LER-1980-069, /01T-0:on 800626,after Reactor Scram,Hpci Failed to Inject to Reactor Pressure Vessel Per Auto Initiation Signal Due to Isolating on Steam Line High Dp.Caused by Turbine Controls Being Out of Dynamic Calibr |
| Event date: |
|
|---|
| Report date: |
|
|---|
| 3211980069R01 - NRC Website |
|
text
11)
LICENSEE EVENT REPORT CONTR!L DLOCK: {
l l
l l
l lh (PLEASE PRINT Oil TYPE ALL REQUlnED INFCRMAllON) o 2 l a] Al El Il IIl 1l@l o l o l -l 0 l 0 l o l o j o l - o l 0 l@l 4l 4 Il :l1l@l l
lg v
2h 26 LICENbE 1YPE JO bl CAT 68 8 O LICENSEE CODE 34 l'
LICENSE P4UMuEll alil
s "J L1.j@l o f s i o l 01013121il@loI61216lalol@lolylijolo10 1@
ON'T 68
&J EVENT DAT E 34 lb HEPollT D AT E 80 S
60 64 OOCK E T NUMUEH 6
EVENT DESCRIPTION AND PRC9AULE CONSEQUENCES h a l2l l Following a reactor scram on June 26, 1980, IIPCI failed to inicct to the l
l RPV after receiving an auto initiation signal due to isolating on steam 013 l l l
0141 l line high dP, reportable per Tech Spec 6.9.1.8.a. The isolation was reset There were no l
and !!PCI auto initiated and controlled RPV water 1cvel.
o 151 l ADS, Core Spray l
cf fccts upon public health and safety due to this event.
o ls l l RCIC was inoperable. There was no impact on Unit l
ol7]l and LPCI were operable.
II. This is a repetitivo event, reference LER 50 -321/1980-o49.
l 80 o la l l COM P-VALVE SYSTEM
CAUSE
CAUSE CODE CODE SUSCODE COMPONEN T L SDE SUSCODE SUSCOOE SI elO LoJ@ l z l@ Iz Iz I z Iz Iz Iz l@ L3J@ IM @
.o191 i
18 19
.3 f
8 9
10 11 12 33
. OCCURRENCE HEPORT FIEVISION SE QUENTI AL EVENT YE AR REPORT NO.
CODE TYPE NO.
O gg,'R/RO lejol
[_j jol6l9l [gj jo ll l l Tj l_l [oj EEg;
_2D 22 23 24 76 27 23 29 30 3I 32 XEN A N
O PL NT ET 4 HOUllS S BP ITT F0F Ib B.
U Lt MAN FACTUnER l_1jj h l G l h (34_C,jh l36,C_jh l/ol3lol6l WQ l Nl@ WQ l Z l9 l9 l9 l@
J 40 41 42 43 44 47 JJ 34 CAUSE DE ;CRIPTION AND CONNECTIVE ACTIONS
!!PCI isolated on high steam line dP due to poor turbine speed control l
l l0l l l
caused *by turbine controls out of dynamic calibration. The system was l1 li l l Procedures are being l
calibrated to yield satisfactory dynamic response.
g, l ;, l l Cold quickstarts of IIPCI and l
lil3l l revised to assure proper system response.
t 4 l
RCIC are scheduled.
An update report will be submitted l
80 7
8 0 A S
% POWER OTHER STATUS IS IY DISCOVEHY DESCRIPTION [T]T] y@ l 0 l 0 l 0 l@] Scram Transient l lAl@l Operator observation l
LOCATION OF RREASE @
CO0 TENT AMOUNT OF ACTIVITY @ l ACnVITY NA l
NA l
RREWO OF RREASE li lc 1 Lz.J O I zl@l 80 44 45 7
0 9 10 ti PEHSONNE E EXPOSUHES NUMilEn TYPE
DESCRIPTION
l l i l il l 0 l 0 l 0 l@[ zj@l NA PEnSO~Ntt'iNaunS otSCniPnO~@
l l
NuMun NA lo jo lo l@l i n 80 7
8 9 31 32 E OSS OF OH DAMAGE TO FACILITY l
TYPE DESCillPilON
"^
LzJ@l i 9 80 C 9 10 l2lnl hl Atlanta Journal-Constitution on June 20, 1980 l
lllllllllllllj l 9%Ut l
>ESCntPilON 68 69 80 E l 8 0 0 717 0 @[* L* Co99 n 9'12-367-77a1
", l a
8 O D 10 i
PilONE:
{-_
NAME OF PRFPAREll U
=
NARRATIVE
REPORT Georgia Power Company.
Plant E.
I. Hatch Baxley, Georgia 31513 Reportable Occurrence Report No. 50-321/1980-0G9.
On June 26, 1980, Plant Hatch Unit I reactor scrammed from a main turbine stop valve fast closure following a turbine trip.
The llPCI 'ystem received an auto initiation signal on low reactor water level but failed to inject to the RPV_due to isolating on a steam line high dP isolation signal.
This is a failure of a system subject to limiting safety system settings to complete
~
~
the required protective function, _ reportable per Technical Specifications 6.9.1.8.a.
The isolation was reset and when the inboard isolation valve was opened, the outboard isolation valve received another steam line high dP isolation cignal. The isolation was reset, the isolation valves opened and.HPCI auto started and injected to the RPV and was used to control water level.
ADS, Core Sptay and LPCI systems were operable.
The RCIC system was inoperable. There were no effects upon public health and safety due to this event. There was no impact on Unit II.
This is a repetitive occurrence as last reported on Reportable Occurrence Report No. 50-321/1980-049.
She isolation, due to steam line high dP, was determined to be caused by poor turbine speed control due to the turbine control system being out of dynamic calibration.
System calibration was affected over a period of time by the replacement of control system components which were statically calibrated.
System operability tests to verify pump rated flow and discharge pressure and quickstarts to verify time to rated flow did not adequately monitor the llPCI system dynamic response to auto start transients.
Following extensive testing, including manual starts and quickstarts of the HPCI system and recalibration of the llPCI turbine control sytems, the !!PCI system demonstrated satisfactory performance during hot quickstarts.
Cglibration, surveillance and operability procedures are being revised to [nclude quickstart test for both Unit I and Unit II IIPCI and RCIC systems.
In addition, performance testing procedures to monitor IIPCI and RCIC system performance are being developed and will be utilized to assure continued satisfactory system dynamic response.
Cold quickstarts of the Unit I IIPCI and RCIC systems are scheduled to be performed prior to placing the generator back on line.
An update report will be submitted following these tests.
~
~
|
|---|
|
|
| | | Reporting criterion |
|---|
| 05000321/LER-1980-001-01, /01T-0:on 800103,while Performing Maint on RHR LPCI Injection Valve,Clevis Pin Found Missing from Strut on Drywell Penetration Restraint.Caused by Improper Installation.New Clevis Pin Installed | /01T-0:on 800103,while Performing Maint on RHR LPCI Injection Valve,Clevis Pin Found Missing from Strut on Drywell Penetration Restraint.Caused by Improper Installation.New Clevis Pin Installed | | | 05000366/LER-1980-001, Forwards LER 80-001/03L-0 | Forwards LER 80-001/03L-0 | | | 05000366/LER-1980-001-03, /03L-0:on 800102,while Performing Narrow Range Torus Water Level Functional Test & Calibr,Level Transmitter 2T48-N021B Found Out of Tolerance.Caused by Range Drift. Transmitter Recalibr & Returned to Svc | /03L-0:on 800102,while Performing Narrow Range Torus Water Level Functional Test & Calibr,Level Transmitter 2T48-N021B Found Out of Tolerance.Caused by Range Drift. Transmitter Recalibr & Returned to Svc | | | 05000321/LER-1980-001, Forwards LER 80-001/01T-0 | Forwards LER 80-001/01T-0 | | | 05000321/LER-1980-002-03, /03L-0:on 800112,while Performing HNP-1-3655,fan lT46-C001B Would Not Meet Flow Requirements Per Tech Specs. Ten Days Later,While Venting Drywell Per HNP-1-1500,flow Did Not Meet Tech Specs.Equipment Recalibr | /03L-0:on 800112,while Performing HNP-1-3655,fan lT46-C001B Would Not Meet Flow Requirements Per Tech Specs. Ten Days Later,While Venting Drywell Per HNP-1-1500,flow Did Not Meet Tech Specs.Equipment Recalibr | | | 05000321/LER-1980-002, Forwards LER 80-002/03L-0 | Forwards LER 80-002/03L-0 | | | 05000366/LER-1980-002, Forwards LER 80-002/01T-0 | Forwards LER 80-002/01T-0 | | | 05000366/LER-1980-002-01, /01T-0:on 800128,during Cold Shutdown,Ae Notified Util That Single Mode Failure Existed for Torus Gravity Fill Isolation Valve 2G51-F013.Caused by Design Deficiency. Standing Order Issued | /01T-0:on 800128,during Cold Shutdown,Ae Notified Util That Single Mode Failure Existed for Torus Gravity Fill Isolation Valve 2G51-F013.Caused by Design Deficiency. Standing Order Issued | | | 05000366/LER-1980-003, Forwards LER 80-003/03L-0 | Forwards LER 80-003/03L-0 | | | 05000366/LER-1980-003-03, /03L-0:on 800117,while Applying Equalizing Charge to 125/250-volt Dc Station Svc Batteries,Hpci Automatic Flow Control Power Inverter Tripped.Caused by Instrument Drift. Instrument Recalibr Satisfactorily | /03L-0:on 800117,while Applying Equalizing Charge to 125/250-volt Dc Station Svc Batteries,Hpci Automatic Flow Control Power Inverter Tripped.Caused by Instrument Drift. Instrument Recalibr Satisfactorily | | | 05000321/LER-1980-003-03, While Performing RHR Valve Operability Procedure,Outboard Shutdown Cooling Isolation Valve F008 Opened in 25.8-S.Caused by Normal Wear & Human Reaction Time.Valve Operator Adjusted | While Performing RHR Valve Operability Procedure,Outboard Shutdown Cooling Isolation Valve F008 Opened in 25.8-S.Caused by Normal Wear & Human Reaction Time.Valve Operator Adjusted | | | 05000321/LER-1980-003, Forwards Revised LER 80-003/03X-1 | Forwards Revised LER 80-003/03X-1 | | | 05000321/LER-1980-004, Forwards LER 80-004/03L-0 | Forwards LER 80-004/03L-0 | | | 05000321/LER-1980-004-03, /03L-0:on 800106,during Startup Mode,Main Steam Line Inboard Isolation Drain Valve Failed in mid-position. Caused by Failure of Valve Motor Winding.Motor Replaced & Valve Returned to Operable Status | /03L-0:on 800106,during Startup Mode,Main Steam Line Inboard Isolation Drain Valve Failed in mid-position. Caused by Failure of Valve Motor Winding.Motor Replaced & Valve Returned to Operable Status | | | 05000366/LER-1980-004-03, /03L-0:on 800118,during Steady State Power Operation Hydrogen Recombiner Inlet Valve 2T49-F003A Did Not Open.Caused by a Failed Torque Switch.Sys Returned to Operation After Switch Was Replaced | /03L-0:on 800118,during Steady State Power Operation Hydrogen Recombiner Inlet Valve 2T49-F003A Did Not Open.Caused by a Failed Torque Switch.Sys Returned to Operation After Switch Was Replaced | | | 05000366/LER-1980-004, Forwards LER 80-004/03L-0 | Forwards LER 80-004/03L-0 | | | 05000321/LER-1980-005, Forwards LER 80-005/03L-0 | Forwards LER 80-005/03L-0 | | | 05000321/LER-1980-005-03, /03L-0:on 800109,w/reactor Mode Switch in Run Mode,Discovered That Surveillance Procedure HNP-1-3007, Turbine Control Valve Fast Closure,Was Not Performed in Grace Period.Caused by Personnel Error | /03L-0:on 800109,w/reactor Mode Switch in Run Mode,Discovered That Surveillance Procedure HNP-1-3007, Turbine Control Valve Fast Closure,Was Not Performed in Grace Period.Caused by Personnel Error | | | 05000366/LER-1980-005, Forwards LER 80-005/03L-0 | Forwards LER 80-005/03L-0 | | | 05000366/LER-1980-005-03, /03L-0:on 800119,during Power Operation,Tech Specs 4.8.1.1.1.a & 4.8.1.1.2a4 for Electrical Power Sources Were Not Performed within 1-h.Caused by Personnel Misinterpretation of Tech Spec Requirements | /03L-0:on 800119,during Power Operation,Tech Specs 4.8.1.1.1.a & 4.8.1.1.2a4 for Electrical Power Sources Were Not Performed within 1-h.Caused by Personnel Misinterpretation of Tech Spec Requirements | | | 05000321/LER-1980-006-03, /03L-0:on 800113,one Standby Gas Treatment Sys Rendered Inoperable W/Both Units in Power Operation.Unit Not Proven Operable within Required 4-h.Caused by Inability to Prove Filter Train Operable within 4-h | /03L-0:on 800113,one Standby Gas Treatment Sys Rendered Inoperable W/Both Units in Power Operation.Unit Not Proven Operable within Required 4-h.Caused by Inability to Prove Filter Train Operable within 4-h | | | 05000321/LER-1980-006, Forwards LER 80-006/03L-0 | Forwards LER 80-006/03L-0 | | | 05000321/LER-1980-007-03, /03L-0:on 800114,while Testing Standby Svc Water Pump,Pump Would Not Meet Criteria.Caused by Disengagement of Pump First Stage Impeller Lock Collet.Lock Collet Replaced & Pump Reinstalled | /03L-0:on 800114,while Testing Standby Svc Water Pump,Pump Would Not Meet Criteria.Caused by Disengagement of Pump First Stage Impeller Lock Collet.Lock Collet Replaced & Pump Reinstalled | | | 05000321/LER-1980-007, Forwards LER 80-007/03L-0 | Forwards LER 80-007/03L-0 | | | 05000366/LER-1980-007-01, /01T-0:on 800130,while Performing High Drywell Pressure Instrument (Reactor Protection Sys) Functional Test & Calibr,Instruments 2C71-N002A,B & D Exceeded Tech Specs.Caused by Instrument Drift | /01T-0:on 800130,while Performing High Drywell Pressure Instrument (Reactor Protection Sys) Functional Test & Calibr,Instruments 2C71-N002A,B & D Exceeded Tech Specs.Caused by Instrument Drift | | | 05000366/LER-1980-007, Forwards LER 80-007/01T-0 | Forwards LER 80-007/01T-0 | | | 05000366/LER-1980-008-03, While Increasing Reactor Power by Rod Withdrawal,Operator Noticed Rod Select Matrix Backlighted & Rod Sequence Control Sys Not Initiating Rod Blocks Properly.Caused by Design Change | While Increasing Reactor Power by Rod Withdrawal,Operator Noticed Rod Select Matrix Backlighted & Rod Sequence Control Sys Not Initiating Rod Blocks Properly.Caused by Design Change | | | 05000366/LER-1980-008, Forwards LER 80-008/03L-1 | Forwards LER 80-008/03L-1 | | | 05000321/LER-1980-008-03, /03L-0:on 800115,during Steady State Power Operation,Secondary Containment Integrity Violated When Personnel Opened 164-ft Elevation Reactor Bldg & Turbine Bldg Airlock Doors Simultaneously.Procedure Revised | /03L-0:on 800115,during Steady State Power Operation,Secondary Containment Integrity Violated When Personnel Opened 164-ft Elevation Reactor Bldg & Turbine Bldg Airlock Doors Simultaneously.Procedure Revised | | | 05000321/LER-1980-008, Forwards LER 80-008/03L-0 | Forwards LER 80-008/03L-0 | | | 05000366/LER-1980-009-03, /03L-0:on 800130,while Performing Procedure HNP-2-33-3,HPCI Min Flow Valve 2E41-F012 Failed to Close. Caused by Sticking Switch Contacts on Flow Switch 2E41-N006. Switch Contacts Cleaned & Procedure HNP-2-3303 Performed | /03L-0:on 800130,while Performing Procedure HNP-2-33-3,HPCI Min Flow Valve 2E41-F012 Failed to Close. Caused by Sticking Switch Contacts on Flow Switch 2E41-N006. Switch Contacts Cleaned & Procedure HNP-2-3303 Performed | | | 05000321/LER-1980-009-03, /03L-0:on 800118,during Normal Operation,Drywell/ Torus Temp Recorder 1T47-R611 Found Stamping Erratically, Making Drywall & Torus Air Temps & Water Temp Difficult to Ascertain.Caused by Failure of Microswitch.Switch Replace | /03L-0:on 800118,during Normal Operation,Drywell/ Torus Temp Recorder 1T47-R611 Found Stamping Erratically, Making Drywall & Torus Air Temps & Water Temp Difficult to Ascertain.Caused by Failure of Microswitch.Switch Replaced | | | 05000366/LER-1980-009, Forwards LER 80-009/03L-0 | Forwards LER 80-009/03L-0 | | | 05000321/LER-1980-010-03, /03L-0:on 800118,during Normal Operation While Performing Standby Liquid Control Pump Operability Test & Relief Valve Test,Pump a Discharge Relief Valve 1C41-F029A Operated at 1,225 Psig.Caused by Setpoint Drift.Valve Reset | /03L-0:on 800118,during Normal Operation While Performing Standby Liquid Control Pump Operability Test & Relief Valve Test,Pump a Discharge Relief Valve 1C41-F029A Operated at 1,225 Psig.Caused by Setpoint Drift.Valve Reset | | | 05000321/LER-1980-010, Forwards LER 80-010/03L-0 | Forwards LER 80-010/03L-0 | | | 05000366/LER-1980-010, Forwards LER 80-010/03L-0 | Forwards LER 80-010/03L-0 | | | 05000366/LER-1980-010-03, /03L-0:on 800131,during Reactor Startup,At 58% Power,Max Total Peaking Factor Was Calculated at 3.0 Compared to Design Value of 2.38.Caused by Lower than Normal Xenon Distribution During Startup | /03L-0:on 800131,during Reactor Startup,At 58% Power,Max Total Peaking Factor Was Calculated at 3.0 Compared to Design Value of 2.38.Caused by Lower than Normal Xenon Distribution During Startup | | | 05000321/LER-1980-011-03, /03L-0:on 800120,while at Steady State Power, torus-to-drywell Differential Pressure recorder,LT48-R631B Had Low Reading.Cause Not Stated | /03L-0:on 800120,while at Steady State Power, torus-to-drywell Differential Pressure recorder,LT48-R631B Had Low Reading.Cause Not Stated | | | 05000366/LER-1980-011-03, /03L-0:on 800202,while Performing Reactor Core Isolation Cooling Shutdown Flow Test,Power Inverter for Remote Flow Control Loop Found to Be Tripped.Caused by Defective Input Filter Capacitors | /03L-0:on 800202,while Performing Reactor Core Isolation Cooling Shutdown Flow Test,Power Inverter for Remote Flow Control Loop Found to Be Tripped.Caused by Defective Input Filter Capacitors | | | 05000321/LER-1980-011, Forwards LER 80-011/03L-0 | Forwards LER 80-011/03L-0 | | | 05000366/LER-1980-012-03, /03L-0:on 800214,while at Full Power,Rhr & Plant Svc Water Min Flow Line Found to Be Inadequately Supported. Caused by Design Deficiency.Design Change Request & Maint Request Implemented to Add Supports | /03L-0:on 800214,while at Full Power,Rhr & Plant Svc Water Min Flow Line Found to Be Inadequately Supported. Caused by Design Deficiency.Design Change Request & Maint Request Implemented to Add Supports | | | 05000321/LER-1980-012, Forwards LER 80-012/03L-0 | Forwards LER 80-012/03L-0 | | | 05000366/LER-1980-012, Forwards LER 80-012/03L-0 | Forwards LER 80-012/03L-0 | | | 05000321/LER-1980-012-03, /03L-0:on 800122,while Reactor Core Isolation Cooling Sys Was Tagged Out for Maint,Hpci Was Found Inoperable,Requiring Orderly Shutdown.Caused by Leak in Line to HPCI Booster Pump Discharged Pressure Gauge | /03L-0:on 800122,while Reactor Core Isolation Cooling Sys Was Tagged Out for Maint,Hpci Was Found Inoperable,Requiring Orderly Shutdown.Caused by Leak in Line to HPCI Booster Pump Discharged Pressure Gauge | | | 05000321/LER-1980-013, Forwards Updated LER 80-013/03X-1 | Forwards Updated LER 80-013/03X-1 | | | 05000321/LER-1980-013-03, Reactor Recirculation Pump a Tripped Causing Power Reduction.Caused by Electrical Short Circuit Due to Steam Leak in Drywell.Terminal Board Replaced & Tested | Reactor Recirculation Pump a Tripped Causing Power Reduction.Caused by Electrical Short Circuit Due to Steam Leak in Drywell.Terminal Board Replaced & Tested | | | 05000366/LER-1980-013-03, /03L-0:on 800203,while Maint Was Performed on 2082-K002 Static Inverter,Emergency Control Transfer Switch Was Placed in Emergency Position.Reactor Core Isolation Cooling Was Rendered Inoperable.Caused by Personnel Error | /03L-0:on 800203,while Maint Was Performed on 2082-K002 Static Inverter,Emergency Control Transfer Switch Was Placed in Emergency Position.Reactor Core Isolation Cooling Was Rendered Inoperable.Caused by Personnel Error | | | 05000366/LER-1980-013, Forwards LER 80-013/03L-0 | Forwards LER 80-013/03L-0 | | | 05000366/LER-1980-014, Forwards LER 80-014/03L-0 | Forwards LER 80-014/03L-0 | | | 05000366/LER-1980-014-03, /03L-0:on 800204,while Performing HNP-2-3054, Average Power Range Monitor C Failed.Caused by Instrument Drift.Instrument Adjusted Per Procedure & Returned to Svc | /03L-0:on 800204,while Performing HNP-2-3054, Average Power Range Monitor C Failed.Caused by Instrument Drift.Instrument Adjusted Per Procedure & Returned to Svc | |
|