. 50-341-LR

)

(Fermi 2) )

) (License Renewal)

CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing COMMISSION MEMORANDUM AND ORDER (CLI-15-27) have been served upon the following persons by Electronic Information Exchange.

Atomic Safety and Licensing Board Panel Mail Stop - T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Ronald M. Spritzer, Chair

Administrative Judge E-mail: ronald.spritzer@nrc.gov Gary S. Arnold

Administrative Judge

E-mail: gary.arnold@nrc.gov Nicholas G. Trikouros

Administrative Judge

E-mail: nicholas.trikouros@nrc.gov Nicole Pepperl, Law Clerk E-mail: nicole.pepperl@nrc.gov

Office of Commission Appellate

Adjudication U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

E-mail: ocaamail@nrc.gov U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop O-15D21 Washington, DC 20555-0001 Catherine Kanatas, Esq.

Brian Harris, Esq.

Edward Williamson, Esq. Jeremy Wachutka, Esq. Joseph Lindell, Esq.

John Tibbetts, Paralegal

Email: catherine.kanatas@nrc.gov brian.harris@nrc.gov

edward.williamson@nrc.gov jeremy.wachutka@nrc.gov joseph.lindell@nrc.gov john.tibbetts@nrc.gov

U.S. Nuclear Regulatory Commission Office of the Secretary of the Commission Mail Stop O-16C1 Washington, DC 20555-0001

Hearing Docket

E-mail: hearingdocket@nrc.gov

FERMI 2 (Docket No. 50-341-LR) COMMISSION MEMORANDUM AND ORDER (CLI-15-27) 2 DTE Energy Company One Energy Plaza, 688 WCB

Detroit, MI 48226 Bruce R. Maters, Assistant General Counsel Jon P. Christinidis, Esq.

E-mail: matersb@dteenergy.com christinidisj@dteenergy.com

Counsel for the Applicant:

Winston & Strawn, LLP 1700 K Street, NW Washington, DC 20006-3817

Tyson R. Smith, Esq.

Carlos L. Sisco, Paralegal E-mail: trsmith@winston.com csisco@winston.com

Intervenor: Citizens' Resistance At Fermi 2 (CRAFT)

Jessie Pauline Collins

17397 Five Points Street Redford, MI 48240 E-mail: jessiepauline@gmail.com

Intervenors: Don't Waste Michigan, Citizens Environment Alliance of Southwestern Ontario and Beyond Nuclear

Terry J. Lodge, Esq.

316 N. Michigan St., Ste. 520 Toledo, OH 43604-5627 Email: tjlodge50@yahoo.com Michael Keegan Don't Waste Michigan 811 Harrison Street Monroe, Michigan 48161

E-mail: mkeeganj@comcast.net Kevin Kamps Beyond Nuclear 6930 Carroll Avenue, Ste. 400

Takoma Park, MD 20912

E-mail: kevin@beyondnuclear.org

[Original signed by Herald M. Speiser ] Office of the Secretary of the Commission

Dated at Rockville, Maryland, this 23 rd day of December, 2015 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION

COMMISSIONERS:

Stephen G. Burns, Chairman Kristine L. Svinicki William C. Ostendorff

Jeff Baran In the Matter of DTE ELECTRIC COMPANY Docket No. 50-341-LR (Fermi Nuclear Power Plant, Unit 2)

CLI-15-27 MEMORANDUM AND ORDER Beyond Nuclear moves to reopen the record of this proceeding to admit a new contention challenging the adequacy of the draft supplemental environmental impact statement (SEIS) prepared in connection with the subject license renewal application. Beyond Nuclear seeks to lodge a "placeholder" contention that challenges the NRC's reliance, in the draft SEIS, on the 2014 Continued Storage Rule and associated Generic Environmental Impact Statement

for Continued Storage.

1 As Beyond Nuclear acknowledges, it s request is substantively identical 1 See Beyond Nuclear's Hearing Request and Petition to Intervene in License Renewal Proceeding for Fermi Unit 2 Nuclear Power Plant (Dec. 4, 2015); Beyond Nuclear's Motion to Reopen the Record of License Renewal Proceeding for Fermi Unit 2 Nuclear Power Plant (Dec. 4, 2015) (Motion). The Staff and DTE oppose Beyond Nuclear's request.

See NRC Staff Answer to Beyond Nuclear's Hearing Request and Petition to Intervene and Motion to Reopen the Record in the License Renewal Proceeding for Fermi Unit 2 Nuclear Power Plant (Dec. 11, to several motions that we have rejected in other reactor licensing proceedings.

2 For the reasons articulated in those decisions, we likewise deny Beyond Nuclear's motion. IT IS SO ORDERED.

For the Commission

NRC SEAL

/RA/

___________________________ Annette L. Vietti-Cook Secretary of the Commission

Dated at Rockville, Maryland, this 23rd day of December 2015.

2015); DTE Electric Company Answer Opposing Petition to Intervene and Motion to Reopen (Dec. 21, 2015).

2 Motion at 2; see Union Electric Co. (Callaway Plant, Unit 1), CLI-15-11, 81 NRC 546 (2015);

DTE Electric Co. (Fermi Nuclear Power Plant, Unit 3), CLI-15-12, 81 NRC 551 (2015);

see also Duke Energy Carolinas, LLC (William States Lee III Nuclear Station, Units 1 and 2), CLI-15-15, 81 NRC 803 (2015).

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of ) )

DTE ELECTRIC COMPANY ) Docket No. 50-341-LR

)

(Fermi 2) )

) (License Renewal)

CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing COMMISSION MEMORANDUM AND ORDER (CLI-15-27) have been served upon the following persons by Electronic Information Exchange.

Atomic Safety and Licensing Board Panel Mail Stop - T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Ronald M. Spritzer, Chair

Administrative Judge E-mail: ronald.spritzer@nrc.gov Gary S. Arnold

Administrative Judge

E-mail: gary.arnold@nrc.gov Nicholas G. Trikouros

Administrative Judge

E-mail: nicholas.trikouros@nrc.gov Nicole Pepperl, Law Clerk E-mail: nicole.pepperl@nrc.gov

Office of Commission Appellate

Adjudication U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

E-mail: ocaamail@nrc.gov U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop O-15D21 Washington, DC 20555-0001 Catherine Kanatas, Esq.

Brian Harris, Esq.

Edward Williamson, Esq. Jeremy Wachutka, Esq. Joseph Lindell, Esq.

John Tibbetts, Paralegal

Email: catherine.kanatas@nrc.gov brian.harris@nrc.gov

edward.williamson@nrc.gov jeremy.wachutka@nrc.gov joseph.lindell@nrc.gov john.tibbetts@nrc.gov

U.S. Nuclear Regulatory Commission Office of the Secretary of the Commission Mail Stop O-16C1 Washington, DC 20555-0001

Hearing Docket

E-mail: hearingdocket@nrc.gov

FERMI 2 (Docket No. 50-341-LR) COMMISSION MEMORANDUM AND ORDER (CLI-15-27) 2 DTE Energy Company One Energy Plaza, 688 WCB

Detroit, MI 48226 Bruce R. Maters, Assistant General Counsel Jon P. Christinidis, Esq.

E-mail: matersb@dteenergy.com christinidisj@dteenergy.com

Counsel for the Applicant:

Winston & Strawn, LLP 1700 K Street, NW Washington, DC 20006-3817

Tyson R. Smith, Esq.

Carlos L. Sisco, Paralegal E-mail: trsmith@winston.com csisco@winston.com

Intervenor: Citizens' Resistance At Fermi 2 (CRAFT)

Jessie Pauline Collins

17397 Five Points Street Redford, MI 48240 E-mail: jessiepauline@gmail.com

Intervenors: Don't Waste Michigan, Citizens Environment Alliance of Southwestern Ontario and Beyond Nuclear

Terry J. Lodge, Esq.

316 N. Michigan St., Ste. 520 Toledo, OH 43604-5627 Email: tjlodge50@yahoo.com Michael Keegan Don't Waste Michigan 811 Harrison Street Monroe, Michigan 48161

E-mail: mkeeganj@comcast.net Kevin Kamps Beyond Nuclear 6930 Carroll Avenue, Ste. 400

Takoma Park, MD 20912

E-mail: kevin@beyondnuclear.org

[Original signed by Herald M. Speiser ] Office of the Secretary of the Commission

Dated at Rockville, Maryland, this 23 rd day of December, 2015