ENS 51679

From kanterella
Revision as of 20:45, 1 March 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
ENS 51679 +/-
Where
Perry FirstEnergy icon.png
Ohio (NRC Region 3)
Reporting
10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown

10 CFR 50.72(b)(2)(iv)(B), RPS Actuation
LER: 05000440/LER-2016-001
Time - Person (Reporting Time:+-1.43 h-0.0596 days <br />-0.00851 weeks <br />-0.00196 months <br />)
Opened: David O'Donnell
00:56 Jan 24, 2016
NRC Officer: Daniel Mills
Last Updated: Jan 24, 2016
51679 - NRC Website
Loading map...