L-2012-263, CFR 50.46, Acceptance Criteria for Emergency Core Cooling Systems in Light Water Nuclear Power Reactors - 30 Day Special Report

From kanterella
Revision as of 23:37, 11 January 2025 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

CFR 50.46, Acceptance Criteria for Emergency Core Cooling Systems in Light Water Nuclear Power Reactors - 30 Day Special Report
ML12198A004
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 07/03/2012
From: Kiley M
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-2012-263, TAC ME4907, TAC ME4908
Download: ML12198A004 (2)


Text

0JUL 0 3 2012 0 L L-2012-263 F=PL.

10 CFR 50.46 POWERING TODAY.

EMPOWERING TOMORROW.

U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555-0001 Re:

Turkey Point Unit 3 Docket No. 50-250 10 CFR 50.46, "Acceptance Criteria for Emergency Core Cooling Systems in Light Water Nuclear Power Reactors" - 30 Day Special Report

References:

1. FPL letter L-2012-204 from Michael Kiley to US Nuclear Regulatory Commission, "Turkey Point Units 3 and 4, Docket Nos. 50-250 and 50-251, 10 CFR 50.46, 'Acceptance Criteria for Emergency Core Cooling Systems in Light Water Nuclear Power Reactors' - 2011 Annual Report," April 30, 2012.
2. FPL letter L-2010-113 from Michael Kiley to US Nuclear Regulatory Commission, "Florida Power & Light Company, Turkey Point Units 3 and 4, Docket Nos. 50-250 and 50-251, License Amendment Request for Extended Power Uprate (LAR 205)," October 21, 2010.
3. FPL letter L-2012-019 from Michael Kiley to US Nuclear Regulatory Commission, "Turkey Point Units 3 and 4, Docket Nos. 50-250 and 50-251, Response to NRC Reactor Systems Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Thermal Conductivity Degradation," January 16, 2012.
4. NRC Letter from Jason Paige to Mano Nazar (FPL), "Turkey Point Units 3 and 4 - Issuance of Amendments Regarding Extended Power Uprate (TAC Nos. ME4907 and ME4908)," June 15, 2012.

10 CFR 50.46(a)(3)(ii) requires that changes to the Large Break Loss of Coolant Accident (LBLOCA) Evaluation Model (EM) and Small Break LOCA (SBLOCA) EM peak clad temperature (PCT) exceeding 50°F have to be reported to the NRC within 30 days. This letter meets this requirement.

FPL letter L-2012-204 (Reference 1), submitted the Turkey Point Units 3 and 4 10 CFR 50.46 2011 annual report. The LBLOCA PCT reported was 1998 OF, and the SBLOCA PCT reported was 1689 OF. The cumulative changes reported by L-2012-204 for the LBLOCA and SBLOCA were 283 OF and 105 OF, respectively.

By letter L-2010-113 (Reference 2), FPL requested a License Amendment for Extended Power Uprate (EPU) for Turkey Point Units 3 and 4 (LAR 205). Reference 3 documented the LBLOCA and SBLOCA EPU EM PCTs for Turkey Point Units 3 and 4 for the EPU conditions. On June 15, 2012, the NRC issued Amendments 249 and 245 (Reference 4) approving the EPU for Turkey Point Units 3 and 4. Turkey Point Unit 3 is implementing the approved EPU during the

  • current Unit 3 Cycle 26 refueling outage. Therefore, the new reference LBLOCA EPU EM PCT is 2152 OF and the new reference SBLOCA EPU EM PCT is 1231 °F.
A002, an FPL Group company 0tf

L-2012-263 Page 2 of 2 In support of the EPU, Turkey Point Unit 3 implemented new 15x1 5 Upgrade fuel assemblies in Unit 3 Cycle 25 and the current Cycle 26 reload. As per Reference 3, Westinghouse identified a mixed core penalty for the Turkey Point Units 3 and 4 LBLOCA PCT of 12'F due to the presence of the new 15x1 5 Upgrade fuel assemblies and the old 15x1 5 DRFAs in the same core. The mixed core penalty is applicable only for Unit 3 Cycle 26 and any future cycles during which 15x15 DRFAs and 15x15 Upgrade fuel assemblies are both present in the core. The SBLOCA PCT is not affected by the mixed core effects.

Table 1 below provides a summary of the new LBLOCA and SBLOCA PCTs for the EPU conditions. The LBLOCA PCT for Unit 3 is 2164 OF with a cumulative change of 12°F due to the mixed core penalty. This is a change of 166 OF in PCT from the LBLOCA PCT of 1998 OF reported in the 2011 annual report. The new SBLOCA PCT is 1231'F. This is a change of 458 OF in PCT from the SBLOCA PCT of 1689 OF reported in the 2011 annual report.

Table I Turkey Point Unit 3 SBLOCA and BE LBLOCA EPU PCT Summary Peak Cladding Cumulative Temperature Change LBLOCA EPU EM (Ref. 3) 2152 OF 0 OF Mixed Core Penalty* (Ref. 3) 12 OF 12 OF Mixed Core EPU PCT 2164 OF 12 OF Peak Cladding Cumulative Temperature Change SBLOCA EPU EM (Ref. 2) 1231 OF 0 OF

  • The mixed core penalty is only applicable to mixed cores with 15x1 5 Upgrade and DRFA fuel.

Should there be any questions, please contact Robert Tomonto, Licensing Manager, at 305-246-7327.

Very truly yours, Michael Kiley4 Vice President Turkey Point Nuclear Plant cc:

Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant