05000000/LER-1977-012, :on 770620,during Investigation of Cycle 5 Max Critical Power Ratio Limits,Ge Found That Pump Trip Delay Time Assumed in Original Cycle 5 Transient Analysis Not Appropriate.Amend Request Will Be Submitted

From kanterella
Revision as of 02:28, 14 December 2024 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
:on 770620,during Investigation of Cycle 5 Max Critical Power Ratio Limits,Ge Found That Pump Trip Delay Time Assumed in Original Cycle 5 Transient Analysis Not Appropriate.Amend Request Will Be Submitted
ML20086D496
Person / Time
Site: 05000000, Monticello
Issue date: 06/27/1977
From: Mayer L
NORTHERN STATES POWER CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19289B550 List:
References
LER-77-012, LER-77-12, NUDOCS 8312020179
Download: ML20086D496 (2)


LER-1977-012, on 770620,during Investigation of Cycle 5 Max Critical Power Ratio Limits,Ge Found That Pump Trip Delay Time Assumed in Original Cycle 5 Transient Analysis Not Appropriate.Amend Request Will Be Submitted
Event date:
Report date:
0001977012R00 - NRC Website

text