ML18054A905

From kanterella
Revision as of 23:11, 29 March 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search

2018/02/23 NRR E-mail Capture - Brunswick TSTF-551 to Revise Secondary Containment SR Acceptance Review (EPID: L-2018-LLA-0011)
ML18054A905
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 02/23/2018
From: Hon A L
Plant Licensing Branch II
To: Braden M K, Murray W R, Turkal M A
Duke Energy Carolinas
References
L-2018-LLA-0011
Download: ML18054A905 (2)


Text

1NRR-DMPSPEm ResourceFrom:Hon, AndrewSent:Friday, February 23, 2018 9:44 AMTo:Murray, William R. (Bill) (Bill.Murray@duke-energy.com) (Bill.Murray@duke-energy.com); Turkal, Mark A; Braden, Michael (Michael.Braden@duke-energy.com)Subject:Brunswick TSTF-551 to Revise Secondary Containment SR Acceptance Review (EPID: L-2018-LLA-0011)Importance:HighBy letter dated February 23, 2018 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML18023A896), Duke Energy Progress, LLC (Duke Energy, the licensee) submitted a license amendment request (LAR) for the Brunswick Steam Electric Plant Unit Nos. 1 and 2. The proposed amendments would revise the Technical Specification 3.6.4.1, "Secondary Containment," Surveillance Requirement (SR) 3.6.4.1.2. SR 3.6.4.1.2 to acknowledge that Secondary Containment access openings may be open for entry and exit allowed in TSTF-551.

The purpose of this email is to provide the results of the NRC staff's acceptance review of the licensee's request. The acceptance review is intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. The staff performed the acceptance review in accordance with Office Instruction LIC-109, Revision 2, "Acceptance Review Procedures" (ML16144A521) and concluded that it provides technical information in sufficient detail to enable the NRC staff to complete its technical review and make an assessment regarding the acceptability of the proposed request. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that affect the staff's ability to complete the detailed technical review are identified despite the completion of the acceptance review.

The NRC staff estimates that the review of this request will take approximately 180 hours0.00208 days <br />0.05 hours <br />2.97619e-4 weeks <br />6.849e-5 months <br /> to complete. We will use your requested completion date of January 23, 2019 as a target decision date. These estimates are based on the staff's initial review of the application and they could change, due to several factors including requests for additional information, and unanticipated addition of scope to the review. If there are emergent complexities or challenges in the review that would cause changes to the initial forecasted completion dates or hours, the reasons for the changes, along with the new estimates, will be communicated to you. Andy Hon, PE Project Manager (Brunswick Nuclear Plant 1 & 2, Sequoyah Nuclear Plant 1 & 2) Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation 301-415-8480 OWFN O8E06 Mail Stop O8B1A andrew.hon@nrc.gov Hearing Identifier: NRR_DMPS Email Number: 207 Mail Envelope Properties (Andrew.Hon@nrc.gov20180223094300)

Subject:

Brunswick TSTF-551 to Revise Secondary Containment SR Acceptance Review (EPID: L-2018-LLA-0011) Sent Date: 2/23/2018 9:43:30 AM Received Date: 2/23/2018 9:43:00 AM From: Hon, Andrew Created By: Andrew.Hon@nrc.gov Recipients: "Murray, William R. (Bill) (Bill.Murray@duke-energy.com) (Bill.Murray@duke-energy.com)" <Bill.Murray@duke-energy.com>

Tracking Status: None "Turkal, Mark A" <Mark.Turkal@duke-energy.com> Tracking Status: None "Braden, Michael (Michael.Braden@duke-energy.com)" <Michael.Braden@duke-energy.com> Tracking Status: None Post Office: Files Size Date & Time MESSAGE 2548 2/23/2018 9:43:00 AM Options Priority: High Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received: