05000416/FIN-2008006-04 | 2008Q3 | | Failure to Ensure That Damage to MOTOR-OPERATED Valve Circuits Would Not Prevent Safe Shutdown |
05000416/FIN-2008404-01 | 2008Q3 | | Security |
05000416/FIN-2008006-03 | 2008Q3 | P.3 | Plant Modification Blocked Access for Manual Firefighting |
05000416/FIN-2008004-02 | 2008Q3 | H.8 | Failure to Perform an Adequate Risk Assessment During Adverse Weather Conditions |
05000416/FIN-2008004-01 | 2008Q3 | H.11 H.12 | Failure to Monitor Performance of Four Maintenance Rule Systems |
05000416/FIN-2008006-02 | 2008Q3 | H.4 H.5 | Fire Brigade Members Assigned Responsibilities That Conflicted with Fire Brigade Responsibilities |
05000416/FIN-2008004-03 | 2008Q3 | P.3 | Failure to Perform an Adequate Inspection of PMP Door Seals Protecting Safety Related Equipment |
05000416/FIN-2008006-01 | 2008Q3 | | Failure to Evaluate Fire Wrap Testing Discrepancies |
05000416/FIN-2008402-01 | 2008Q4 | | Security |
05000416/FIN-2008005-02 | 2008Q4 | | Failure to Monitor Performance of the engineering safety features Electrical Switchgear and Battery Room Ventilation |
05000416/FIN-2008005-01 | 2008Q4 | P.1 P.1(a) | Inadequate Fire Drill Critique |
05000416/FIN-2008005-09 | 2008Q4 | H.13 | Failure to Property Monitor Plant Parameters to Control Reactor Coolant System Cooldown Rate |
05000416/FIN-2008005-08 | 2008Q4 | H.11 H.12 | Automatic Reactor Scram Caused by an Operator Inadvertently Closing the Steam Supply Valves to Reactor Feed Pump Turbine |
05000416/FIN-2008005-03 | 2008Q4 | H.14 | Two Examples of Inadequate Operability Evaluations |
05000416/FIN-2008005-04 | 2008Q4 | H.2(a) H.6 | Failure to Correct Leaking Reactor Water Cleanup System Primary Containment Isolation Valves |
05000416/FIN-2008005-05 | 2008Q4 | P.2 | Trip of a Reactor Recirculation Pump During Pump Up-shift to Fast Speed Due to Ineffective Corrective Actions |
05000416/FIN-2008005-06 | 2008Q4 | | Failure to Prevent Recurrence of Standby Service Water Corrosion |
05000416/FIN-2008005-07 | 2008Q4 | P.1 P.1(a) | Untimely Corrective Actions Following Identification of Degrading standby water Supports |
05000416/FIN-2009002-03 | 2009Q1 | H.12 | Failure to Enter a Limiting Condition for Operation for Primary Containment Isolation Valves |
05000416/FIN-2009002-01 | 2009Q1 | | Inadequate Maintenance Procedures to Maintain Drains on Safety Related Buildings |
05000416/FIN-2009002-02 | 2009Q1 | H.14 | Inadequate Operability Evaluation for Standby Service Water Cooling Tower Drift Eliminators |
05000416/FIN-2009003-05 | 2009Q2 | H.12 | Failure to Respond to Control Room Alarms in Accordance with Plant Procedures |
05000416/FIN-2009003-03 | 2009Q2 | H.9 | Failure to Fully Close a LPCS Manual Valve Resulted in Leakage of Water into the Condensate and Refuleing Water Storage System |
05000416/FIN-2009003-01 | 2009Q2 | | Failure to Incorporate Design Changes to Protect the Standby Service Water Slab |
05000416/FIN-2009006-06 | 2009Q2 | P.5 P.2(b) | Inadequate Design Control for Standby Service Water Pump Cables and Electrical Vaults |
05000416/FIN-2009006-05 | 2009Q2 | P.6 P.3(a) | Two Examples of a Failure to Meet 10 CFR Part 50, Appendix B, Criterion XI, Test Control |
05000416/FIN-2009003-04 | 2009Q2 | H.8 | Failure to Perform a Timely Operability Evaluation Following the Discovery of a SSW Fan Failure Mechanism |
05000416/FIN-2009003-02 | 2009Q2 | P.1 | Inadequate Operability Evaluation for Debris Left in the Condensate Storage Tank |
05000416/FIN-2009006-03 | 2009Q2 | P.6 P.3(a) | Motor-Operated Valve Calculations Used Non-Conservative Inputs and Methodologies |
05000416/FIN-2009006-02 | 2009Q2 | | Non-conservative Bias in Instrumentation Used for Standby Service Water Leak Detection |
05000416/FIN-2009006-04 | 2009Q2 | | Inadequate Corrective Actions for Replacement of Safety-Related Batteries |
05000416/FIN-2009006-01 | 2009Q2 | | Preconditioning of Division II Standby Diesel Generator Jacket Water Heat Exchanger |