MONTHYEARML20211K6241999-08-31031 August 1999 Proposed Tech Specs,Changing ISFSI License Conditions 6,7 & 8 & TS 3/4.1 by Permitting Inclusion of Bpras & Thimble Plug Devices in Sf Assemblies Stored in TN-40 Casks ML20206R0621999-05-13013 May 1999 Proposed Tech Specs,Removing Plant Organization Structure Requirement ML20205S3331999-04-20020 April 1999 Proposed Tech Specs Changing Implementation Date for Relocation from TS to UFSAR of Requirements in TS 3.1.E & Flooding Shutdown Requirements in TS 5.1 ML20205Q0351999-04-12012 April 1999 Proposed Tech Specs,Relocating Shutdown Margin Requirements from TS to COLR ML20204H3601999-03-19019 March 1999 Proposed Tech Specs Removing Dates of Two NRC SERs & Correcting Dates of One SER Listed in Section 2.C.4, Fire Protection ML20207F2901999-03-0101 March 1999 Proposed Revised Tech Specs Incorporating Combustion Engineering SG Welded Tube Sleeve TR Rev ML20203A2181999-02-0505 February 1999 Proposed Tech Specs,Changing TS 4.12, SG Tube Surveillance to Incorporate Changes to ABB C-E Sleeve Design Assumptions & Installation Techniques ML20196B9721998-11-25025 November 1998 Proposed Tech Specs,Allowing Limited Inoperability of Bast Level Channels & Transfer Logic Channels to Provide for Required Testing & Maint of Associated Components ML20155G6321998-11-0303 November 1998 Proposed Tech Specs B.3.1-7 & B.3.1-7a,rev 133A Re Reactor Coolant Sys ML20154S2101998-10-23023 October 1998 Proposed Tech Specs Clarifying Conditions That Constitute Operable Irpi Sys Channels ML20151U3651998-09-0404 September 1998 Proposed Tech Specs TS.3.1-5,TS.4.18-1 & B.4.18-1,clarifying SRs & LCOs for Operability for Reactor Coolant Vent Sys ML20237B5061998-08-12012 August 1998 Proposed Tech Specs Re Conformance of Administrative Controls Section 6 to Guidance of Std Tech Specs ML20236T6041998-07-20020 July 1998 Proposed Tech Specs Incorporating Elevated F* SG Tube Repair Criteria ML20249A7641998-06-11011 June 1998 Proposed Tech Specs Re Conformance of Administrative Controls Section 6 to Guidance of Std ML20216G0371998-04-13013 April 1998 Proposed Tech Specs 3.3 Re Engineered Safety Features ML20216D0591998-03-0606 March 1998 Proposed Tech Specs Updating Heatup & Cooldown Rate Curves, Incorporating Use of Pressure & Temp Limits Rept & Changing Pressurizer PORVs Operability Temp ML20217P0061998-03-0404 March 1998 Proposed Tech Specs Re Status of Relocated Requirements ML20217N9771998-03-0202 March 1998 Proposed Tech Specs 3.8.D Re Spent Fuel Pool Special Ventilation Sys ML20217P1431998-03-0202 March 1998 Proposed Tech Specs Re Conformance of Administrative Controls Section 6 to Guidance of Std ML20202E5691998-02-10010 February 1998 Proposed Tech Specs 1-1 Re One Time Reduction of Mode 6 Reactor Coolant Sys Boron Concentration ML20198N8301998-01-15015 January 1998 Proposed Tech Specs Pages Allowing Use of Moveable Incore Detector Thimble Reduction for Unit 1,cycle 19 ML20198P0791998-01-0808 January 1998 Proposed Tech Specs Pages Re Suppl 5 to 951214 LAR on Conformance of Administrative Controls Section 6 to Guidance of STS ML20198B1471997-12-29029 December 1997 Proposed TS marked-up & Revised Pages,Incorporating Changes Associated w/951214 LAR ML20212F0471997-10-28028 October 1997 Proposed Tech Specs Pages Revising TS Section 4.12,allowing Use of voltage-based SG Tube Repair Criteria ML20217F4761997-10-0303 October 1997 Suppl Proposed Tss,Allowing Use of New SG Tube Sleeve Designs & Installation & Exam Techniques ML20211H7581997-10-0101 October 1997 Proposed Tech Specs Re Physical Mods to Turbine Bldg Cooling Water Header Isolation Logic ML20217C5861997-09-26026 September 1997 Proposed Tech Specs Changes to TS 3.4.B to Change Minimum Conditions for AFW & Permit Startup Operations to Continue W/Inoperable Turbine Driven AFW Pump or Associated Sys Valves Due to Inability to Complete IST Requirements ML20216E4561997-09-0404 September 1997 Proposed Tech Specs,Supporting Conformance to TS Overtime Controls to NRC Guidance Issued 950409 ML20216D1141997-09-0202 September 1997 Proposed Tech Specs,Incorporating Use of New SG Tube Sleeve Designs & Installation & Exam Techniques ML20217M6191997-08-15015 August 1997 Proposed Tech Specs Incorporating C-E SG Welded Sleeve TR, CEN-629-P,Rev 1 ML20149J0251997-06-30030 June 1997 Tech Spec Change Pages B.3.8-2 & B.3.8-5 to Amend Re Spent Fuel Pool Personnel Access Doors ML20141F5011997-05-15015 May 1997 Proposed Tech Specs 3.1.C, Reactor Coolant Sys Leakage & 4.12, SG Tube Surveillance ML20141A0871997-05-0707 May 1997 Proposed Tech Specs Re Spent Fuel Pool Special Ventilation Sys ML20137T2081997-04-10010 April 1997 Proposed Tech Specs,Clarifying Amend Request Re Conformance of Administrative Controls Section 6 to Guidance of STS ML20135F7481997-03-0707 March 1997 Proposed Tech Specs Re Cooling Water Sys Emergency Intake Design Basis ML20135A9401997-02-21021 February 1997 Proposed Tech Specs,Allowing Use of Credit for Soluble Boron in Spent Fuel Pool Criticality Analyses ML20134L8901997-02-12012 February 1997 Proposed Tech Specs 3.3-3 Re Safety Injection Pump Low Temp Operations ML20134J6281997-02-0606 February 1997 Proposed Tech Specs 3.3 Re Engineered Safety Features ML20134E9421997-01-29029 January 1997 Proposed Tech Specs Revising Prairie Island Design Bases Re Cooling Water Emergency Intake ML20135A8251996-11-27027 November 1996 Proposed Tech Specs Incorporating New SG Tube Sleeve Designs & Installation & Exam Techniques ML20135A5091996-11-25025 November 1996 Proposed Tech Specs Implementing Mods Proposed by Suppl to License Amend Request & Revising TS Pp in Final Form to Reflect Changes Proposed by Suppl ML20134H3771996-11-0606 November 1996 Proposed Tech Specs of Appendix a Re Cooling Water Sys ML20134E4551996-10-25025 October 1996 Proposed Tech Specs Changing TS 4.4.A, Containment Leakage Tests, Bases to TS Section B.4.4, Containment Sys Tests & Adding TS.6.5.J, Containment Leakage Rate Testing Program ML20129E2591996-09-24024 September 1996 Proposed Tech Specs,Changing TS 4.12 to Incorporate Revised Acceptance Criteria for SG Tubes W/Degradation in Tubesheet Region ML20117P4311996-09-11011 September 1996 Proposed Tech Specs,Revising Plant TS Governing Cw Sys ML20117B2381996-08-15015 August 1996 Proposed Tech Specs 3.3.B.2 Re Containment Cooling Sys & Bases to Conform to Supporting Analyses ML20115G8121996-07-15015 July 1996 Proposed Tech Specs Re Moveable Incore Detector Thimble Reduction ML20095J7951995-12-14014 December 1995 Proposed Tech Specs for Conformance of Administrative Controls Section 6 to Guidance of STS ML20094S2791995-11-28028 November 1995 Proposed Tech Specs Re Radiological Effluent TS Conformance ML20087F3571995-08-0909 August 1995 Proposed Tech Specs Table TS 3.15-1,Pages 1 & 2 & Bases Page B.3.15-1 Marked Up to Implement License Amend Request 1999-08-31
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20211K6241999-08-31031 August 1999 Proposed Tech Specs,Changing ISFSI License Conditions 6,7 & 8 & TS 3/4.1 by Permitting Inclusion of Bpras & Thimble Plug Devices in Sf Assemblies Stored in TN-40 Casks ML20206R0621999-05-13013 May 1999 Proposed Tech Specs,Removing Plant Organization Structure Requirement ML20205S3331999-04-20020 April 1999 Proposed Tech Specs Changing Implementation Date for Relocation from TS to UFSAR of Requirements in TS 3.1.E & Flooding Shutdown Requirements in TS 5.1 ML20205Q0351999-04-12012 April 1999 Proposed Tech Specs,Relocating Shutdown Margin Requirements from TS to COLR ML20204H3601999-03-19019 March 1999 Proposed Tech Specs Removing Dates of Two NRC SERs & Correcting Dates of One SER Listed in Section 2.C.4, Fire Protection ML20207F2901999-03-0101 March 1999 Proposed Revised Tech Specs Incorporating Combustion Engineering SG Welded Tube Sleeve TR Rev ML20203A2181999-02-0505 February 1999 Proposed Tech Specs,Changing TS 4.12, SG Tube Surveillance to Incorporate Changes to ABB C-E Sleeve Design Assumptions & Installation Techniques ML20196B9721998-11-25025 November 1998 Proposed Tech Specs,Allowing Limited Inoperability of Bast Level Channels & Transfer Logic Channels to Provide for Required Testing & Maint of Associated Components ML20155G6321998-11-0303 November 1998 Proposed Tech Specs B.3.1-7 & B.3.1-7a,rev 133A Re Reactor Coolant Sys ML20154S2101998-10-23023 October 1998 Proposed Tech Specs Clarifying Conditions That Constitute Operable Irpi Sys Channels ML20195F1391998-10-0808 October 1998 Non-proprietary Version of Rev 1 to NSPNAD-97002, Steam Line Break Methodology ML20151U3651998-09-0404 September 1998 Proposed Tech Specs TS.3.1-5,TS.4.18-1 & B.4.18-1,clarifying SRs & LCOs for Operability for Reactor Coolant Vent Sys ML20237B5061998-08-12012 August 1998 Proposed Tech Specs Re Conformance of Administrative Controls Section 6 to Guidance of Std Tech Specs ML20151Z9181998-08-0303 August 1998 Rev 0 to 5AWI 6.1.2, Design Outputs,Review & Verification ML20151Z9011998-08-0303 August 1998 Rev 2 to 5AWI 6.1.0, Design Change General ML20236T6041998-07-20020 July 1998 Proposed Tech Specs Incorporating Elevated F* SG Tube Repair Criteria ML20249A7641998-06-11011 June 1998 Proposed Tech Specs Re Conformance of Administrative Controls Section 6 to Guidance of Std ML20216G0371998-04-13013 April 1998 Proposed Tech Specs 3.3 Re Engineered Safety Features ML20248M1421998-04-0606 April 1998 Draft NRC Insp Manual Temporary Instruction 2515/XXX Fire Protection Functional Insp (Fpfi) ML20216D0591998-03-0606 March 1998 Proposed Tech Specs Updating Heatup & Cooldown Rate Curves, Incorporating Use of Pressure & Temp Limits Rept & Changing Pressurizer PORVs Operability Temp ML20217P0061998-03-0404 March 1998 Proposed Tech Specs Re Status of Relocated Requirements ML20217N9771998-03-0202 March 1998 Proposed Tech Specs 3.8.D Re Spent Fuel Pool Special Ventilation Sys ML20217P1431998-03-0202 March 1998 Proposed Tech Specs Re Conformance of Administrative Controls Section 6 to Guidance of Std ML20202E5691998-02-10010 February 1998 Proposed Tech Specs 1-1 Re One Time Reduction of Mode 6 Reactor Coolant Sys Boron Concentration ML20198N8301998-01-15015 January 1998 Proposed Tech Specs Pages Allowing Use of Moveable Incore Detector Thimble Reduction for Unit 1,cycle 19 ML20198P0791998-01-0808 January 1998 Proposed Tech Specs Pages Re Suppl 5 to 951214 LAR on Conformance of Administrative Controls Section 6 to Guidance of STS ML20151Z9561998-01-0505 January 1998 Rev 0 to 5AWI 6.1.7, Design Change Work Orders ML20198B1471997-12-29029 December 1997 Proposed TS marked-up & Revised Pages,Incorporating Changes Associated w/951214 LAR ML20212F0471997-10-28028 October 1997 Proposed Tech Specs Pages Revising TS Section 4.12,allowing Use of voltage-based SG Tube Repair Criteria ML20151Z9441997-10-20020 October 1997 Rev 0 to 5AWI 6.1.6, Design Review & Approval ML20217F4761997-10-0303 October 1997 Suppl Proposed Tss,Allowing Use of New SG Tube Sleeve Designs & Installation & Exam Techniques ML20211H7581997-10-0101 October 1997 Proposed Tech Specs Re Physical Mods to Turbine Bldg Cooling Water Header Isolation Logic ML20217C5861997-09-26026 September 1997 Proposed Tech Specs Changes to TS 3.4.B to Change Minimum Conditions for AFW & Permit Startup Operations to Continue W/Inoperable Turbine Driven AFW Pump or Associated Sys Valves Due to Inability to Complete IST Requirements ML20216E4561997-09-0404 September 1997 Proposed Tech Specs,Supporting Conformance to TS Overtime Controls to NRC Guidance Issued 950409 ML20216D1141997-09-0202 September 1997 Proposed Tech Specs,Incorporating Use of New SG Tube Sleeve Designs & Installation & Exam Techniques ML20217M6191997-08-15015 August 1997 Proposed Tech Specs Incorporating C-E SG Welded Sleeve TR, CEN-629-P,Rev 1 ML20149J0251997-06-30030 June 1997 Tech Spec Change Pages B.3.8-2 & B.3.8-5 to Amend Re Spent Fuel Pool Personnel Access Doors ML20141F5011997-05-15015 May 1997 Proposed Tech Specs 3.1.C, Reactor Coolant Sys Leakage & 4.12, SG Tube Surveillance ML20141A0871997-05-0707 May 1997 Proposed Tech Specs Re Spent Fuel Pool Special Ventilation Sys ML20137T2081997-04-10010 April 1997 Proposed Tech Specs,Clarifying Amend Request Re Conformance of Administrative Controls Section 6 to Guidance of STS ML20137W3621997-03-17017 March 1997 Rev 2 to Test Procedure TR-228, Three Hour Fire Test of One and Three Hour Versawrap Raceway Fire Barrier Sys for Conduits & Cable Trays ML20135F7481997-03-0707 March 1997 Proposed Tech Specs Re Cooling Water Sys Emergency Intake Design Basis ML20135A9401997-02-21021 February 1997 Proposed Tech Specs,Allowing Use of Credit for Soluble Boron in Spent Fuel Pool Criticality Analyses ML20134L8901997-02-12012 February 1997 Proposed Tech Specs 3.3-3 Re Safety Injection Pump Low Temp Operations ML20134J6281997-02-0606 February 1997 Proposed Tech Specs 3.3 Re Engineered Safety Features ML20134E9421997-01-29029 January 1997 Proposed Tech Specs Revising Prairie Island Design Bases Re Cooling Water Emergency Intake ML20136H0101997-01-29029 January 1997 Rev 12 to Abnormal Procedure AB-3, Earthquakes ML20135A8251996-11-27027 November 1996 Proposed Tech Specs Incorporating New SG Tube Sleeve Designs & Installation & Exam Techniques ML20135A5091996-11-25025 November 1996 Proposed Tech Specs Implementing Mods Proposed by Suppl to License Amend Request & Revising TS Pp in Final Form to Reflect Changes Proposed by Suppl ML20138G8751996-11-0808 November 1996 Rev 2 to TN-40 Cask Unloading Procedure 1999-08-31
[Table view] |
Text
.
6 TS.3.3-3 l
RP! 91 10/27/99 3.3.A.2.g.
The valve position monitor lights or alarms for motor-operated valves specified in 3.3.A.1.g above may be inoperable for 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> provided the valve position is verified once each shift.
3.
At least one safety injection pump control switch in the control room shall be in pullout whenever RCS temperature is less than 310*F* except that both SI pumps may be run gg~p1Wi~[W while conducting the integrated SI testgf(when either{M,'~igt@he~^ ZG mi of t following conditions is met:
j (a) There is a steam or gas bubble in the pressurizer and ilijii}gjgggigpa}gjgtgijgf{the SI pump Mf@ggggj))
g"$Tffy'diccher;: :1 ze: cre shut, or (b) The reactor vessel head is removed.
4.
Both safety injection pump control switchesMg in the Control Room shall be in pullout whenever RCS temperature is less than 200*F (except jish]jjjgg]jsiiN[piiii@y@!@]as specified in 3.3.A.3 and 3.1.A.1.d.(2)).
.t:
- w..+ w.:.:
>e a.-~.m w~wn.w w wa~n a me omamn~manenn< mv~~.w.wswnAn<xw+~na.swe~ m~nw++wnwh~i"W"**~.**
- Ic ond >. nu.~ ;.u:,aitilonsa
_me._....__._
{
_. m_
, _ ~ ~ -. _. ~ ~. - -..
m..----
. - - - -~ -
p.2 uwmo.w-am --.
?4
- g!22;g ggg2 P
\\
B.3.3-2
- 3. 3 ' ENGINEERED SAFETY FEATURES Bases continued (1) Assuring with high reliability that the safety system will function properly if required to do so.
(2) Allowance of sufficient time to complete required repairs and testing using safe and proper procedures.
Assuming the reactor has been operating at fell RATED THERMAL POWER for at least 100 days, the magnitude of the decay heat decreases as follows after initiating HOT SHUTDOWN.
Time After Shutdown Decay Heat. % of RATED POWER 1 min.
4.5 i
30 min.
2.0 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> 1.62 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> 0.96 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> 0.62 Thus, the requirement for core cooling in case of a postulated loss-of-coolant accident while in the shutdown condition is significantly reduced below the requirements for a postulated loss-of-coolant acci-dent during POWER OPERATION.
Putting the reactor in the HOT SHUTDOWN condition significantly reduced the potential consequences of a loss-of coolant accident, and also allows more free access to some of the engineered safeguards components in order to effect repairs.
The accumulator and refueling water tank conditions specified are consistent with those assumed in the LOCA analysis (Reference 2).
Specification 3.3.A.3 allows use of an SI pump to perform operations required at low RCS temperatures; e.g.,
raising accumulator levels in order to meet the level requirement of Specification 3.3.A.1.b(2) or ASME Section XI tests of the SI system check valves.
Specification 3.3. A.3 also allows use of both SI pumps at low tempera-tures for conduct of the integrated SI testThsd?bthef751EWystemstists EhdNPMEUEfh551psdidiMIth(M$5MAININ1.eshnknhiNh0f'."ii~ Oil 7 case, pressurizer level is maintained at less than 50% andfaypdsitiiVs
--^ -'"* to prevent fluid injection into the RCS.$This$..S. 5E5 ear c
< i.s. o.v.l...s. s.E1.,6.n. 71 sin.r.,6V..w.f.ide..d.v.i.b..s.t...ssi..n. i:the SI pumps.c.E..h...d....R.. hU..x.;s.C ins.x.i..d. sFo fey T
R O
b A-+
vs. -
u
- A p,
c waw
"^'"^-
isolstibn Is7aEE6mpliishlEd[bfNsingeithiWsI61bisd@isualyyslyRoEMelbs e[m6 tat opefatsd@Alpejwithjthe{poweriremoirjdyThis combination of conditions under strict administrative control assure that over-pressurization cannot occur. The option of having the reactor vessel head removed is allowed since in this case RCS overpressurization cannot occur.
Maintaining both safety injection pump Control Room control switches in pullout, as specified in 3.3.A.4, will ensure that the RCS pressure /
temperature limitations specified in Figures TS.3.1-1 and TS.3.1-2 will not be exceeded, at low RCS temperatures, as the result of mass input into the RCS from an inadvertent safety injection pump start.$Ths provis ionsIo ff th tC a pedifihatiohiir ein6t$ap plis khlsEhhenith el(Ve ss to r hNS.'*kkih @epjedjsinc @M$hai[cMditioniRNhy@yes surizafilin can;nggieceurg
ATTACHMENT 2 SUPPLEMENT to LICENSE AMENDMENT REQUEST DATED February 6,1997 Amendment of Safety iniection Pumo low Temperature Operations Appendix A, Technical Specification Pages Revised Pages as proposed in this Supplement TS.3.3-3 B.3.3-2 1
1 4
m 4
r TS.3.3-3 a
3.3.A.2.g.
The valve position monitor lights or alarms for motor-operated 3
valves specified in 3.3.A.l.g above may be inoperable for 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> provided the valve position is verified once each shift.
3.
At least one safety injection pump control switch in the control room shall be in pullout whenever RCS temperature is less than 310*F* except that both SI pumps may be run for up to one hour while conducting the integrated SI test ** when either of the following conditions is met:
(a) There is a steam or gas bubble in the pressurizer and an isolation valve between the SI pump and the RCS is shut, or I-(b) The reactor vessel head is removed.
4 Both safety injection pump control switches *** in the Control Room shall be in pullout whenever RCS temperature is less than 200*F (except one or both pumps may be run as specified in 3.3.A.3 and 3.1.A.1.d.(2)).
- 0ther SI system tests and operations may also be conducted under these conditions.
- This specification does not apply whenever the reactor vessel head is removed.
B.3.3-2 l
- 3. 3
- ENGINEERED SAFETY FEATURES 1
Bases continued (1) Assuring with high reliability that the safety system will function properly if required to do so.
(2) Allowance of sufficient time to complete required repairs and testing using safe and proper procedures.
Assuming the reactor has been operating at full RATED THERMAL POWER for at least 100 days, the magnitude of the decay heat decreases as follows after initiating HOT SHUTDOWN.
Time After Shutdown Decay Heat. % of RATED POWER 1 min.
4.5 30 min.
2.0 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> 1.62 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> 0.96 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> 0.62 Thus, the requirement for core cooling in case of a postulated loss-of-coolant accident while in the shutdown condition is significantly reduced below the requirements for a postulated loss-of-coolant acci-dent during POWER OPERATION.
Putting the reactor in the HOT SHUTDOWN condition significantly reduced the potential consequences of a loss-of-coolant accident, and also allows more free access to some of the 1
engineered safeguards components in order to effect repairs.
The accumulator and refueling water tank conditions specified are consistent with those assumed in the LOCA analysis (Reference 2).
Specification 3.3.A.3 allows use of an SI pump to perfctm operations required at low RCS temperatures; e.g.,
raising accumulator levels in order to meet the level requirement of Specification 3.3.A.1.b(2) or ASME Section XI tests of the SI system check valves.
l Specification 3.3. A.3 also allows use of both SI pumps at low tempera-tures for conduct of the integrated SI test and other SI system tests and operations providing the pumps run for less than 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. In this case, pressurizer level is maintained at less than 50% and a positive means of isolation is provided between the SI pumps and the RCS to prevent fluid injection into the RCS. This isolation is accomplished by using either a closed manual valve or a closed motor operated valve with the power removed. This combination of conditions under strict administrative control assure that overpressurization cannot occur. The option of having the reactor vessel head removed is allowed since in this case RCS overpressurization cannot occur.
Maintaining both safety injection pump Control Room control switches in pullout, as specified in 3.3.A.4, will ensure that the RCS pressure /
temperature limitations specified in Figures TS.3.1-1 and TS.3.1-2 will not be exceeded, at low RCS temperatures, as the result of mass input into the RCS from an inadvertent safety injection pump start. The provisions of this specification are not applicable when the reactor vessel head is removed since in that condition RCS overpressurization can not occur.