Cover Letter - Westinghouse Electric Co - Audit Report Advanced Logic System v2 Platform Elimination of Technical Specification Surveillance Requirements
ML25325A151
Person / Time
Site: 99900279
Issue date: 12/09/2025
From: Vechioli-Feliciano L
NRC/NRR/DANU/UAL2
To: Schoedel A
Westinghouse
Vechioli-Feliciano L
Shared Package
ML25325A152 List:
References
CAC 000431, EPID L-2023-TOP-0056
Download: ML25325A151 (0)


Text

Anthony Schoedel, Director eVinci Licensing & Regulatory Affairs Westinghouse Electric Company, LLC.

51 Bridge Street Pittsburgh, PA 15223

SUBJECT:

REPORT FOR THE REGULATORY AUDIT REGARDING WESTINGHOUSE ELECTRIC COMPANY LLCS ADVANCED LOGIC SYSTEM V2 PLATFORM ELIMINATION OF TECHNICAL SPECIFICATION SURVEILLANCE REQUIREMENTS TOPICAL REPORT (CAC/EPID NO. 000431/L-2023-TOP-0056)

Dear Anthony Schoedel,

By letter dated December 20, 2023 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML23354A139), Westinghouse Electric Company (Westinghouse) submitted for the U.S. Nuclear Regulatory Commission (NRC) staff review WCAP-18810-P and WCAP-18810-NP, Advanced Logic System v2 Platform Elimination of Technical Specification Surveillance Requirements, (ML23354A138) for the NRC staffs review.

The NRC staff conducted this regulatory audit as part of its review to gain an understanding and to seek clarification of the information provided in the topical report. In preparation for the audit, the NRC staff notified Westinghouse via e-mail dated February 18, 2025 (ML25101A298) that the audit plan (ML25101A297) was available in the shared electronic reading room with Westinghouse. Subsequently, the NRC staff shared additional audit questions with Westinghouse (ML25220A093 and ML25220A153). The NRC staffs report for the regulatory audit conducted in connection with its review of the TR is provided as an enclosure to this letter.

The audit kick-off meeting associated with the audit plan was held on March 3, 2024, and the audit was conducted through July 18, 2025.

December 9, 2025 If you have any questions regarding this audit, please contact me at (301) 415-6035 or via email at Lucieann.VechioliFeliciano@nrc.gov.

Sincerely, Lucieann Vechioli Feliciano, Project Manager Advanced Reactors Licensing Branch 2 Division of Advanced Reactors and Non-Power Production and Utilization Facilities Office of Nuclear Reactor Regulation Docket No.: 99902079

Enclosure:

As stated cc: schoedaj@westinghouse.com spaldiaj@westinghouse.com Signed by Vechioli, Lucieann on 12/09/25

Package: ML25325A152 Letter: ML25325A151

Enclosure:

ML25325A150 NRR-106 OFFICE NRR/DANU/UAL2:PM NRR/DANU/UAL1:LA NRR//DEX/EICB:BC NAME LVechioli DGreene SDarbali DATE 11/24/2025 12/3/2025 12/3/2025 OFFICE NRR/DANU/UAL2:BC NRR/DANU/UAL2:PM NAME ANeuhausen LVechioli DATE 12/4/2025 12/9/2025