ENS 57136
ENS Event | |
|---|---|
08:00 May 23, 2024 | |
| Title | Technical Specification Required Shutdown |
| Event Description | The following information was provided by the licensee via email:
At 0400 EDT on May 23, 2024, a technical specification required shutdown was initiated at Perry. Technical specification action 3.4.5 condition B [unidentified reactor coolant system leakage exceeds 5 gallons per minute] was entered on May 23, 2024 at 0000 with a required action to reduce leakage to within limits within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, due by 0400 on May 23, 2024. This required action was not completed within the completion time, therefore, a technical specification required shutdown was initiated, and this event is being reported as a four-hour, non-emergency notification per 10 CFR 50.72(b)(2)(i). There was no impact on the health and safety of the public or plant personnel. The NRC Resident Inspector has been notified. The following additional information was obtained from the licensee in accordance with Headquarters Operations Officers Report Guidance: The reactor coolant leakage was stable at approximately 6 gallons per minute. |
| Where | |
|---|---|
| Perry Ohio (NRC Region 3) | |
| Reporting | |
| 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown | |
| LER: | 05000440/LER-2024-003 Technical Specification Required Shutdown Due to Increase in RCS Unidentified Leakage |
| Time - Person (Reporting Time:+-3.58 h-0.149 days <br />-0.0213 weeks <br />-0.0049 months <br />) | |
| Opened: | Darin Smith 04:25 May 23, 2024 |
| NRC Officer: | Adam Koziol |
| Last Updated: | May 23, 2024 |
| 57136 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 57136\u003C/a\u003E - \u003Ca href=\"/Perry\" title=\"Perry\"\u003EPerry\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003ETechnical Specification Required Shutdown\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 57136 - Perry\n","link":"","lat":41.79572777777778,"lon":-81.145375,"icon":"/w/images/a/ad/FirstEnergy_icon.png"}],"imageoverlays":null} | |
Unit 1 | |
|---|---|
| Reactor critical | Critical |
| Scram | No |
| Before | Power Operation (40 %) |
| After | Power Operation (40 %) |
WEEKMONTHYEARENS 571362024-05-23T08:00:00023 May 2024 08:00:00
[Table view]10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Technical Specification Required Shutdown ENS 530002017-10-04T06:50:0004 October 2017 06:50:00 10 CFR 50.72(b)(3)(v)(B), Loss of Safety Function - Remove Residual Heat, 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident, 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown, 10 CFR 50.72(b)(3)(v)(C), Loss of Safety Function - Release of Radioactive Material Perry Commenced Technical Specification Required Shutdown ENS 516792016-01-24T02:22:00024 January 2016 02:22:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Ts Required Shutdown Due to Unidentified Leakage in Drywell ENS 498042014-02-07T11:00:0007 February 2014 11:00:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Plant Shutdown Required by Technical Specifications Due to Containment Isolation Valve Over Leak Rate Limit ENS 491212013-06-16T04:00:00016 June 2013 04:00:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown, 10 CFR 50.72(b)(3)(ii)(A), Seriously Degraded Technical Specification Shutdown Due to Small Reactor Coolant Leak on a Recirculation Flow Control Valve Vent Line ENS 473122011-10-02T05:00:0002 October 2011 05:00:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Shutdown Required by Technical Specifications Due to Transformer Fault ENS 459182010-05-12T03:18:00012 May 2010 03:18:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Manual Reactor Scram Due to Loss of Control Rod Drive Charging Water Header Pumps ENS 454342009-10-15T16:25:00015 October 2009 16:25:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Unit Commenced Shutdown Due to Inoperable Division 2 Emergency Service Water System ENS 416572005-05-02T10:11:0002 May 2005 10:11:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Technical Specification Required Shutdown - Reactor Vessel Level Instrumentation ENS 410852004-10-02T19:00:0002 October 2004 19:00:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Reactor Power Being Reduced Due to Entering Ts 3.0.3 Because of Inopeable Recirc Vent System ENS 407672004-05-21T20:00:00021 May 2004 20:00:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Technical Specification Shutdown 2024-05-23T08:00:00 | |