Withdrawal of Licensee Event Report 2012-010, Revision 0, for the Fort Calhoun Station
ML123210168
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 11/07/2012
From: Cortopassi L
Omaha Public Power District
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
LIC-12-0164 LER 12-010-00
Download: ML123210168 (1)


LER-2012-010, Withdrawal of Licensee Event Report 2012-010, Revision 0, for the Fort Calhoun Station
Event date:
Report date:
2852012010R00 - NRC Website

text

-

Omaha Public Power OisJrict 444 South 16 111 Street Mall Omaha, NE 68102-2247 LIC-12-0164 November 7, 2012 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Reference:

Docket No. 50-285

Subject:

Withdrawal of Licensee Event Report 2012-010, Revision 0, for the Fort Calhoun Station By letter dated August 3, 2012, Omaha Public Power District (OPPD) submitted Licensee Event Report (LER) 2012-010, Revision 0, for the Fort Calhoun Station (FCS).

Based on revised calculations, the FCS Engineering Department has determined that the instrumentation racks which were initially identified as over the analyzed weight are fully qualified as seismic class 1. As a result, OPPD is withdrawing LER 2012-010 and this number will not be reused.

No commitments are being made in this letter.

Louis P. Cortopassi Vice President and CNO LPC/EPM/rjr c:

E. E. Collins, Jr., NRC Regional Admini'strator, Region IV L. E. Wilkins, NRC Project Manager J. C. Kirkland, NRC Senior Resident Inspector