Category:Letter
MONTHYEARML24289A0312024-11-0808 November 2024 – Issuance of Amendments Related to the Removal of License Condition 2.F as Part of the Consolidated Line-Item Improvement Process (CLIIP) IR 05000416/20240032024-11-0606 November 2024 Integrated Inspection Report 05000416/2024003 IR 05000416/20240112024-10-16016 October 2024 – Fire Protection Team Inspection Report 05000416/2024011 ML24263A2712024-09-19019 September 2024 Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements IR 05000416/20240122024-09-17017 September 2024 License Renewal Post Approval Phase 2 Inspection Report 05000416/2024012 ML24257A0172024-09-17017 September 2024 Request for Withholding Information from Public Disclosure Unit 1 ML24254A3602024-09-10010 September 2024 Pre-Submittal Slides for License Amendment Request, Criticality Safety Analysis, Technical Specification 4.3.1, Criticality and Technical Specification 5.5.14, Spent Fuel Storage Rack Neutron Absorber Monitoring Program IR 05000416/20244022024-09-0909 September 2024 Security Baseline Inspection Report 05000416/2024402 05000416/LER-2024-003, Feedwater Inlet Check Valve Incorrectly Determined Operable2024-08-26026 August 2024 Feedwater Inlet Check Valve Incorrectly Determined Operable ML24235A0832024-08-22022 August 2024 Evaluations Performed in Accordance with 10 CFR 50.54(q) for Changes to Emergency Planning Documents IR 05000416/20240052024-08-21021 August 2024 Updated Inspection Plan for Grand Gulf Nuclear Station (Report 05000416/2024005) ML24220A2642024-08-20020 August 2024 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML24185A1522024-08-13013 August 2024 Issuance of Amendment Nos. 334, 235, and 215, Respectively, to Revise TSs to Adopt TSTF-205 IR 05000416/20240022024-07-29029 July 2024 Integrated Inspection Report 05000416/2024002 ML24176A1202024-07-29029 July 2024 Issuance of Amendment 234 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b ML24172A2502024-07-29029 July 2024 – Issuance of Amendment No. 233 Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML24204A2432024-07-23023 July 2024 Notification of Cyber Security Baseline Inspection and Request for Information (05000416/2024403) ML24191A2432024-07-0909 July 2024 Completion of License Renewal Activities Prior to Entering the Period of Extended Operations IR 05000416/20240102024-06-27027 June 2024 Biennial Problem Identification and Resolution Inspection Report 05000416/2024010 ML24156A1762024-06-24024 June 2024 Regulatory Audit Summary in Support of License Amendment Requests to Adopt TSTF-505, Revision 2 and 10 CFR 50.69 (Epids L-2023-LLA-0081 and L-2023-LLA-0080) ML24165A1512024-06-13013 June 2024 Second Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b and Application to Adopt 10 CFR 50.69, Risk-Informe ML24163A2652024-06-11011 June 2024 Inservice Inspection Summary Report ML24060A2192024-05-30030 May 2024 Authorization of Alternative to Use EN-RR-01 Concerning Proposed Alternative to Adopt Code Case N-752 05000416/LER-2024-002, Automatic Actuation of Reactor Protection System2024-05-28028 May 2024 Automatic Actuation of Reactor Protection System ML24128A1512024-05-0909 May 2024 Project Manager Assignment ML24130A0912024-05-0909 May 2024 Request for Information Letter License Renewal Phase 2 Inspection ML24128A0422024-05-0707 May 2024 License Amendment Request to Remove Obsolete License Conditions IR 05000416/20240012024-05-0202 May 2024 Integrated Inspection Report 05000416 2024001 ML24122C6112024-05-0101 May 2024 Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf. ML24116A0372024-04-25025 April 2024 Report of Technical Specification Bases Changes ML24113A0972024-04-22022 April 2024 Annual Report of Individual Monitoring - NRC Form 5 for 2023 Per 1 0 CFR 20.2206 ML24113A0952024-04-22022 April 2024 Annual Radioactive Effluent Release Report for 2023 ML24107B0402024-04-16016 April 2024 Notification by Entergy Operations, Inc., of Proposed Economic Performance Incentive and Reliance on Post-Event Improvements in Plant Procedures And/Or Methods of Operation in FERC ML24107A8872024-04-16016 April 2024 2023 Annual Radiological Environmental Operating Report (AREOR) ML24101A3882024-04-10010 April 2024 Response to Request for Confirmation of Information by the Office of Nuclear Reactor Regulation Proposed Alternative Request EN-RR-22-001 Risk-Informed Categorization and Treatment for Repair ML24100A0692024-04-0909 April 2024 Report of Changes or Errors to 10 CFR 50.46 Analysis ML24094A0992024-04-0303 April 2024 (GGNS) Core Operating Limits Report (COLR) Cycle 25, Revision O ML24089A2262024-03-29029 March 2024 Entergy Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Exams 05000416/LER-2024-001, High Pressure Core Spray Inoperable Due to Minimum Flow Valve Failure to Close2024-03-27027 March 2024 High Pressure Core Spray Inoperable Due to Minimum Flow Valve Failure to Close ML24075A1712024-03-15015 March 2024 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML24074A2892024-03-14014 March 2024 Proof of Financial Protection (10 CFR 140.15) IR 05000416/20230062024-02-28028 February 2024 Annual Assessment Letter for Grand Gulf Nuclear Station - Report 05000416/2023006 ML24058A3512024-02-28028 February 2024 Notification of Biennial Problem Identification and Resolution Inspection and Request for Information IR 05000416/20233012024-02-26026 February 2024 NRC Examination Report 05000416-2023301 05000416/LER-2023-002, Reactor Scram Due to Generator Stator Fault to Ground2024-02-13013 February 2024 Reactor Scram Due to Generator Stator Fault to Ground ML24043A1892024-02-12012 February 2024 Spent Fuel Storage Radioactive Effluent Release Report for 2023 ML24012A1422024-01-31031 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0051 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24043A0732024-01-29029 January 2024 2024-01 Post Examination Comments IR 05000416/20230042024-01-25025 January 2024 Integrated Inspection Report 5000416/2023004 IR 05000416/20234012024-01-18018 January 2024 Cyber Security Inspection Report 05000416/2023401 (Public) 2024-09-09
[Table view] |
Text
April 11, 2017 Mr. James Nadeau, Regulatory Assurance Manager Entergy Operations, Inc.
Grand Gulf Nuclear Station P.O. Box 756 Port Gibson, MS 39150
SUBJECT:
GRAND GULF NUCLEAR STATION - RESPONSE TO REQUEST FOR COMPONENT DESIGN BASIS INSPECTION EXTENSION
Dear Mr. Nadeau:
Referring to your letter, dated February 24, 2017, in which you requested a change in the Component Design Basis inspection (CDBI) from planned start date of September 11, 2017, to a new proposed date of August 20, 2018.
The Component Design Basis Inspection had been performed using Inspection Procedure 71111.21 and included three on-site weeks. Effective January 2017, this inspection procedure was revised and given the designation of 71111.21M and titled as the Design Basis Assurance (DBA) inspection. This major revision included a reduction in the number of components inspected and a change in the criteria for selecting components to include permanent plant modifications. A corresponding reduction in the number of inspection hours and a reduction in the time spent on-site from three weeks to two weeks was made.
The current inspection schedule for the Grand Gulf Nuclear Station shows the DBA inspection on-site weeks as the week of September 11, 2017, and the week of September 25, 2017, with the last day on-site of Friday, September 29, 2017.
We understand the basis for your request to reschedule the DBA inspection to August of 2018.
As discussed in our telephone conversations on March 8, 2017, and April 10, 2017, we offered options for exchanging DBA inspection dates with other Region IV facilities. Upon further consideration, this proved to be not practical and we agreed to keep the Grand Gulf Nuclear Station DBA inspection as currently scheduled in September of 2017. The inspection team will be led by Mr. Wayne Sifre and the team will consist of three NRC inspectors and two contractors. You can expect to receive a request for information letter approximately 60 days ahead of the first on-site week. This letter will ask for information that will allow the team to prepare for the inspection and maximize our effectiveness. As stated, the team's activities will
be governed by NRC Inspection Procedure 71111.21M.
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD ARLINGTON, TX 76011-4511 J. Nadeau 2 We look forward to working with you and your team on this inspection effort. If you have any questions regarding this subject, please contact me at 817-200-1243.
Sincerely, /RA/ Thomas R. Farnholtz, Chief Engineering Branch 1 Division of Reactor Safety
Docket No. 50-416 License No. NPF-29 cc: Electronic Distribution for Grand Gulf
ML17101A738 SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword: By: TFarnholtz Yes No Publicly Available Sensitive NRC-002 OFFICE C:EB1 D:DRS NAME TFarnholtz AVegel SIGNATURE /RA/ /RA/ DATE 4/11/17 4/11/17