Site: | North Anna |
Issue date: | 05/04/1982 |
From: | Clark R Office of Nuclear Reactor Regulation |
To: | |
Shared Package | |
ML20051G767 | List: |
References | |
NUDOCS 8205170152 | |
Download: ML20051G753 (2) | |
Similar Documents at North Anna | |
---|---|
Category:OPERATING LICENSES & AMENDMENTS
MONTHYEARML20206C0081999-04-22022 April 1999
[Table view]Amends 219 & 200 to Licenses NPF-4 & NPF-7,respectively, Changing NAPS TS Casing Cooling & Outside Recirculation Spray Pumps Surveillance Testing Criteria ML20207H4381999-03-0202 March 1999 Amends 218 & 199 to Licenses NPF-4 & NPF-7,respectively, Changing NAPS TS to Provide Allowed Outage Time of 144 Days for PORV Nitrogen Accumulators ML20199C9921999-01-12012 January 1999 Corrected TS Pages to Amends 216 & 197 to Licenses NPF-4 & NPF-7,respectively.TS Bases Changes Associated with Amend Request,Inadvertently Omitted from Licensee 981016 Submittal & Being Sent as Attachment to ML20198A3441998-12-10010 December 1998 Amends 216 & 197 to Licenses NPF-4 & NPF-7,respectively, Changing NAPS TS to Revise Frequency & Voltage Requirements During Starting & steady-state Running Portions of EDG Testing ML20155H0251998-10-30030 October 1998 Amends 215 & 196 to Licenses NPF-4 & NPF-7,respectively, Addressing Changes That Modify Requirements for Isolated Loop Startup to Permit Filling of Drained Isolated Loop Via Backfill from RCS Through Partially Opened Loop Stop Valves ML20237E1821998-08-26026 August 1998 Amends 214 & 195 to Licenses NPF-4 & NPF-7,respectively, Changing NAPS TS to Allow an Extended Allowed Outage Time of 14 Days for One EDG ML20236X3741998-08-0303 August 1998 Amends 213 & 194 to Licenses NPF-4 & NPF-7,respectively, Revising Sections 3.9.7,4.9.7.1,4.9.7.2 & 3/4.9.7 for Unit 1 & Sections 3.9.7,4.9.7.1,4.9.7.2 & 3/4.9.7 for Unit 2, Allowing Movement of Sf Pit Gate Over Irradiated Fuel ML20249C1501998-06-23023 June 1998 Amends 212 & 193 to Licenses NPF-4 & NPF-7,respectively, Making Changes to TS by Revising Listed Sections & Modifying Station Mgt Titles ML20248F0391998-05-28028 May 1998 Correction to Amends 210 & 191 to Licenses NPF-4 & NPF-7. Correction Due to Administrative Oversight ML20217E6451998-04-22022 April 1998 Amends 211 & 192 to Licenses NPF-4 & NPF-7,respectively, Revising Surveillance Requirement 4.4.10.1.1,modifying Insp Requirements for RCP Pump Flywheels for Both Units & Eliminating Loop Straightener Insps ML20216G8671998-04-16016 April 1998 Amends 210 & 191 to Licenses NPF-4 & NPF-7,respectively, Revise SRs 4.7.1.7.2.a.1 & 4.7.1.7.2.a.2 for Both Units for Turbine Throttle & Govenor Valves ML20216F1151998-04-14014 April 1998 Amends 209 & 190 to Licenses NPF-4 & NPF-7,respectively, Revising Surveillance Requirement Tables 3.3-1 & 4.3-1 for Both Units Modifying Testing Requirements for Reactor Trip Bypass Breaker ML20216E0101998-04-13013 April 1998 Amends 208 & 189 to Licenses NPF-4 & NPF-7,respectively, Revising TS to Eliminate Records Retention Requirements from Sections 6.10 of TS ML20203C1621997-12-0404 December 1997 Amends 207 & 188 to Licenses NPF-4 & NPF-7,respectively, Changing TS to Revise Surveillance Requirement 4.7.1.7.2 ML20149L1761997-07-30030 July 1997 Amends 206 & 187 to Licenses NPF-4 & NPF-7,respectively, Addressing Only Proposed Changes to Intermediate Range Trip Setpoints & Allowable Values ML20149F1201997-07-17017 July 1997 Amends 205 & 186 to Licenses NPF-4 & NPF-7,respectively, Addressing Proposed Temporary (Limit by Time Duration) TS Changes for Svc Water Sys Refurbishment ML20116B2311996-07-24024 July 1996 Amends 202 & 183 to Licenses NPF-4 & NPF-7,respectively, Clarifying TS to Allow Switching of Charging & low-head Safety Injection Pumps During Unit Shutdown Conditions ML20117K4031996-06-0505 June 1996 Amends 201 & 182 to Licenses NPF-4 & NPF-7,respectively, Modifying TSs to Increase Min Allowable RCS Total Flow Rate from 284,000 Gpm & 275,000 Gpm to 295,000 Gpm ML20101L6811996-04-0101 April 1996 Amends 200 & 181 to Licenses NPF-4 & NPF-7,respectively, Revising TS to Increase Pressurizer Safety Valve Lift Setpoint Tolerance & Reduce Pressurizer High Pressure Reactor Trip Setpoint & Allowable Value ML20101B3751996-03-0606 March 1996 Amends 199 & 180 to Licenses NPF-4 & NPF-7,respectively, Revising TS Re Neutron Flux High Trip Setpoints W/Inoperable MSSVs ML20100K9951996-02-27027 February 1996 Amends 198 & 179 to Licenses NPF-4 & NPF-7,respectively, Revising TS 3.9.4 to Allow Both Containment Pal Doors to Remain Open During Fuel Movements or Core Alterations Provided That One Door Operable ML20097F3411996-02-0909 February 1996 Amends 196 & 177 to Licenses NPF-4 & NPF-196,respectively, Revising TS Re Use of performance-based Containment Leakage Rate Testing ML20097D2231996-02-0808 February 1996 Amends 195 & 176 to Licenses NPF-4 & NPF-7 Increasing Surevillance Test Interval for Turbine Reheat Stop & Intercept Valves from Once Per 31 Days to Once Per 18 Months & Extending Insp Interval of Turbine Stop ML20093H5911995-10-11011 October 1995 Amends 194 & 175 to Licenses NPF-4 & NPF-7,respectively, Allowing One of Two Svc Water Loops to Be Isolated from Component Cooling Water Head Exchangers During Power Operations in Order to Refurbish Isolated Svc Water Headers ML20083M5681995-05-15015 May 1995 Amends 193 & 174 to Licenses NPF-4 & NPF-7,respectively, Revising NA-1&2 TS 4.6.1.2.a to Permit Approved Exemptions to Containment Integrated Leak Rate Frequency Requirements ML20082U2561995-05-0202 May 1995 Amends 191 & 172 to Licenses NPF-4 & NPF-7,respectively, Revising NA-1&2 TS to Review Responsibilities of Station Nuclear Safety & Operating Committee & Mgt Safety Review Committee ML20087H8971995-05-0101 May 1995 Amends 190 & 171 to Licenses NPF-4 & NPF-7,respectively, Revising NA-1&2 TS by Deleting Requirements to Periodically Review Certain Administrative & Technical Procedures ML20072V5871994-09-0606 September 1994 Amends 188 & 169 to Licenses NPF-4 & NPF-7,respectively, Revising Na 1 & 2 TS HHSI Surveillance Requirements by Removing Explicit Numerical Values & Replacing W/Broader non-numerical Requirements ML20072J1921994-08-24024 August 1994 Amends 187 & 168 to Licenses NPF-4 & NPF-7,respectively, Revising TS by Removing Reactor Trip Sys & ESFAS Response Time from TS to station-controlled Documents ML20072A1051994-08-0909 August 1994 Amends 186 & 167 to Licenses NPF-4 & NFP-7,respectively, Revising NA-1&2 TS ML20071N6021994-07-28028 July 1994 Amends 185 & 166 to Licenses NPF-4 & NPF-7,respectively, Revising NA-1&2 TS Surveillance Frequency Reuirements for Control Rod Motion Testing from Once Per 31 Days to Once Per 92 Days ML20070J4411994-07-18018 July 1994 Amends 184 & 165 to Licenses NPF-4 & NPF-7,respectively, Modifying Requirement for Operability Testing of EDG When Alternate Safety Buses EDG Inoperable ML20070R9181994-05-16016 May 1994 Amends 182 & 163 to Licenses NPF-4 & NPF-7,respectively, Revising Surveillance Frequency of Nozzles in Quench Spray & Recirculation Spray Sys from 5 to 10 Yrs ML20070N1441994-04-22022 April 1994 Amends 181 & 162 to Licenses NPF-4 & NPF-7,respectively, Deleting Tables Listing Certain Components from TS & Relocating Lists to Plant Procedures ML20064M7001994-03-21021 March 1994 Corrected Amend 159 to License NPF-7,revising Page B 3/4 7-7 to Reflect Changes Issued by Previous License Amend ML20064C8561994-03-0101 March 1994 Amends 188,188,180 & 161 to Licenses DPR-32,DPR-37,NPF-4 & NPF-7,respectively,deleting TS Requirement for Station Nuclear Safety Operating Committee Review of Emergency & Security Plans ML20064C2181994-03-0101 March 1994 Amends 179 & 160 to Licenses NPF-4 & NPF-7,respectively, Revising NA-1&2 TS That Allow Plant Personnel to Effect Repairs to Rod Control Sys in Orderly Manner ML20063K9721994-02-17017 February 1994 Amends 178 & 159 to Licenses NPF-4 & NPF-7,respectively, Implementing Revised 10CFR20, Stds for Protection Against Radiation ML20063F2021994-02-0707 February 1994 Amends 177 & 158 to Licenses NPF-4 & NPF-7,respectively, Modifying Surveillance Frequency of Auxiliary Feedwater Sys Pumps from Monthly to Quarterly ML20058D6371993-11-23023 November 1993 Amends 176 & 157 to Licenses NPF-4 & NPF-7,respectively, Revising TS for Surveillance Requirements Re Simulated Reactor Coolant Pump Seal Injection Flow Requirements ML20056H4481993-09-0707 September 1993 Amends 174 & 155 to Licenses NPF-4 & NPF-7,respectively, Increasing Allowable as-found Main Steam Safety Valve Setpoint Tolerance from 1% to 3% ML20056H4521993-09-0707 September 1993 Amends 173 & 154 to Licenses NPF-4 & NPF-7,respectively, Removing Schedular Requirements for Type a Tests to Be Performed Specifically at 40 Plus or Minus 10 Month Interval & Instead Ref Type a Testing Per 10CFR50,App J ML20057A3331993-09-0202 September 1993 Amends 172 & 153 to Licenses NPF-4 & NPF-7,respectively, Separating Containment Recirculation Spray Subsystems Into Two Containment Recirculation Spray Trains Consistent W/Sts ML20056E4751993-08-0404 August 1993 Amends 171 & 151 to Licenses NPF-04 & NPF-07,respectively, Revising TS Requirements Re High Head Safety Injection Flow Balance Tests by Removing Uncertainty of Flow Measurements Caused by Instrument Inaccuracies ML20035E4491993-04-12012 April 1993 Amend 150 to License NPF-7,suspending Manual ESF Functional Test of Safety Injection Input to Reactor Trip Breakers for Remainder of Facility Operating Cycle 9 ML20035B8741993-03-25025 March 1993 Amends 170 & 149 to Licenses NPF-4 & NPF-7,respectively, Revising P/T Operating Limitations During Heatup & Cooldown & Ltops Setpoints for 12 & 17 EFPYs for NA-1 & 2, Respectively ML20035B1421993-03-23023 March 1993 Correction to Amends 161 & 142 for Units 1 & 2 Due to Administrative Error on TS Page 3/4-10 Re Elimination of Resistance Temp Detectors & Substitution of Thermowells ML20126D8791992-12-0909 December 1992 Amends 169 & 148 to Licenses NPF-4 & NPF-7,respectively, Revising Current NA-1&2 TS Pertaining to Monitoring Program for Secondary Water Chemistry ML20118C1141992-10-0505 October 1992 Amends 167 & 147 to Licenses NPF-4 & NPF-7,respectively, Deleting from TS 3/4.7.12,settlement Monitoring of Most Category I Structures & Increasing Allowable Differential Settlement Limits for Certain Structures ML20118B1321992-09-21021 September 1992 Amends 166 & 146 to Licenses NPF-4 & NPF-7,respectively, Revising Wording in TS for RCS Vol in Design Features Section 1999-04-22 Category:TEXT-LICENSE APPLICATIONS & PERMITS MONTHYEARML20210L1501999-08-0404 August 1999
[Table view]Application for Amends to Licenses NPF-4 & NPF-7,ack Establishment of Seal Injection for RCP in Isolated & Drained Loop as Prerequisite for vacuum-assisted Backfill Technique & Extending Drained Loop Verification Time ML20206N3601999-05-0606 May 1999 Application for Amends to Licenses NPF-4 & NPF-7,revising Surveillance Frequency for RTS & ESFAS Analog Instrumentation Channels & Modifying AOT & Action Times for RTS & ESFAS Analog Instrumentation Channels ML20206G8271999-05-0303 May 1999 Application for Amends to Licenses NPF-4 & NPF-7,deleting &/Or Relocating Addl primary-to-secondary Leak Rate Limits & Enhanced Leakage Monitoring Requirements Imposed Following 1987 SG Tube Rupture Event ML20206G8641999-05-0303 May 1999 Application for Amends to Licenses NPF-4 & NPF-7,increasing Allowable Leakage from ECCS Components,Establishing Consistent Licensing Basis for Accidents Requiring Dose Analysis & Clarifying Requirements of CREVS ML20206C0081999-04-22022 April 1999 Amends 219 & 200 to Licenses NPF-4 & NPF-7,respectively, Changing NAPS TS Casing Cooling & Outside Recirculation Spray Pumps Surveillance Testing Criteria ML20207H4381999-03-0202 March 1999 Amends 218 & 199 to Licenses NPF-4 & NPF-7,respectively, Changing NAPS TS to Provide Allowed Outage Time of 144 Days for PORV Nitrogen Accumulators ML20199C9921999-01-12012 January 1999 Corrected TS Pages to Amends 216 & 197 to Licenses NPF-4 & NPF-7,respectively.TS Bases Changes Associated with Amend Request,Inadvertently Omitted from Licensee 981016 Submittal & Being Sent as Attachment to ML20198A3441998-12-10010 December 1998 Amends 216 & 197 to Licenses NPF-4 & NPF-7,respectively, Changing NAPS TS to Revise Frequency & Voltage Requirements During Starting & steady-state Running Portions of EDG Testing ML20195J4351998-11-18018 November 1998 Application for Amends to Licenses NPF-4 & NPF-7,revising Allowable Groundwater Elevations & Removal of Piezometer Device Numbers Associated with Svc Water Reservoir ML20195C9291998-11-10010 November 1998 Application for Amends to Licenses NPF-4 & NPF-7,revising TSs to Clarify Operability Requirements for Pressurizer Heaters & Emergency Power Source for Pressurizer Heaters ML20155H0251998-10-30030 October 1998 Amends 215 & 196 to Licenses NPF-4 & NPF-7,respectively, Addressing Changes That Modify Requirements for Isolated Loop Startup to Permit Filling of Drained Isolated Loop Via Backfill from RCS Through Partially Opened Loop Stop Valves ML20237E1821998-08-26026 August 1998 Amends 214 & 195 to Licenses NPF-4 & NPF-7,respectively, Changing NAPS TS to Allow an Extended Allowed Outage Time of 14 Days for One EDG ML20236X3741998-08-0303 August 1998 Amends 213 & 194 to Licenses NPF-4 & NPF-7,respectively, Revising Sections 3.9.7,4.9.7.1,4.9.7.2 & 3/4.9.7 for Unit 1 & Sections 3.9.7,4.9.7.1,4.9.7.2 & 3/4.9.7 for Unit 2, Allowing Movement of Sf Pit Gate Over Irradiated Fuel ML20236U8611998-07-28028 July 1998 Application for Amend to Licenses NPF-4 & NPF-7,revising EDG Section to Be Consistent W/Station Procedures Associated W/ Steady State Conditions & W Nuclear Safety Advisory Ltr,Nsal 93-022 ML20236U8261998-07-28028 July 1998 Application for Amends to Licenses NPF-4 & NPF-7,revising Testing Acceptance Criteria to Demonstrate Operability of Casing Cooling & Outside Recirculation Spray Pumps ML20236U8571998-07-28028 July 1998 Application for Amend to Licenses NPF-04 & NPF-07,revising TS 3/4.1.2 Re RWST & Boron Concentration Ph Range Bases Change ML20249C1501998-06-23023 June 1998 Amends 212 & 193 to Licenses NPF-4 & NPF-7,respectively, Making Changes to TS by Revising Listed Sections & Modifying Station Mgt Titles ML20248F0391998-05-28028 May 1998 Correction to Amends 210 & 191 to Licenses NPF-4 & NPF-7. Correction Due to Administrative Oversight ML20217E6451998-04-22022 April 1998 Amends 211 & 192 to Licenses NPF-4 & NPF-7,respectively, Revising Surveillance Requirement 4.4.10.1.1,modifying Insp Requirements for RCP Pump Flywheels for Both Units & Eliminating Loop Straightener Insps ML20216G8671998-04-16016 April 1998 Amends 210 & 191 to Licenses NPF-4 & NPF-7,respectively, Revise SRs 4.7.1.7.2.a.1 & 4.7.1.7.2.a.2 for Both Units for Turbine Throttle & Govenor Valves ML20216F1151998-04-14014 April 1998 Amends 209 & 190 to Licenses NPF-4 & NPF-7,respectively, Revising Surveillance Requirement Tables 3.3-1 & 4.3-1 for Both Units Modifying Testing Requirements for Reactor Trip Bypass Breaker ML20216E0101998-04-13013 April 1998 Amends 208 & 189 to Licenses NPF-4 & NPF-7,respectively, Revising TS to Eliminate Records Retention Requirements from Sections 6.10 of TS ML20217E8931998-03-25025 March 1998 Application for Amends to Licenses NPF-4 & NPF-7,modifying Insp Frequency of EDGs & Establishing Configuration Risk Mgt Program to Support Risk Informed Tech Specs ML18153A2891998-03-25025 March 1998 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7,revising Station Mgt Titles to Reflect New Positions Approved by Vepc Power Board of Directors on 980220 ML20202C3281998-02-0303 February 1998 Application for Amends to Licenses NPF-4 & NPF-7,modifying Testing Requirements for Reactor Trip Bypass Breaker ML20202C5621998-02-0303 February 1998 Application for Amends to Licenses NPF-4 & NPF-7,modifying Insp Requirements & Frequency for RCP Flywheels & Eliminating Insp Requirements for Unit 1,reactor Coolant Flow Straighteners ML20203C1621997-12-0404 December 1997 Amends 207 & 188 to Licenses NPF-4 & NPF-7,respectively, Changing TS to Revise Surveillance Requirement 4.7.1.7.2 ML20199H3661997-11-18018 November 1997 Application for Amends to Licenses NPF-4 & NPF-7,permitting Quarterly Testing of Turbine Governor & Throttle Valves. Non-proprietary Tr,Rev 1 to WCAP-14733 & Proprietary Tr,Rev 1 to WCAP-14732,encl.Proprietary Rept Withheld ML20199A1411997-11-0505 November 1997 Application for Amends to Licenses NPF-4 & NPF-7, Respectively.Amends Will Provide Administrative Controls in TS 3/4.9.7,to Permit Spent Fuel Pit Gate Movement Over Irradiated Fuel ML20149L1761997-07-30030 July 1997 Amends 206 & 187 to Licenses NPF-4 & NPF-7,respectively, Addressing Only Proposed Changes to Intermediate Range Trip Setpoints & Allowable Values ML20149F1201997-07-17017 July 1997 Amends 205 & 186 to Licenses NPF-4 & NPF-7,respectively, Addressing Proposed Temporary (Limit by Time Duration) TS Changes for Svc Water Sys Refurbishment ML20141F3691997-05-14014 May 1997 Application for Amends to Licenses NPF-4 & NPF-7,revising Wording in Surveillance Requirement 4.7.1.7.2.a to Clarify Testing & Insp Methodology of Turbine Governor Control Valves.Clarification Also Provided in TS 3/4.7.1.7 ML20132E6091996-12-17017 December 1996 Application for Amends to Licenses NPF-4 & NPF-7,requesting Temporary Changes to Service Water Sys Piping Repair and Refurbishment ML18153A6331996-11-26026 November 1996 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7,respectively,eliminating Records Retention Requirements Section of Ts,Per GL 95-06 & Adminstrative Ltr 95-06 ML20134H0001996-11-0606 November 1996 Application for Amends to Licenses NPF-4 & NPF-7,modifying Requirements for Isolated Loop Startup to Permit Filling of Drained Isolated Loop Via Backfill from RCS Through Partially Opened Loop Stop Valves ML20116B2311996-07-24024 July 1996 Amends 202 & 183 to Licenses NPF-4 & NPF-7,respectively, Clarifying TS to Allow Switching of Charging & low-head Safety Injection Pumps During Unit Shutdown Conditions ML20117K4031996-06-0505 June 1996 Amends 201 & 182 to Licenses NPF-4 & NPF-7,respectively, Modifying TSs to Increase Min Allowable RCS Total Flow Rate from 284,000 Gpm & 275,000 Gpm to 295,000 Gpm ML20107L3881996-04-25025 April 1996 Application for Amends to Licenses NPF-4 & NPF-7,providing Suppl Info That Clarifies TS to Allow Switching of Charging & low-head SI Pumps During Unit Shutdown Conditions ML20101L6811996-04-0101 April 1996 Amends 200 & 181 to Licenses NPF-4 & NPF-7,respectively, Revising TS to Increase Pressurizer Safety Valve Lift Setpoint Tolerance & Reduce Pressurizer High Pressure Reactor Trip Setpoint & Allowable Value ML20101F7891996-03-21021 March 1996 Application for Amends to Licenses NPF-4 & NPF-7,clarifying Requirements for Testing Charcoal Adsorbent in Waste Gas Charcoal Filter Sys,Cr Emergency Habitability Sys & Safeguard Area Ventilation Sys ML20101B3751996-03-0606 March 1996 Amends 199 & 180 to Licenses NPF-4 & NPF-7,respectively, Revising TS Re Neutron Flux High Trip Setpoints W/Inoperable MSSVs ML20100K9951996-02-27027 February 1996 Amends 198 & 179 to Licenses NPF-4 & NPF-7,respectively, Revising TS 3.9.4 to Allow Both Containment Pal Doors to Remain Open During Fuel Movements or Core Alterations Provided That One Door Operable ML20097F3411996-02-0909 February 1996 Amends 196 & 177 to Licenses NPF-4 & NPF-196,respectively, Revising TS Re Use of performance-based Containment Leakage Rate Testing ML20097D2231996-02-0808 February 1996 Amends 195 & 176 to Licenses NPF-4 & NPF-7 Increasing Surevillance Test Interval for Turbine Reheat Stop & Intercept Valves from Once Per 31 Days to Once Per 18 Months & Extending Insp Interval of Turbine Stop ML20097C0001996-01-31031 January 1996 Application for Amends to Licenses NPF-4 & NPF-7, Respectively,Revising Current Minimum EDG Fuel Oil Day Tank Vol & Allowing Credit to Be Taken for Surveillance Testing Performed During Power to Satisfy SR Required in Shutdown ML20097J4281996-01-30030 January 1996 Application for Amends to Licenses NPF-4 & NPF-7, Respectively,Modifying Table 3.2.-1 TS 3.2.5 to Increase Minimum Allowable RCS Total Flow Rate from 284,000 Gpm & 275,000 Gpm to 295,000 Gpm ML20096G9811996-01-23023 January 1996 Application for Amends to Licenses NPF-4 & NPF-7,permitting Use of 10CFR50 App J,Option B,performance-based Containment Lrt ML20094N7881995-11-20020 November 1995 Application for Amends to Licenses NPF-4 & NPF-7,permitting Use of 10CFR50 App J,Option B,performance-based Containment Leakage Rate Testing ML20094D0131995-10-25025 October 1995 Application for Amends to Licenses NPF-4 & NPF-7,re Allowed Outage Time for PORV Nitrogen Accumulators & Separate Actions for PORV Inoperability ML20093K5851995-10-17017 October 1995 Application for Amend to License NPF-7,modifying Table 4.4-1 of TS 4.4.5.1 to Reduce from Two to One Min Number of SGs Required to Be Inspected During First ISI Following SG Replacement 1999-08-04 |
Text
-
f['
o,,
UNITED STATES p,
NUCLEAR REGULATORY COMMISSION 3
- , E WASHINGTON, D. C. 2C555
^
k Y VIRGINIA ELECTRIC AND POWER COMPANY DOCKET NO. 50-339 NORTH ANNA POWER STATION, UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 23 License No. NPF-7 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The applications for amendment by Virginia Electric and Power Company (the Licensee) dated February 24, 1982 and March 30, 1982 comply with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the applications, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities wili be conducted in compliance with the Commission's regulations; 1
D.
The issuance of this amendment will not be inimical to the common defense a'nd security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
l e
b
. ~,
.%_..- - -- - ~ ~...
~._..-~w~-
2.
Paragraph 2.C.(4)(C) of Facility Operating License NPF-7 is hereby amended to read as follows:
"VEPC0 shall test the narrow and wide-range resistance temperature detectors for the reactor coolant system by the Loop Current Step Response method each calender quarter until a long-term qualified resistance temperature detector is available. Resistance temperature detectors will be replaced if unsatisfactory Loop Current Step Respanse test results are acquired.
For narrow and wide-range resistance temperature detectors not replaced at a given refueling outage, VEPC0 shall assure that resistance temperature detector cable connectors are adequately sealed and shall use the Arrhenius methodology to affirm that the resistance temperature detector material. has not endured significant degradation due to environmental parameters. The results of this affirmation shall be added to central environmental qualification files."
3.
This license amendment is effective as of the date of its issuance.
FOR THE NUCLEAR REGULATORY COMMISSION luif'~
Robert A. Clark, Chief Operating Reactors Branch #3 Division of Licensing Date of Issuance:
May 4, 1982 l
l e