MONTHYEARIR 05000324/20240102024-09-10010 September 2024 Focused Engineering Inspection Commercial Grade Dedication Report 05000324-2024010 and 05000325-2024010 ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 IR 05000324/20240052024-08-23023 August 2024 Updated Inspection Plan for Brunswick Steam Electric Plant, Units 1 and 2 (Report 05000324/2024005 and 05000325/2024005) IR 05000324/20240022024-08-0505 August 2024 Integrated Inspection Report 05000324/2024002 and 05000325/2024002 and 07200006/2024001 ML24206A1062024-07-30030 July 2024 2024 Brunswick Requal Inspection Corporate Notification Letter ML24183A0972024-07-12012 July 2024 ISFSI; Catawba 1, 2 & ISFSI; McGuire 1, 2 & ISFSI; Oconee 1, 2, 3 & ISFSI; Shearon Harris 1; H. B. Robinson 2 & ISFSI; and Radioactive Package Shipping Under 10 CFR 71 (71-266 & 71-345) – Review of QA Program Changes EPID L-2024-LLQ-0002 IR 05000324/20244202024-07-0202 July 2024 – Security Baseline Inspection Report 05000324/2024420 and 05000325/2024420 ML24108A0702024-06-0505 June 2024 – Issuance of License Amendments to Revise the 10 CFR 50.69 Categorization Process to Reflect an Alternative Seismic Approach IR 05000324/20244022024-05-17017 May 2024 Plan Material Control and Accounting Program Inspection Report 05000324/2024402 and 05000325/2024402 - Cover Letter IR 05000324/20240012024-05-0909 May 2024 Integrated Inspection Report 05000324/2024001 and 05000325/2024001 IR 05000324/20243012024-04-0303 April 2024 NRC Operator License Examination Report 05000325/2024301 and 05000324/2024301 ML24066A0132024-03-0505 March 2024 Bru 2024-002 Radiation Safety Baseline Inspection Information Request ML24026A0982024-03-0101 March 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0057 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000324/20230062024-02-28028 February 2024 Annual Assessment Letter for Brunswick Steam Electric Plant, Units 1 and 2 – NRC Inspection Reports 05000324/2023006 and 05000325/2023006 IR 05000324/20244032024-02-14014 February 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perm Inspection 05000325/2024403; 05000324/2024403 ML24032A1392024-02-12012 February 2024 Correction of Errors within Authorized Alternative Request RA-22-0308 IR 05000324/20230042024-02-0606 February 2024 Integrated Inspection Report 05000324/2023004 and 05000325/2023004 IR 05000324/20230112023-12-26026 December 2023 NRC Fire Protection Team Inspection - FPTI Report 05000324/2023011 and 05000325/2023011 IR 05000324/20234022023-12-14014 December 2023 Security Baseline Inspection Report 05000324-2023402 and 05000325-2023402 ML23297A0262023-11-27027 November 2023 Proposed Alternatives to ASME Code Section XI Subsection IWE Requirements for Torus Metallic Liner Inspections ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000324/20230032023-11-0101 November 2023 Integrated Inspection Report 05000324/2023003 and 05000325/2023003 IR 05000324/20230102023-10-17017 October 2023 Biennial Problem Identification and Resolution Inspection Report 05000324/2023010 and 05000325/2023010 IR 05000325/20234012023-10-16016 October 2023 Security Baseline Inspection Report 05000324 and 05000325 2023401 ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000324/20230052023-08-23023 August 2023 Updated Inspection Plan for Brunswick Steam Electric Plant, Units 1 and 2 (Report 05000324/2023005 and 05000325/2023005) IR 05000324/20230022023-08-0404 August 2023 Integrated Inspection Report 05000324/2023002 and 05000325/2023002 ML23201A2042023-07-28028 July 2023 Summary of Regulatory Audit in Support of Alternative Request RA-22-0308 for Inservice Inspection of the Torus Metallic Liner ML23212B2682023-07-25025 July 2023 Notification of Licensed Operator Initial Examination 05000325/2024301 and 05000324/2024301 ML23146A0012023-05-24024 May 2023 EN 56538 - Engine Systems Inc and Brunswick ML23212A9502023-05-24024 May 2023 Engine Systems, Inc., Part 21 Report Re Woodward EGB-35P Governor/Actuator with Foreign Material ML23130A3902023-05-12012 May 2023 Regulatory Audit Plan in Support of Alternative Request RA 22-0308 for Inservice Inspection of the Torus Metallic Liner IR 05000324/20230012023-05-10010 May 2023 Integrated Inspection Report 05000324 2023001 and 05000325 2023001 ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI IR 05000324/20220042023-04-0404 April 2023 Reissue - Brunswick Steam Electric Plant - Integrated Inspection Report 05000324/2022004 and 05000325/022004 ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility IR 05000324/20220062023-03-0101 March 2023 Annual Assessment Letter for Brunswick Steam Electric Plant, Units 1 and 2 NRC Inspection Reports 05000324/2022006 and 05000325/2022006 ML23033A5252023-02-0808 February 2023 Integrated Inspection Report 05000324/2022004 and 05000325/2022004 IR 05000324/20223012023-02-0303 February 2023 NRC Operator License Examination Report 05000325/2022301 and 05000324/2022301 ML22332A0132022-11-23023 November 2022 Operator Licensing Written Examination Approval 05000325/2022301 and 05000324/2022301 IR 05000324/20224022022-11-23023 November 2022 Security Baseline Inspection Report 05000324 2022402 and 05000325 2022402 ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 IR 05000324/20224032022-11-10010 November 2022 Cyber Security Inspection Report 05000324/2022403 and 05000325/2022403 ML22307A1762022-11-0707 November 2022 Notification of an NRC Fire Protection Team Inspection (FPTI) IR 05000324/20220032022-11-0707 November 2022 Integrated Inspection Report 05000324/2022003 and 05000325/2022003 ML22258A0302022-09-15015 September 2022 Evacuation Time Estimate Reports IR 05000324/20220052022-08-24024 August 2022 Updated Inspection Plan for Brunswick Steam Electric Plant (Report 05000324/2022005 and 05000325/2022005) 2024-09-04
[Table view] |
Text
AAR EVASeptember 30, 2015NRC:15:036 U.S. Nuclear Regulatory Commission Document Control Desk11555 Rockville PikeRockville, MD 20852Informational Transmittal Regarding the ATRIUM 11 Lead Test Assembly Program at Brunswick
- Nuclear Plant Unit 2Ref. 1: ANF-89-98(P)(A)
Revision 1 and Supplement 1, "Generic Mechanical Design Criteria for BWRFuel Designs, Advanced Nuclear Fuels Corporation,"
May 1995.Attached for the NRC's information is ANP-3397P, "Brunswick Unit 2 ATRIUM 11 Lead Test Assemblies Design & Licensing Summary Report."
This report provides an overview of the ATRIUM 11 LTA Programat the Brunswick Nuclear Plant Unit 2 and is being forwarded to the NRC in support of our lead programwhich is addressed in NRC approved topical report ANF-89-98(P)(A)
Revision 1 and Supplement 1,"Generic Mechanical Design Criteria for BWR Fuel Designs, Advanced Nuclear Fuels Corporation,"
(Reference 1).Proprietary and non-proprietary versions of the report are enclosed.
AREVA Inc. considers some of thematerial contained in the report to be proprietary.
As required by 10 CFR 2.390(b),
an affidavit isenclosed to support the withholding of the information from public disclosure.
There are no commitments contained within the enclosures to this letter.If you have any questions related to this information, please contact Alan Meginnis by telephone at(509) 374-8266, or by e-mail at Alan.Meginnis@areva.com.
Licensing
& Regulatory AffairsAREVA Inc.cc: J. (G. RowleyProject 728.~oD1AREVA INC.3315 Old Forest Road,/Lynchburg, VA 24501Tel.: 434 832 3000 -www.areva.com Document Control Desk NRC:15:036 September 30, 2015 Page 21. Affidavit
- 2. Proprietary Version -ANP-3397P, Revision 0, "Brunswick Unit 2 ATRIUM 11 Lead Test Assemblies Design & Licensing Summary Report."
AREVA Inc. July 2015.3. Non-Proprietary Version -ANP-3397NP, Revision 0, "Brunswick Unit 2 ATRIUM 11 Lead TestAssemblies Design & Licensing Summary Report."
AREVA Inc. July 2015.
AFFIDAVIT STATE OF WASHINGTON
)) ss.COUNTY OF BENTON )1. My name is Alan B. Meginnis.
I am Manager, Product Licensing, for AREVAInc. and as such I am authorized to execute this Affidavit.
- 2. 1- am familiar with the criteria applied by AREVA to determine whether certainARE VA information is proprietary.
I am familiar with the policies established byAREVA to ensure the proper application of these criteria.
- 3. I am familiar with the ARE VA information contained in the reportANP-3397P, Revision 0, "Brunswick Unit 2 ATRIUM 11 Lead Test Assemblies Design &Licensing Summary Report,"
dated September 2015 and referred to( herein as "Document."
Information contained in this Document has been classified by AREVA as proprietary inaccordance with the policies established by ARE VA for the control and protection of proprietary and confidential information.
- 4. This Document contains information of a proprietary and confidential natureand is of the type customarily held in confidence by AREVA and not made available to thepublic. Based on my experience, I am aware that other companies regard information of thekind contained in this Document as proprietary and confidential.
- 5. This Document has been made available to the U.S. Nuclear Regulatory Commission in confidence with the request that the information contained in this Document bewithheld from public disclosure.
The request for withholding of proprietary information is madein accordance with 10 CFR 2.390. The information for which withholding from disclosure is requested qualifies under 10 CER 2.390(a)(4)
"Trade secrets and commercial or financial information."
- 6. The following criteria are customarily applied by AREVA to determine whetherinformation should be classified as proprietary:
(a) The information reveals details of AREVA's research and development plansand programs or their results.(b) Use of the information by a competitor would permit the competitor tosignificantly reduce its expenditures, in time or resources, to design, produce,or market a similar product or service.(c) The information includes test data or analytical techniques concerning
- aprocess, methodology, or component, the application of which results in acompetitive advantage for ARE VA.(d) The information reveals certain distinguishing aspects of a process,methodology, or component, the exclusive use of which provides acompetitive advantage for AREVA in product optimization or marketability.
(e) The information is vital to a competitive advantage held by AREVA, would behelpful to competitors to AREVA, and would likely cause substantial harm tothe competitive position of AREVA.The information in the Document is considered proprietary for the reasons set forth inparagraphs 6(b), 6(d) and 6(e) above.7. In accordance with AREVA's policies governing the protection and control ofinformation, proprietary information contained in this Document have been made available, on alimited basis, to others outside AREVA only as required and under suitable agreement providing for nondisclosure and limited use of the information.
- 8. AREVA policy requires that proprietary information be kept in a secured file orarea and distributed on a need-to-know basis.
- 79. The foregoing statements are true and correct to the best of my knowledge, information, and belief.SUBSCRIBED before me this______
day ofS ./ 2015.Susan K. McCoyNOTARY PUBLIC, STATE OF WASHINGTON MY COMMISSION EXPIRES: