Title | Manual Reactor Scram Following Spurious Opening of Two Safety Relief Valves |
Event Description | At 1500 EST on February 8, 2016, two safety relief valves (SRV) opened upon a spurious Division 2 initiation signal. This caused suppression pool temperature to increase. At 1503 EST, plant operators took action to manually SCRAM the reactor at 95 degrees Fahrenheit in the suppression pool per plant procedures. The SRVs closed immediately following the scram at 1503 EST. The cause of the SRVs opening is currently under investigation.
During the scram, all rods fully inserted into the core. Reactor Pressure is stable with decay heat being removed via turbine bypass valves to the main condenser. Reactor level control is currently being maintained via feedwater. Main Steam Isolation Valves are open. Cool down and depressurization to Mode 4 to follow. The plant is in a normal post SCRAM electrical line-up. The licensee notified the NRC Resident Inspector. |
Where | |
---|---|
Perry Ohio (NRC Region 3) | |
Reporting | |
10 CFR 50.72(b)(2)(iv)(B), RPS Actuation | |
LER: | 05000440/LER-2016-002 |
Time - Person (Reporting Time:+-2.22 h-0.0925 days <br />-0.0132 weeks <br />-0.00304 months <br />) | |
Opened: | Michael Doty 17:50 Feb 8, 2016 |
NRC Officer: | Donald Norwood |
Last Updated: | Feb 8, 2016 |
51716 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 51716\u003C/a\u003E - \u003Ca href=\"/Perry\" title=\"Perry\"\u003EPerry\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EManual Reactor Scram Following Spurious Opening of Two Safety Relief Valves\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 51716 - Perry\n","link":"","lat":41.79572777777778,"lon":-81.145375,"icon":"/w/images/a/ad/FirstEnergy_icon.png"}],"imageoverlays":null} | |
Unit 1 | |
---|---|
Reactor critical | Critical |
Scram | Yes, Manual Scram |
Before | Power Operation (100 %) |
After | Hot Shutdown (0 %) |
WEEKMONTHYEARENS 566732023-08-10T04:39:00010 August 2023 04:39:00
[Table view]10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation, 10 CFR 50.72(b)(2)(iv)(A), System Actuation - ECCS Discharge Automatic Reactor Trip ENS 562982023-01-05T17:42:0005 January 2023 17:42:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(2)(iv)(A), System Actuation - ECCS Discharge Automatic Reactor Scram ENS 541852019-07-27T23:29:00027 July 2019 23:29:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(2)(iv)(A), System Actuation - ECCS Discharge Automatic Reactor Scram Due to Main Turbine Trip ENS 538962019-02-25T05:24:00025 February 2019 05:24:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Automatic Reactor Scram Due to Generator Trip ENS 517162016-02-08T20:03:0008 February 2016 20:03:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Manual Reactor Scram Following Spurious Opening of Two Safety Relief Valves ENS 516792016-01-24T02:22:00024 January 2016 02:22:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Ts Required Shutdown Due to Unidentified Leakage in Drywell ENS 506012014-11-07T13:47:0007 November 2014 13:47:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation, 10 CFR 50.72(b)(2)(iv)(A), System Actuation - ECCS Discharge Automatic Reactor Scram Due to Loss of Feedwater ENS 505512014-10-20T06:18:00020 October 2014 06:18:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation, 10 CFR 50.72(b)(2)(iv)(A), System Actuation - ECCS Discharge Automatic Reactor Scram on Loss of Feedwater ENS 486882013-01-22T08:32:00022 January 2013 08:32:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation, 10 CFR 50.72(b)(2)(iv)(A), System Actuation - ECCS Discharge Automatic Reactor Protection System Actuation ENS 477102012-03-01T05:00:0001 March 2012 05:00:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Manual Reactor Protection System Actuation Due to Automatic Turbine Runback ENS 459182010-05-12T03:18:00012 May 2010 03:18:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Manual Reactor Scram Due to Loss of Control Rod Drive Charging Water Header Pumps ENS 454402009-10-16T04:48:00016 October 2009 04:48:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Manual Reactor Scram Due to Reactor Recirculation Pump Trip ENS 451472009-06-21T21:50:00021 June 2009 21:50:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Automatic Reactor Scram Related to a Main Turbine Trip ENS 438082007-11-28T12:32:00028 November 2007 12:32:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation, 10 CFR 50.72(b)(2)(iv)(A), System Actuation - ECCS Discharge Reactor Scram and Eccs Injection ENS 433632007-05-15T04:58:00015 May 2007 04:58:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Reactor Scram During Testing ENS 430492006-12-13T09:35:00013 December 2006 09:35:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Reactor Scram - Loss of Instrument Air Resulting in Feedwater Transient and Manual Reactor Scram ENS 413102005-01-06T06:12:0006 January 2005 06:12:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Manual Reactor Scram Due to Reactor Recirculation Pump Trip ENS 412902004-12-24T04:54:00024 December 2004 04:54:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Reactor Scram Following Down Shift of Both Recirc Pumps from Fast to Slow Speed 2023-08-10T04:39:00 | |
Retrieved from "https://kanterella.com/w/index.php?title=ENS_51716&oldid=421181"