Letter Sequence Supplement |
---|
TAC:MF3154, Revise or Add Actions to Preclude Entry Into LCO 3.0.3 - RITSTF Initiatives 6B and 6C, Control Room Habitability (Approved, Closed) |
|
MONTHYEARML13036A3812013-05-20020 May 2013 Model SE for Plant-Specific Adoption of TSTF-426, Revision 5, Revise or Add Actions to Preclude Entry Into LCO 3.0.3 - RITSTF Initiatives 6b & 6c, Using the CLIIP Project stage: Other ML13318A8922013-11-13013 November 2013 Application for Technical Specification Improvement to Adopt TSTF-426-A, Revision 5, Revise or Add Actions to Preclude Entry Into LCO 3.0.3 - RITSTF Initiatives 6b and 6c Project stage: Request ML14161A6502014-06-10010 June 2014 NRR E-mail Capture - Acceptance Review Results Regarding TSTF-426, Revise or Add Actions to Preclude Entry Into LCO 3.0.3-RITSTF Initiatives 6b and 6c Amd Project stage: Acceptance Review ML14169A0322014-06-13013 June 2014 Supplemental Information Regarding License Amendment Request to Adopt TSTF-426-A Project stage: Supplement ML14307A8422015-01-14014 January 2015 Issuance of Amendment Regarding the Adoption of Technical Specification Task Force (TSTF) 426, Revision 5, Revise or Add Actions to Preclude Entry Into LCO (Limiting Condition of Operation) 3.0.3 Project stage: Approval 2014-06-10
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000336/20240032024-11-0707 November 2024 Integrated Inspection Report 05000336/2024003 and 05000423/2024003 and Apparent Violation and Independent Spent Fuel Storage Installation Inspection Report 07200008/2024001 IR 05000318/20240072024-11-0606 November 2024 Assessment Follow-Up Letter for Calvert Cliffs Nuclear Power Plant, Unit 2 (Report 05000318/2024007) IR 05000317/20240032024-10-22022 October 2024 Integrated Inspection Report 05000317/2024003, 05000318/2024003, and Independent Spent Fuel Storage Installation Report 07200008/2024001 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24283A0012024-10-0909 October 2024 Senior Reactor and Reactor Operator Initial License Examinations IR 05000317/20245012024-10-0707 October 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000317/2024501 and 05000318/2024501 ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification IR 05000317/20240052024-08-29029 August 2024 Updated Inspection Plan for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Report 05000317/2024005 and 05000318/2024005) ML24240A2462024-08-27027 August 2024 Submittal of the Reactor Vessel Material Surveillance Program Capsule Technical Report ML24240A1112024-08-27027 August 2024 Registration of Use of Casks to Store Spent Fuel ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000317/20240022024-08-0606 August 2024 Integrated Inspection Report 05000317/2024002 and 05000318/2024002 IR 05000317/20240102024-07-31031 July 2024 Age-Related Degradation Inspection Report 05000317/2024010 and 05000318/2024010 ML24179A3262024-07-23023 July 2024 LTR - Constellation - SG Welds and Nozzles (L-2023-LLR-0053, L-2023-LLR-0054, L-2023-LLR-0055, L-2023-LLR-0056) ML24198A0442024-07-16016 July 2024 Inservice Inspection Report IR 05000317/20244012024-07-0909 July 2024 Security Baseline Inspection Report 05000317/2024401 and 05000318/2024401 ML24177A1832024-06-25025 June 2024 Inservice Inspection Report RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24161A0012024-06-0909 June 2024 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report ML24150A0522024-05-29029 May 2024 Operator Licensing Examination Approval ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24136A1962024-05-15015 May 2024 Independent Spent Fuel Storage Installation - Annual Radiological Environmental Operating Report IR 05000317/20240012024-05-0707 May 2024 Integrated Inspection Report 05000317/2024001 and 05000318/2024001 RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests 05000317/LER-2024-002, Emergency Diesel Generators Automatic Start Due to Loss of a 13kV Bus2024-04-29029 April 2024 Emergency Diesel Generators Automatic Start Due to Loss of a 13kV Bus 05000318/LER-2024-001, Manual Reactor Trip Due to 22 Steam Generator Feed Pump Trip2024-04-24024 April 2024 Manual Reactor Trip Due to 22 Steam Generator Feed Pump Trip ML24101A1942024-04-22022 April 2024 Closeout Letter for GL 2004-02 ML24114A0182024-04-18018 April 2024 Electronic Reporting of Occupational Exposure Reporting 05000318/LER-2023-004-01, Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer2024-04-12012 April 2024 Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000317/20240402024-04-11011 April 2024 95001 Supplemental Inspection Report 05000317/2024040 and Follow-Up Assessment Letter RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24082A0082024-03-22022 March 2024 Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 ML24078A1152024-03-18018 March 2024 10 CFR 50.46 Annual Report ML24059A0632024-03-15015 March 2024 Authorization and Safety Evaluation for Alternative Request ISI-05-021 (EPID L-2023-LLR-0006) - Non-Proprietary IR 05000317/20230062024-02-28028 February 2024 Annual Assessment Letter for Calvert Cliffs Nuclear Power Plant, Units 1 and 2, (Reports 05000317/2023006 and 05000318/2023006 ML24052A0072024-02-14014 February 2024 Core Operating Limits Report for Unit 1, Cycle 27, Revision 0 ML24040A0962024-02-0909 February 2024 Notification of Readiness for NRC 95001 Inspection ML24040A1492024-02-0909 February 2024 Response to NRC Request for Additional Information Regarding Final Response to Generic Letter 2004-02 IR 05000317/20230042024-02-0101 February 2024 Integrated Inspection Report 05000317/2023004 and 05000318/2023004 ML24029A0102024-01-29029 January 2024 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000317/2024010 and 05000318/2024010 ML24003A8872024-01-19019 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0033 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24011A0732024-01-11011 January 2024 Proposed Alternative to the Requirements for Repair/Replacement of Saltwater (SW) System Buried Piping 05000318/LER-2023-003, Forward LER 2023-003-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Manual Actuation of Auxiliary Feedwater System Due to 22 Steam Generator Feedwater Pump Trip2024-01-0808 January 2024 Forward LER 2023-003-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Manual Actuation of Auxiliary Feedwater System Due to 22 Steam Generator Feedwater Pump Trip ML24005A0222024-01-0505 January 2024 Revised Steam Generator Tube Inspection Reports ML23304A0642024-01-0202 January 2024 Issuance of Amendment No. 349 to Modify the Long-Term Coupon Surveillance Program RS-23-125, Request for Exemption from 10 CFR 2.109(b)2023-12-0707 December 2023 Request for Exemption from 10 CFR 2.109(b) ML23331A2992023-11-27027 November 2023 Submittal of Condition Prohibited by Technical Specifications Due to Failure to Sample Diesel Generator Fuel Oil Storage Tank IR 05000317/20230102023-11-20020 November 2023 Biennial Problem Identification and Resolution Inspection Report 05000317/2023010 and 05000318/2023010 2024-09-06
[Table view] |
Text
- Exe on GeGeorge GellrichExeon Generation() Site Vice PresidentCalvert Cliffs Nuclear Power Plant1650 Calvert Cliffs ParkwayLusby, MD 20657410 495 5200 Office717 497 3463 Mobilewww.exeloncorp.comgeorge.gellrich@exeloncorp.comJune 13, 2014U. S. Nuclear Regulatory CommissionATTN: Document Control DeskWashington, DC 20555Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2Renewed Facility Operating License Nos. DPR-53 and DPR-69NRC Docket Nos. 50-317 and 50-318
Subject:
Supplemental Information Regarding License Amendment Request to AdoptTSTF-426-A
Reference:
- 1. Letter from Mr. G. H. Gellrich (CCNPP) to Document Control Desk (NRC),dated November 13, 2013, Application for Technical SpecificationImprovement to Adopt TSTF-426-A, Revision 5, "Revise of Add Actions toPreclude Entry into LCO 3.0.3 -RITSTF Initiatives 6b and 6c"In Reference 1, Calvert Cliffs Nuclear Power Plant, LLC submitted a license amendmentrequest to modify the Technical Specification requirements to adopt the changes described inTechnical Specification Task Force (TSTF)-426-A, Revision 5, "Revise of Add Actions toPreclude Entry into LCO 3.0.3 -RITSTF Initiatives 6b and 6c." Supplemental information isneeded for completion of the Nuclear Regulatory Commission review of the requestedamendment. Attachment (1) provides corrected inserts for Technical Specification 3.6.6 and3.7.8. Additionally, corrected Technical Specification Bases insert B 3.7.8.1 is also provided inAttachment (1). Please replace the affected inserts in Reference 1 with the attached inserts.We apologize for any inconvenience.This supplemental information does not change the No Significant Hazards Determinationprovided in Reference 1. No regulatory commitments are contained in this letter.Should you have questions regarding this matter, please contact Mr. Douglas E. Lauver,Regulatory Assurance Manager, at (410) 495-5219.A 00 Document Control DeskJune 13, 2014Page 2I declare under penalty of perjury that the foregoing is true and correct. Executed on June 13,2014.Respectfully,George H. Ge richSite Vice PresidentExelon Generation Company, LLCGHG/PSF/bjd
Attachment:
(1) Revised Inserts 3.6.6, 3.7.8 and B 3.7.8.1cc: CCNPP Project Manager, NRC CCNPP Resident Inspector, NRCRegion 1 Administrator, NRC S. Gray, DNR ATTACHMENT (1)REVISED INSERTS 3.6.6, 3.7.8 AND B 3.7.8.1Calvert Cliffs Nuclear Power PlantJune 13, 2014 Insert 3.6.6C. -NOTE -Not applicable whensecond contai nmentspray trainintentionally madeinoperable.Two containment spraytrains inoperable.C.1ANDC.2Verify LCO 3.7.8,"CREVS," is met.1 hour24 hoursRestore at least onecontainment spraytrain to OPERABLEstatus.Insert 3.7.8F. --------NOTE------Not applicable whensecond CREVS trainintentionally madeinoperable.F.1Initiate action toimplement mitigatingactions.ANDF.2Two CREVS trainsinoperable in MODE2, 3, or 4 forreasons other thanCondition D.Verify LCO 3.4.15,"RCS SpecificActivity," is met.Immediately1 hour24 hours1,ANDF.3Restore at least oneCREVS train toOPERABLE status.Insert B 3.7.8 11.1 and 1.2If the inoperable CREVs or Control Room boundary cannot be restored to OPERABLE statuswithin the associated Completion Time in MODE 1, 2, 3, or 4, the unit must be placed in a modethat minimizes the accident risk. To achieve this status the unit must be placed in at leastMODE 3 within six hours and in MODE 5 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. The allowed Completion Times arereasonable, based on operating experience, to reach the required unit conditions from full powerconditions in an orderly manner and without challenging unit systems.