NOV 2 01990 Docket No. 50-333 New York Power Authority James A. FitzPatrick Nuclear Power Plant ATTN:' Mr. William Fernandez Resident Manager P. O. Box ~41 Lycoming, New York 13093 Gentlemen:
Subject:
Inspection No. 50-333/90-17 This refers to your letter dated November 2,1990, in response to our letter dated October 2, 1990.
L Thank you for informing us of the corrective and preventive actions documented in your letter. These actions will be examined during a future inspection of your licensed program.
Your cooperation with us is appreciated.
Sincerely, Didn:1 Signed By:
Jan:s H. Jov..er
,
James H. Joyner, Chief.
Facilities Radiological Safety and Safeguards Branch Division of Radiation Safety and Safeguards l
l i1 1 8
-
,
,
,
b,
..,d L
OFFICIAL RECORD COPY P.L NYPA 90-17 - 0001.0.0 g
901:040mo 901g.g 11/16/90
{DR ADOCK osooos.n
g)
-
er:
L
.
.
l
,-
-
,
,
.
New York Power Authority
glg01990 CC J. Phillip Bayne, President J. Brons, Executive Vice President A. Klausmann, Senior Vice President - Appraisal and Compliance Services G. Tasick, Qv;11ty Assurance Superintendent G. Wilverding, Manager Nuclear Safety Evaluation G. Goldstein, Assistant General Counsel
'
R, Beedle, Vice President Nuclear Support i
S. Zulla, Vice President Nuclear Engineering W. Josiger, Vice President Nuclear Operations & Maintenance J. Gray, Director Nuclear Licensing - BWR
'
Dept. of Public Service, State of New York State of New York, Department of Law Public Document Room (PDR)
local Public Document Room-(LPDR)
Nuclear Safety Information Center (NSIC)
K. Abraham, PA0 (22) SALP Reports and (2) All Inspection Reports NRC Resident' Inspector State of hen York, SLO Designee
,
bec Region 1 Docket Room (with' concurrences)
Management Assistant, DRMA R. Bellamy, DRSS J. Linville, DRP D. Vito,.DRP J
G. Meyer, DRP
M. Miller, DRP M. Conner SALP Reports Only
-
D. LaBarge, NRR J. Caldwell, ED0 R. Capra, NRR M/Z f
'
RI:DRSS S
S-O'Connell/mk Pasciak oy.er 11//f/90 11/11/90 11//1/90 0FFICIAL RECORD COPY RL dYPA 90-17 - 0002.0.0 l
11/16/90 v,
_.. _ _ _
._..
. _. _
. _. - _ _. _. _..
_
_ _ _ _ _. _ _ ~
-
-..
James A. Flespetttok
)
+
Nueiser Power Mont
..
,.~
P.O. Sou 41 Lyewmmg, New York 13093
,
.-
315 342-3840
,
_
William Femandes 11 Resident Manager l
November 2, 1990 JAFP-90-0800
..
.
>
.
U.S. Nuclear Regulatory Commission Mail Station F1-137 Washington, DC 20555 ATTENTION:
Document Control Desk SUBJECT:
RESPONSE TO NOTICE OF VIOLATION -
INSPECTION NO. 90 17 (DOCKET 50-333)
References:
1.
USNRC istter dated October 2, 1990 Subject:. Inspection Report 50-333/90-17
.
3.
NYPA letter (JAFP-90-0517)' dated July 6, 1990 Subject:
Response to Notice of Violation,
,
Inspection Report 50-333/90-17 3.
USNRC letter dated June.6, 1990 Subject:
Inspection Report 50-333/90-17 In accordance with the provisions of 10 CFR 20.201,-the Authority encloses its response to your letter dated October 2,
1990
(Reference 1)L Your letter dated June 6,
1990 (Reference 3)
~
transmitted
.sptction-Report 50-333/90-17 and. its associated
Apagndix A Notice of Violation.-
The Authority responded'to the Notice and disagreed with the second violation (Reference 2).-
-In your letter dated October 2, 1990 (Reference 1) you advised the Authority that, upon further review, you would not withdraw the contested violation and that the Authority was required to respond to'the violation.
The Authority will. implement PORC review of radiation protection procedures referenced in Regulatory Guide 1.33 dated Nove.mner 1972.
This task potentially involves 130 procedures and will b it a substantial burden for PORC.
The Authority will review the radiological procedures against the criteria of Regulatory cuide
'
1.33 to determine which procedures specifically require PORC review.
The PORC review of the major programmatic radiological procedures (e.g.
radiation work permits, radiological surveys,
etc.) referenced in. Regulatory Guide 1.33 will be completed by
'
March 31, 991.
The PORC review of the remaining radiological dfha. 17.( '6 I my l\\T)
u
-
%
'
',,.
.
[
-<
.
,
..
.
To:
United States Nuclear November 2, 190
Regulatory Commission JAFP-90-OR0.
f at;tantion:
Document Control Desk Page-2-FRON:
William Fernandez SUBJECT:
MSPONSE TO NOTICE OF VIOLATION -
INSPECTION NO. 90-17 (DOCKET 50-333)
procedures requiring PORC review will be implemented as each procedure undergoes its next revision or biennial review.
This process will be completed by October 31, 1992.
The Authority intends to request a
change to Technical Specifications to clarify the requirement for PORC review of these procedures.-
"
Very trul yours,
,.
I FERN DEZ WF/GJV
,
,c L
l
.'
enclosure-
'
cc:
R.