ENS 40767
From kanterella
Jump to navigation
Jump to search
ENS Event | |
---|---|
20:00 May 21, 2004 | |
Title | Technical Specification Shutdown |
Event Description | Emergency Service Water "A" (ESW) Pump failure results in inoperability of all Div 1 ECCS systems. The plant entered the Limiting Condition for Operation for the ESW inoperability at 0150 on 05/21/04. The action times for Tech Spec 3.7.1 are as follows: restore ESW to operable status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, if this cannot be accomplished be in Mode 3 (Hot Shutdown) in the following 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and Mode 4 (Cold Shutdown) in 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. Reactor power was reduced at 1600 to begin the shutdown process. Division 2 and 3 ECCS are fully operable.
The NRC Resident Inspector was notified of this event by the licensee. |
Where | |
---|---|
Perry Ohio (NRC Region 3) | |
Reporting | |
10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown | |
LER: | 05000440/LER-2004-001 |
Time - Person (Reporting Time:+-3.82 h-0.159 days <br />-0.0227 weeks <br />-0.00523 months <br />) | |
Opened: | Jim Case 16:11 May 21, 2004 |
NRC Officer: | John Mackinnon |
Last Updated: | May 21, 2004 |
40767 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 40767\u003C/a\u003E - \u003Ca href=\"/Perry\" title=\"Perry\"\u003EPerry\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003ETechnical Specification Shutdown\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 40767 - Perry\n","link":"","lat":41.79572777777778,"lon":-81.145375,"icon":"/w/images/a/ad/FirstEnergy_icon.png"}],"imageoverlays":null} | |
Unit 1 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (100 %) |
After | Power Operation (100 %) |
WEEKMONTHYEARENS 571362024-05-23T08:00:00023 May 2024 08:00:00
[Table view]10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Technical Specification Required Shutdown ENS 530002017-10-04T06:50:0004 October 2017 06:50:00 10 CFR 50.72(b)(3)(v)(B), Loss of Safety Function - Remove Residual Heat, 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident, 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown, 10 CFR 50.72(b)(3)(v)(C), Loss of Safety Function - Release of Radioactive Material Perry Commenced Technical Specification Required Shutdown ENS 516792016-01-24T02:22:00024 January 2016 02:22:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Ts Required Shutdown Due to Unidentified Leakage in Drywell ENS 498042014-02-07T11:00:0007 February 2014 11:00:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Plant Shutdown Required by Technical Specifications Due to Containment Isolation Valve Over Leak Rate Limit ENS 491212013-06-16T04:00:00016 June 2013 04:00:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown, 10 CFR 50.72(b)(3)(ii)(A), Seriously Degraded Technical Specification Shutdown Due to Small Reactor Coolant Leak on a Recirculation Flow Control Valve Vent Line ENS 473122011-10-02T05:00:0002 October 2011 05:00:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Shutdown Required by Technical Specifications Due to Transformer Fault ENS 459182010-05-12T03:18:00012 May 2010 03:18:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Manual Reactor Scram Due to Loss of Control Rod Drive Charging Water Header Pumps ENS 454342009-10-15T16:25:00015 October 2009 16:25:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Unit Commenced Shutdown Due to Inoperable Division 2 Emergency Service Water System ENS 416572005-05-02T10:11:0002 May 2005 10:11:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Technical Specification Required Shutdown - Reactor Vessel Level Instrumentation ENS 410852004-10-02T19:00:0002 October 2004 19:00:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Reactor Power Being Reduced Due to Entering Ts 3.0.3 Because of Inopeable Recirc Vent System ENS 407672004-05-21T20:00:00021 May 2004 20:00:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Technical Specification Shutdown 2024-05-23T08:00:00 | |
Retrieved from "https://kanterella.com/w/index.php?title=ENS_40767&oldid=93328"